It was also noted that provisions of TOR prescribed for the project have not<br />

been complied with. The Committee observed that the present proposal is silent<br />

on the aspect of impact of NOx emission on the atmosphere and the health<br />

implications. Therefore, the Committee suggested that these aspects need to<br />

be studied and incorporated in the EIA/EMP report.<br />

The proponent was also advised to submit soft copies of Form-I, Feasibility<br />

report, EIA/EMP report and its addendum (if any), Public Hearing proceedings,<br />

MoU/FSA for fuel etc.(if already not done) to the Ministry.<br />

The Committee therefore decided that the project was premature for<br />

consideration and advised the project proponent to come fully prepared<br />

with point wise TOR compliance. Accordingly the proposal was deferred<br />

for reconsideration at a later stage.<br />

2.4 2x600 MW and 3x800 MW Coal Based TPP of M/s IL&FS Tamil<br />

Nadu Power Company Ltd. at villages Kottatai, Ariyagosthi,<br />

Villianallur & Silambimangalam, in Chidambaram Taluk, in<br />

Cuddalore, District, in Tamil Nadu - reg. review of EC.<br />

In pursuance to the Order of the Hon’ble National Green Tribunal, dated<br />

23.05.2012, the review of environmental clearance accorded to 2x600 MW and<br />

3x800 MW Coal Based TPP of M/s IL&FS Tamil Nadu Power Company Ltd. at<br />

villages Kottatai, Ariyagosthi, Villianallur & Silambimangalam, in<br />

Chidambaram Taluk, in Cuddalore, District, in Tamil Nadu was taken up.<br />

Representatives of M/s IL&FS Tamil Nadu Power Company Ltd. informed the<br />

Committee that the Appellants in the matter were served with copy of updated<br />

RIA Report incorporating rapid cumulative environment impact assessment.<br />

In the meanwhile, the Ministry received a letter purportedly signed by the three<br />

Appellants communicating their inability to be present in the meeting as they<br />

required some more time to study the report made available to them.<br />

M/s IL&FS Tamil Nadu Power Company Ltd gave a brief presentation on the<br />

cumulative marine impact assessment.<br />

During the deliberations the Committee observed that while the cumulative<br />

impacts of all proposed power plants and refinery etc. in 25 kms was dealt<br />

with, the issue of social impact assessment study appeared not to be<br />

adequately covered. It was observed that any meaningful social impact<br />

assessment study needs to be based on detailed socio-economic data and<br />

livelihood source data of the population of the region. Information on<br />

marginalized section of society either due to land lost (owned or dependent on<br />

the land for livelihood) to industry or due to indirect impact of industrial<br />

activity, needs appropriate and authentic method of assessment.<br />

10