Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 2<br />
Punctuality and Reliability<br />
For an explanation of how punctuality and reliability is determined, please refer <strong>to</strong> the Glossary on page 20.<br />
2.1 Punctuality<br />
Please note: punctuality outcomes for metropolitan trains and trams discussed in the text below are based<br />
on revised measures introduced in the new franchise contracts, ie, punctual <strong>to</strong> 4 minutes and 59 seconds.<br />
Details of the results under both the previous and current measures appear in Table 1.<br />
Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />
Metropolitan train<br />
punctuality in the<br />
<strong>December</strong> quarter<br />
<strong>2009</strong> was 86.0 per cent.<br />
This is lower than in<br />
the September quarter<br />
(88.6 per cent) and<br />
the <strong>December</strong> quarter<br />
2008 (90.9 per cent).<br />
Tram punctuality<br />
(average over route) in<br />
the <strong>December</strong> quarter<br />
<strong>2009</strong> (82.2 per cent)<br />
was comparable<br />
with the previous<br />
quarter (82.3 per cent)<br />
and higher than the<br />
<strong>December</strong> quarter<br />
2008 (78.5 per cent).<br />
Regional train<br />
punctuality was 84.8 per<br />
cent in the <strong>December</strong><br />
quarter <strong>2009</strong>, lower than<br />
in the previous quarter<br />
(89.3 per cent) and<br />
the <strong>December</strong> quarter<br />
2008 (88.2 per cent).<br />
Metropolitan buses.<br />
Metropolitan bus<br />
punctuality was 93.9 per<br />
cent in the <strong>December</strong><br />
quarter <strong>2009</strong>. This<br />
is comparable with<br />
the previous quarter<br />
result (94.2 per cent).<br />
Table 1 On-time performance for trains, trams and buses as a percentage of<br />
services run, <strong>December</strong> quarter 2008 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Oct-Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sept<br />
<strong>2009</strong><br />
Oct-Dec<br />
<strong>2009</strong><br />
Metropolitan trains<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
90.9<br />
94.2<br />
85.1<br />
88.7<br />
86.3<br />
90.2<br />
88.6<br />
92.4<br />
86.0<br />
90.7<br />
Metropolitan trams –<br />
average over route<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
78.5<br />
81.9<br />
77.9<br />
81.4<br />
80.0<br />
83.5<br />
82.3<br />
85.3<br />
82.2<br />
85.3<br />
Metropolitan trams<br />
– at destination<br />
V/Line Passenger<br />
trains<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
66.8<br />
71.8<br />
66.2<br />
71.2<br />
68.9<br />
74.0<br />
71.9<br />
76.6<br />
71.8<br />
76.7<br />
88.2 82.0 86.5 89.3 84.8<br />
Metropolitan buses 93.7 94.5 94.5 94.2 93.9<br />
5<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>