Buildings that have been demolished or renovated must be registered<br />

and a report compiled that confi rms that environmentally hazardous<br />

materials and substances were sorted correctly. This registration must<br />

also cover waste that is directly recyclable.<br />

Documentation must be provided for all forms of demolition work in<br />

accordance with the standards set by the demolition industry’s control<br />

system in 1996.<br />

All materials from construction or civil-works projects that involve<br />

demolition must be sorted and recycled as far as possible.<br />

Optimal management and sorting of waste from construction and<br />

civil-works projects can be ensured by setting up a specifi c contract to<br />

manage waste and impacts on the environment.<br />

Documentation<br />

Documentation must be submitted along with the application to the<br />

authorities that the necessary space has been set aside for waste and<br />

that there is unimpeded access to permit waste to be collected without<br />

diffi culty.<br />

As noted above, the rule of thumb is for 1/2 sq. m. per unit to be set<br />

aside for bulky waste. The dimensions for bins for e.g. food waste and<br />

paper are found on the Environmental Department’s website.<br />

The waste solutions in buildings and housing close to a recycling waste<br />

station can be dimensioned differently. It must, however, be possible to<br />

reinstate the full sorting of all waste.<br />

The environmental report and registration material must be submitted to<br />

the Environmental Department for approval.<br />

Documentation must be submitted to the Environmental Department<br />

that the layout of the building site and organization of waste management<br />

ensure the optimal handling and sorting of waste from construction<br />

and civil-works projects.