M/s Hassan Thermal Power Pvt. Ltd. was accorded environmental clearance for<br />

its 1x500 MW Imported Coal Based Thermal Power Plant in KIDB notified<br />

industrial area at villages Dobba Basavanahalli, Dobba Honnenahalli,<br />

Kachandyakanahalli and Bustanhalli, in Hassan Taluk, district Hassan in<br />

Karnataka on 17.02.2012.<br />

M/s Hassan Thermal Power Pvt. Ltd. have now informed that Govt. of<br />

Karnataka has directed them to opt for 1x660 MW Super-critical Technology<br />

instead of 1x500 MW Sub-Critical Technology, in view of volatility of imported<br />

coal price and issues associated and considering that with 1x660 MW Super-<br />

Critical, techno economic benefits to the State will be advantageous and<br />

therefore to the consumers.<br />

M/s Hassan Thermal Power Pvt. Ltd. also presented the increase in coal<br />

consumption and subsequent incremental environmental pollutants.<br />

The Committee deliberated the data presented and decided that with a<br />

marginal increase in coal consumption, Super-Critical Technology can give a<br />

large output of electricity and therefore the request could be agreed to. The<br />

Committee also observed that the Govt. of India Policy is also to opt for more<br />

efficient technology and therefore the request could be favorably considered.<br />

The Committee, therefore, recommended that the Ministry may do further<br />

needful in the matter.<br />

3.0 Any other item with permission of the Chair:<br />

3.1 Discussion of report of the Sub-Group of EAC on visit to Trombay<br />

TPPS of M/s Tata Power Co. Ltd. - reg.<br />

The report of the Sub-Group of EAC on visit to Trombay TPPS of M/s Tata<br />

Power Co. Ltd. was presented.<br />

The Committee deliberated point wise recommendation of the sub-group and<br />

unanimously accepted the report.<br />

The Committee decided that additional TOR conditions for the modernization/<br />

change in fuel proposal of M/s Tata Power Company Ltd. for its Unit -6, in<br />

accordance with the recommendation of the Sub-Groups report could be<br />

prescribed by the Ministry.<br />

3.2 540 MW (4x135 MW) Coal based Power Plant of M/s Vadana Vidyut<br />

Pvt. Ltd. at Chhuri, Salora, Gangpur, Darrabhata&Jhora, Tehsil<br />

Katghora, District Korba, Chhattisgarh- reg. Amendment in EC<br />

M/s Vadana Vidyut Pvt. Ltd. was accorded environmental clearance for 540<br />

MW (4x135 MW) Coal based Thermal Power Plant at Chhuri, Salora, Gangpur,<br />

27