Section 1<br />

Introduction and Summary<br />

1.1 Introduction<br />

This edition of <strong>Track</strong> <strong>Record</strong> provides details on the performance of public transport services in Vic<strong>to</strong>ria<br />

for the period from <strong>Oc<strong>to</strong>ber</strong> <strong>to</strong> <strong>December</strong> <strong>2009</strong> (referred <strong>to</strong> as the <strong>December</strong> quarter <strong>2009</strong>).<br />

During that period, new franchise contracts for the operation of Melbourne’s passenger train and tram<br />

networks commenced. From 30 November <strong>2009</strong>, Metro Trains Melbourne (operating as Metro) and<br />

Keolis Downer EDI (operating as Yarra Trams (KDR)) commenced eight-year contracts with the<br />

Vic<strong>to</strong>rian Government.<br />

The new contracts and cus<strong>to</strong>mer charters include revised definitions for punctuality and reliability measures<br />

and new service level thresholds for passenger compensation:<br />

• Metropolitan trains and tram services are now regarded as punctual if they arrive no earlier than 59 seconds<br />

before and no later than four minutes and 59 seconds after the timetabled arrival time.<br />

• Reliability for metropolitan trains and trams is now based on the percentage of the timetable delivered.<br />

Performances measures for regional trains and coaches and for metropolitan buses are unchanged.<br />

Further explanations and threshold details are outlined in the Glossary at the back of this bulletin.<br />

To enable comparisons of performance of current and past performance, punctuality and reliability figures<br />

based on both the new and former measures are provided in Section 2 of this bulletin.<br />

The means by which the new franchisees are funded has also changed including the method by which<br />

incentive and penalty payments are determined. These changes are explained in the Payments section<br />

of this bulletin.<br />

Please note:<br />

Metropolitan trains =<br />

Connex (<strong>Oc<strong>to</strong>ber</strong> 1 –<br />

November 29) and Metro<br />

(November 30 – <strong>December</strong> 31)<br />

Metropolitan trams =<br />

Yarra Trams operated by Metrolink<br />

(<strong>Oc<strong>to</strong>ber</strong> 1 – November 29)<br />

and KDR (November 30 – <strong>December</strong> 31<br />

Regional trains<br />

= V/Line Passenger<br />

3<br />