17.01.2015 Views

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 2<br />

Punctuality and Reliability<br />

For an explanation of how punctuality and reliability is determined, please refer <strong>to</strong> the Glossary on page 20.<br />

2.1 Punctuality<br />

Please note: punctuality outcomes for metropolitan trains and trams discussed in the text below are based<br />

on revised measures introduced in the new franchise contracts, ie, punctual <strong>to</strong> 4 minutes and 59 seconds.<br />

Details of the results under both the previous and current measures appear in Table 1.<br />

Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />

Metropolitan train<br />

punctuality in the<br />

<strong>December</strong> quarter<br />

<strong>2009</strong> was 86.0 per cent.<br />

This is lower than in<br />

the September quarter<br />

(88.6 per cent) and<br />

the <strong>December</strong> quarter<br />

2008 (90.9 per cent).<br />

Tram punctuality<br />

(average over route) in<br />

the <strong>December</strong> quarter<br />

<strong>2009</strong> (82.2 per cent)<br />

was comparable<br />

with the previous<br />

quarter (82.3 per cent)<br />

and higher than the<br />

<strong>December</strong> quarter<br />

2008 (78.5 per cent).<br />

Regional train<br />

punctuality was 84.8 per<br />

cent in the <strong>December</strong><br />

quarter <strong>2009</strong>, lower than<br />

in the previous quarter<br />

(89.3 per cent) and<br />

the <strong>December</strong> quarter<br />

2008 (88.2 per cent).<br />

Metropolitan buses.<br />

Metropolitan bus<br />

punctuality was 93.9 per<br />

cent in the <strong>December</strong><br />

quarter <strong>2009</strong>. This<br />

is comparable with<br />

the previous quarter<br />

result (94.2 per cent).<br />

Table 1 On-time performance for trains, trams and buses as a percentage of<br />

services run, <strong>December</strong> quarter 2008 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Oct-Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sept<br />

<strong>2009</strong><br />

Oct-Dec<br />

<strong>2009</strong><br />

Metropolitan trains<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

90.9<br />

94.2<br />

85.1<br />

88.7<br />

86.3<br />

90.2<br />

88.6<br />

92.4<br />

86.0<br />

90.7<br />

Metropolitan trams –<br />

average over route<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

78.5<br />

81.9<br />

77.9<br />

81.4<br />

80.0<br />

83.5<br />

82.3<br />

85.3<br />

82.2<br />

85.3<br />

Metropolitan trams<br />

– at destination<br />

V/Line Passenger<br />

trains<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

66.8<br />

71.8<br />

66.2<br />

71.2<br />

68.9<br />

74.0<br />

71.9<br />

76.6<br />

71.8<br />

76.7<br />

88.2 82.0 86.5 89.3 84.8<br />

Metropolitan buses 93.7 94.5 94.5 94.2 93.9<br />

5<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!