part of CSR activity. Accordingly it was decided that the project proponent shall<br />

revise CSR action plan and provide committed expenditure with activity wise<br />

breakup to the Ministry both onetime Capital expenditure during construction<br />

phase as also annual CSR expenditure till the running of the plant.<br />

The Committee also decided that the project proponent shall monitor heavy<br />

metals and radio activity concentration in ground water around ash pond and<br />

formulate appropriate mechanism for continuous monitoring of these<br />

parameters. Accordingly mechanism to be adopted and agency to be involved<br />

shall be communicated to the Ministry.<br />

The Committee discussed in detail the Public Hearing issues raised in the<br />

Public Hearing held on 23.09.2009 and the response provided by the project<br />

proponent. The major issues raised were regarding adoption of environment<br />

protection technology; provision of employment to the local people; fluoride in<br />

ground water; ground water contamination with heavy metals; impact on<br />

agriculture and Rihand Dam due to fly ash; transportation of coal and lack of<br />

medical facilities etc.<br />

The Committee noted that many of the issues raised were not directly related<br />

with pollution arising from the plant alone. The project proponent, as proactive<br />

measure, shall ensure that all possible engineering solutions are adopted in<br />

running the plant in conformity with environmental requirements including the<br />

proposed expansion as a model plant with sound environmental integrity.<br />

It was further noted that soft copies of Form-I, Feasibility report, EIA/EMP<br />

report and its addendum, public hearing proceedings, MoU/FSA for fuel etc.<br />

shall be first submitted (if not already done).<br />

Based on the information and clarifications provided, the Committee<br />

recommends the project for environmental clearance subject to stipulation of<br />

the following specific conditions:<br />

(i)<br />

(ii)<br />

(iii)<br />

Harnessing solar power within the premises of the plant particularly at<br />

available roof tops shall be undertaken and status of implementation<br />

shall be submitted periodically to the Regional Office of the Ministry.<br />

Sulphur and ash contents in the coal to be used in the project shall not<br />

exceed 0.5% and 40 % respectively at any given time. In case of<br />

variation of coal quality at any point of time, fresh reference shall be<br />

made to the Ministry for suitable amendments to environmental<br />

clearance condition wherever necessary.<br />

Stack of 100 m height shall be provided with continuous online<br />

monitoring equipments for SOx, NOx and Particulate Matter (PM2.5 &<br />

PM10). Exit velocity of flue gases shall not be less than 22 m/sec.<br />

Mercury emissions from stack shall also be monitored on periodic basis.<br />