k) Tsunami Emergency Management Plan shall be prepared and plan<br />

submitted prior to the commencement of construction work.<br />

l) There should not be any contamination of soil, ground and surface<br />

waters (canals & village pond) with sea water in and around the project<br />

sites. In other words necessary preventive measures for spillage from<br />

pipelines, such as lining of guard pond used for the treatment of outfall<br />

before discharging into the sea and surface RCC channels along the<br />

pipelines of outfall and intake should be adopted. This is just because<br />

the areas around the projects boundaries is fertile agricultural land used<br />

for paddy cultivation.<br />