Annual Report - 2001 - ARC Resources Ltd.
Annual Report - 2001 - ARC Resources Ltd.
Annual Report - 2001 - ARC Resources Ltd.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PAGE 14<br />
FEATURE: QUALITY ASSETS<br />
A CLOSE-UP ANALYSIS<br />
SUBSEQUENT TO ACQUIRING THE PROPERTY, <strong>ARC</strong> COMPLETED A DETAILED<br />
TECHNICAL REVIEW. SEVEN MONTHS AFTER GAINING OPERATORSHIP, <strong>ARC</strong><br />
COMMENCED DRILLING THE FIRST OF SEVEN DEVELOPMENT WELLS. EACH WELL<br />
WAS SUCCESSFUL AND, MORE IMPORTANTLY, THE RESULTS CONFIRMED <strong>ARC</strong>’S<br />
EXPECTATIONS, WHICH LED TO PLANS FOR ADDITIONAL PHASES<br />
OF DEVELOPMENT.<br />
WITH NEW INFORMATION GAINED FROM THE SUCCESS OF THE INITIAL DRILLING<br />
PROGRAM, WORK CONTINUED ON REFINING THE MAPPING OF THE RESERVOIR.<br />
WHILE THE TECHNICAL TEAM WAS ASSESSING THE AREA’S ULTIMATE POTENTIAL, THE<br />
PROPERTY’S PRODUCTION INCREASED AS A RESULT OF THE RECENTLY DRILLED<br />
WELLS. HIGHER GAS PRODUCTION RESULTED FROM THE EASING OF FACILITY<br />
CONSTRAINTS THROUGH ADDITIONAL COMPRESSION.<br />
Group: Scott Reynolds, Bruce Hall, Brad Wilson<br />
Inset: Diana Meads<br />
<strong>ARC</strong> ENERGY TRUST AR <strong>2001</strong>