16.01.2015 Views

Floodplain Management in Illinois - Illinois Department of Natural ...

Floodplain Management in Illinois - Illinois Department of Natural ...

Floodplain Management in Illinois - Illinois Department of Natural ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Th<strong>in</strong>k Carefully About Variances<br />

Your community must assure that some very specific conditions<br />

are satisfied <strong>in</strong> order for a proposal to qualify for a variance.<br />

BFE<br />

LOWEST FLOOR<br />

BELOW BFE<br />

A variance to build below the BFE may be granted, but flood<br />

<strong>in</strong>surance will be very expensive – perhaps more than $1,500<br />

per year (see page 18)!<br />

A variance to build below the base flood elevation could<br />

expose your family and future owners to more damage and<br />

unsafe conditions.<br />

Post-FIRM build<strong>in</strong>g,<br />

not elevated<br />

Some variances are issued with special conditions. You must<br />

comply or you could be cited for a violation.<br />

Th<strong>in</strong>k carefully about seek<strong>in</strong>g a variance to build below the base flood elevation.<br />

Not only will your property be more likely to get damaged, but <strong>in</strong>surance will be very costly.<br />

34<br />

ILLINOIS QUICK GUIDE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!