22.01.2015 Views

instructions for installation, use and maintenance rais 2:1 - Robeys Ltd

instructions for installation, use and maintenance rais 2:1 - Robeys Ltd

instructions for installation, use and maintenance rais 2:1 - Robeys Ltd

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENGLISH RAIS ­ manual <strong>for</strong> Rais 2:1<br />

The flue ways consist of a baffle plate <strong>and</strong> a smoke<br />

conductor above. Both parts are made of Vermiculite.<br />

H<strong>and</strong>le these parts carefully.<br />

Lift the baffle plate a little <strong>and</strong> push towards one of the<br />

sides.<br />

Remove the baffle plate by lifting it upwards <strong>and</strong> tilting<br />

on it’s end. The other end is lowered <strong>and</strong> the baffle<br />

plate turned a little.<br />

Gently take out the baffle plate.<br />

Remove the smoke conductor, which is positioned<br />

above the baffle plate. Lift one side up <strong>and</strong> lower the<br />

other. Gently lower the smoke conductor <strong>and</strong> remove it.<br />

Now there is a clear view of the smoke exit.<br />

Remove any dirt / dust <strong>and</strong> put the parts back in, in<br />

reverse order.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!