Surat Tek Park - Arrow Energy
Surat Tek Park - Arrow Energy
Surat Tek Park - Arrow Energy
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong><br />
<strong>Arrow</strong> <strong>Energy</strong> - demonstrating<br />
coexistence<br />
July 2012
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> – What is it<br />
Technology Trial – to trial more ‘farm compatible’ drilling technologies.<br />
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> will consist of 2 well pads – each consisting of 7 wells<br />
1 pad trialling Electric Submersible Pumps (ESP’s) in Deviated from Vertical Wells<br />
1 pad trialling Gas Lift Mandrels (GL) in Slant Wells<br />
Where<br />
Theten – <strong>Arrow</strong> owned property<br />
When<br />
1 st Pad of 7 wells to be drilled Q3 2012<br />
Production<br />
Q2 2013 - into existing <strong>Arrow</strong> Infrastructure – Daandine Central Gas Processing Facility<br />
2
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> – Farmland Compatible<br />
Current <strong>Surat</strong> Basin Design<br />
• Vertical Production Well<br />
• Single Well 800m Graticular Pattern<br />
(ranges from 700m – 1500m)<br />
• Individual well surface facilities<br />
• Regular Operator intervention/access<br />
• Multiple access tracks<br />
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> Trial<br />
• Horizontal Directional Drilling<br />
• Wells on a Single Pad – 190m x 70m<br />
• Shared surface facilities<br />
• Less operator intervention/access<br />
• Reduced surface disturbance<br />
• Ease of cropping around single pad<br />
rather than multiple wells<br />
• Single access track<br />
3
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> – What technologies are being trialled<br />
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> is a Technology Trial<br />
What technologies are being trialled<br />
• Pad Wells to reduce land impact<br />
• Electric Submersible Pumps to reduce workover frequency<br />
• Gas Lift to reduce workover frequency<br />
• Deviated from Vertical Wells to drill under crops<br />
• Automated Instrumentation & Controls to reduce physical<br />
visitation onto private properties<br />
4
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> – alternative artificial lift trials<br />
Typical ESP well design<br />
Due for Completion<br />
Q4 2012<br />
Typical Gas Lift well design<br />
Due for Completion<br />
Q2 2013<br />
5
<strong>Surat</strong> <strong>Tek</strong> <strong>Park</strong> – Benefits to <strong>Arrow</strong> & Landholders<br />
• Reduced land access requirements and improved farmland compatible<br />
operations<br />
• Reduced landowner surface impact and liability<br />
• Pad facilities shared between wells reduces infrastructure<br />
• Reduced flowline requirements<br />
• More efficient production operations<br />
• Reduced ‘road-time’ requirement for operators<br />
• Reduce ‘access roads’ construction requirements<br />
6