PROPOSED CONSTRUCTION AND OPERATION OF A WAVE ENERGY<br />

CONVERTER ADJACENT TO THE ABAGOLD FARMS, HERMANUS<br />

BASIC ASSESSMENT REPORT<br />

APPENDIX E: COMMENTS AND RESPONSES REPORT<br />

Prepared for:<br />

Department of <strong>Environmental</strong> Affairs<br />

On behalf of:<br />

Abagold<br />

Prepared by:<br />

<strong>Anchor</strong> <strong>Environmental</strong> Consultants (CC)


1 INTRODUCTION<br />

This public participation process is being conducted in accordance with the requirements provided in<br />

chapter 6 (regulation 54, 55, 56 <strong>and</strong> 57) of the EIA Regulations (G.N.R. 543 2010). Consultation<br />

between <strong>Anchor</strong> <strong>Environmental</strong> Consultants <strong>and</strong> authorities commenced in September 2011 with a<br />

meeting, <strong>and</strong> between <strong>Anchor</strong> <strong>Environmental</strong> Consultants <strong>and</strong> stakeholders in November 2011 with<br />

notices of the proposed project in two newspapers, written notices to neighbouring residents <strong>and</strong><br />

businesses <strong>and</strong> sign boards on site (see section C of BAR).<br />

2 FIRST PHASE<br />

2.1. CONSULTATION WITH AUTHORITIES<br />

A meeting was held between the competent authority, the EAP <strong>and</strong> Abagold on the 13 th of<br />

September 2011. The minutes of this meeting are provided below.<br />

Document<br />

Type:<br />

Title:<br />

Draft Minutes<br />

EIA for the Abagold Wave Energy Converter (NEAS Reference: DEAT/EIA/0000505/2011,<br />

DEA Reference: 12/12/20/2045)<br />

Reference: AWEC 13/09/2011/1<br />

Date: 13 September 2011<br />

Venue:<br />

Time:<br />

DEA Offices, 315 Pretorius Street, Cnr van der Waalt <strong>and</strong> Pretorious Streets, Fedsure<br />

Forum Building,4th Floor South Tower<br />

12h00-13h00<br />

ATTENDANCE:<br />

Department of<br />

<strong>Environmental</strong> Affairs<br />

Abagold<br />

<strong>Anchor</strong> <strong>Environmental</strong><br />

Coenrad Agenbach CA Pierre Hugo PH Barry Clark BC<br />

Takalani Maswime<br />

TM<br />

S<strong>and</strong>ile Vilakazi<br />

SV<br />

Nyiko Ngoveni<br />

NN<br />

No. Item Discussion<br />

1. Welcome <strong>and</strong><br />

Introductions<br />

TM welcomed all present to the meeting <strong>and</strong> explained that the meeting had been<br />

set up at the request of <strong>Anchor</strong> <strong>Environmental</strong> for the purposes of allowing <strong>Anchor</strong><br />

<strong>and</strong> Abagold to present information to DEA on the Abagold Wave Energy Converter<br />

(WEC) project <strong>and</strong> the application to apply Basic Assessment procedures to this


No. Item Discussion<br />

2. Description of<br />

the project<br />

<strong>and</strong> potential<br />

environmental<br />

impacts<br />

project rather than Scoping <strong>and</strong> <strong>Environmental</strong> Impact Reporting procedures.<br />

TM requested all present to introduce themselves <strong>and</strong> then h<strong>and</strong>ed the floor over to<br />

PH <strong>and</strong> BC to present their case.<br />

PH delivered two Powerpoint presentations the first on Abagold’s existing operations<br />

<strong>and</strong> the second on the proposed new Wave Energy Converter (WEC) project.<br />

Copies of these presentations delivered by PH are Annexed to these minutes. PH<br />

highlighted the fact that Abagold had been in business since 1985, first started<br />

exporting abalone in 1999, <strong>and</strong> currently had three operational abalone farms all in<br />

the precinct of the Hermanus Fishing Harbour, <strong>and</strong> a fourth farm under development.<br />

Abagold currently employs 320 staff <strong>and</strong> expects this to rise to 500 persons once the<br />

new farm is brought into production. He also highlighted the fact that energy costs<br />

were the greatest threats to the business at present, with electricity costs averaging<br />

R800 000 per month (R10 million per annum). PH explained that this was the<br />

primary motivation for investigating option for alternative energy <strong>and</strong> that the most<br />

promising of these was the generation of electricity from wave energy.<br />

In the second presentation on the proposed Abagold WEC, PH explained that<br />

Abagold would like to adopt a phased phased approach to the implementation of the<br />

project, starting with a pilot WEC able to generate approximately 750 kW <strong>and</strong> an<br />

effluent line turbine (a turbine fitted to the base of the existing seawater outfall)<br />

capable of generating a further 100 kW of electricity, <strong>and</strong> should this prove<br />

successful, that Abagold would like to go ahead with the construction of the main<br />

WEC capable of generating up to 3 MW of electricity. PH explained the mechanism<br />

through which electricity would be generated from the wave energy using the WECs<br />

(by allowing waves to push sea water into a reservoir constructed on the coast <strong>and</strong><br />

how this water would be used to turn a series of turbines as it flowed back into the<br />

sea). PH explained that the project development site was on the seashore (public<br />

property) within the precinct of the Hermanus Harbour, but that potential visual<br />

impacts from the project were likely to be small given that the project infrastructure<br />

was not visible beyond the borders of the site on the l<strong>and</strong>ward side, <strong>and</strong> that no<br />

infrastructure would project above the existing skyline.<br />

BC explained that <strong>Anchor</strong> <strong>Environmental</strong> had been appointed as environmental<br />

assessment practitioner for the project. He explained that he had studied the project<br />

documentation <strong>and</strong> had identified the likely significant impacts of the project to be as<br />

follows:<br />

o<br />

o<br />

o<br />

Construction phase: (i) permanent but localised loss of a small amount<br />

of intertidal <strong>and</strong> shallow water coastal habitat within the footprint of<br />

the development site<br />

Operational phase: (i) permanent low intensity visual impacts<br />

Other potential impacts of the project such as impacts on water<br />

quality, noise pollution, waste generation were all of extremely low or<br />

negligible significance.<br />

BC explained also that he anticipated that two specialist studies would be required<br />

as part of the impact assessment, the first being a marine ecology impact study <strong>and</strong><br />

the second being a visual impact assessment.<br />

BC explained that the project activities triggered listed activities included in both<br />

Listing notice 1 (R544) <strong>and</strong> Listing notice 2 (R545) <strong>and</strong> hence required that the<br />

applicant follow procedures for Scoping <strong>and</strong> <strong>Environmental</strong> Impact Reporting rather<br />

than a Basic Assessment process. However, BC mentioned that in his opinion the<br />

potential impacts of the project on the environment (including all other beneficial<br />

uses of the sea in this area), both in respect of the construction <strong>and</strong> operational<br />

phases, are likely to be easy to identify <strong>and</strong> quantify, are almost certainly of low


No. Item Discussion<br />

3 General<br />

discussion<br />

<strong>and</strong> questions<br />

regarding the<br />

project<br />

significance, <strong>and</strong> will be easy to communicate to <strong>and</strong> will be easily understood by<br />

interested <strong>and</strong> affected parties. As such, he felt that DEA, as competent authority<br />

assessing the application, should be able to reach a decision on the basis of<br />

information provided in a Basic Assessment <strong>report</strong> only without requiring a full<br />

scoping <strong>and</strong> <strong>Environmental</strong> Impact Reporting. In the light of this, he explained that<br />

he had advised Abagold to request permission to apply Basic Assessment<br />

procedures instead of S&EIR procedures to this project. Hence the request for this<br />

meeting between DEA, Abagold <strong>and</strong> <strong>Anchor</strong>.<br />

CA thanked PH <strong>and</strong> BC for their presentation. He then queried if the was likely to<br />

be any changes in the temperature of the water after it entered the reservoirs <strong>and</strong><br />

before it was discharged back to the sea.<br />

PH explained that the residence time in the reservoirs would be too short to<br />

influence the temperature in anyway <strong>and</strong> that the speed at which it would flow over<br />

the turbines was too low owing to the large size of the turbines to have any<br />

measurable effect on the temperature.<br />

CA queried whether a permit was required from NERSA for the generation of<br />

electricity<br />

BC explained that Abagold were investigating this but suspected that no permit was<br />

required as Schedule 2 of the Electricity Regulation Act (2006) indicates that one is<br />

exempt from obtaining such a permit provided that the electricity generated was for<br />

own use only, which was the case in this instance.<br />

BC also explained that Abagold would need to secure permission from Minister:<br />

DEA to lease l<strong>and</strong> below the high water mark of the sea for the proposed<br />

development <strong>and</strong> that a Coastal discharge permit would be required for the project<br />

but that no activities under the Waste Management Act or Air Pollution Act would be<br />

triggered by the proposed development.<br />

CA asked if any impacts to whales could be expected.<br />

BC mentioned that potential impacts on southern right whale populations that<br />

aggregate offshore of the site in winter (April to October of each year) were of<br />

concern but he did not think that they would be affected in any way by the project<br />

activities. Noise <strong>and</strong> water quality impacts are expected to be negligible <strong>and</strong> the<br />

development is not expected to encroach into the area used by the whale.<br />

Nonetheless it would be recommended that all construction activities be undertaken<br />

outside on this period.<br />

SV explained that BC would need to submit a formal application to the Department<br />

requesting to downgrade from S&EIR to Basic Assessment. She mentioned that BC<br />

would need to respond to the list of criteria that had been sent to him by TM to assist<br />

the Department to arrive at a decision on this matter.<br />

SV also explained that if permission was granted to downgrade to a Basic<br />

Assessment process that BC should not feel bound to following the Basic<br />

Assessment <strong>report</strong> format exactly but rather that he should present information on<br />

the nature of the project <strong>and</strong> the assessment of impacts in the most logical <strong>and</strong> easy<br />

to follow manner. She noted that a detailed description on the nature of the project<br />

should be provided with the Basic Assessment rpeort.<br />

CA suggested that it would be good to have a second project meeting on site after<br />

the EIA <strong>report</strong> has been submitted to the Department <strong>and</strong> that other relevant<br />

government agencies including DEADP, DEA : Oceans & Coasts <strong>and</strong> the<br />

local/district municipalities should be invited to attend the meeting.<br />

TM noted that owing to the fact that technology to be deployed in the project was<br />

new <strong>and</strong> would be unfamiliar to stakeholders, that a detailed assessment of the


No. Item Discussion<br />

potential impacts would be required <strong>and</strong> that in depth consultation with stakeholders<br />

would need to be undertaken. Key stakeholders to be consulted should include<br />

agencies such as the Wildlife <strong>and</strong> Environment Society of South Africa (WESSA),<br />

Conservation International, <strong>and</strong> Birdlife International.<br />

5 Closure The meeting closed at 13h00. CA thanked PH <strong>and</strong> BC for requesting the meeting<br />

<strong>and</strong> for the inputs.<br />

2.2. REGISTRATION OF INTERESTED AND AFFECTED PARTIES<br />

Authorities<br />

Department of <strong>Environmental</strong> Affairs <strong>and</strong> Development<br />

Planning<br />

Cape Nature<br />

Department of <strong>Environmental</strong> Affairs, Branch: Oceans & Coasts<br />

Overstr<strong>and</strong> Municipality<br />

Overberg District Municipality<br />

NGOs<br />

Overstr<strong>and</strong> Conservation Foundation<br />

Birdlife Africa<br />

Wildlife <strong>and</strong> Environment Society of South Africa<br />

Overberg Integrated Conservation Group (OICG )<br />

Dolphin action <strong>and</strong> protection group<br />

Neighbouring l<strong>and</strong>owners/tenants<br />

Beach Club<br />

Whale Bay Cascades<br />

Whale Rock Estate<br />

Aquafarm<br />

HIK Abalone<br />

Harbour Master<br />

Harbour Rock Restaurant<br />

Tuna Marine<br />

SPP Canning / Marifeed<br />

Lusitania<br />

Combined Abalone Processors<br />

Walker Bay Canners<br />

Hermanus Processing Services<br />

Hermanus Boat Club<br />

NSRI<br />

Quayside Cabin<br />

Hermanus Whale Cruises<br />

Southern Right Carters<br />

Solar Spectrum Whale Cruises<br />

Contact person<br />

Maboee Nthejane<br />

L<strong>and</strong>use Advice Department /<br />

Alana<br />

Chumani Mangcu<br />

Liezel Bezuidenhout<br />

Francois Kotze<br />

Rob Fryer/Megan Campbell<br />

Pam Barrett<br />

Chris Galliers<br />

Francois Kotze<br />

Nan Rice<br />

Danie Van Deventer<br />

Willem van Zyl<br />

Louise<br />

Jacques du Plessis<br />

Gavin Johnson<br />

Willie Hill<br />

Francois Barnard<br />

Mark Raynard<br />

Kurt Matschke<br />

Charline October<br />

Abigail Kleinsmidt<br />

Francois du Toit<br />

Manie Martz<br />

Tjaart Oliver<br />

Henk Henn<br />

Mike<br />

Tommy Gelderblom<br />

Shaun/Gale<br />

Nina


Scuba Africa<br />

BS Divers<br />

Gecko Bar<br />

Other<br />

Berg 'n See<br />

Kleinmond Nature Conservation Society<br />

Berg 'n See<br />

Lubritech Marketing<br />

BS Divers<br />

Abagold<br />

Berg 'n See<br />

Whale Rock Estate Body Corperate<br />

Irvin & Johnson Ltd, Abalone Culture Division<br />

Whale Rock Estate<br />

Manager | Irvin & Johnson Ltd | Walker Bay Canners<br />

Infoprop<br />

Private<br />

Berg 'n See<br />

Private<br />

HRA<br />

HIK Abalone Farm<br />

Private<br />

Berg 'n See<br />

Hermanus Ratepayers<br />

Aquafarm<br />

Abagold<br />

Accountant | Irvin & Johnson Ltd | Walker Bay Canners<br />

TWR Training<br />

Whale coast media<br />

Berg 'n See<br />

Private<br />

Relmar Holdings<br />

HIK Abalone Farm<br />

Mammal Research Institute<br />

PHS Consulting<br />

ANC<br />

Carnival pools<br />

Kleinmond Nature Conservation Society<br />

Whale Rock Estate<br />

Overstr<strong>and</strong> Conservation Foundation<br />

Relmar Holdings<br />

Hermanus Ratepayers<br />

Overstr<strong>and</strong> Municipality<br />

Scientist: L<strong>and</strong> Use Advice| Scientific Services | Cape Nature<br />

ANC<br />

Irvin & Johnson Ltd, Abalone Culture Division<br />

Private<br />

Aron<br />

Boet Scheun / Venda<br />

Vorn<br />

Andre Visage<br />

Annette Mason<br />

Barnad Inez<br />

Bill Cummingham<br />

Boet Scheun<br />

Christiaan De Wett<br />

Christian Schumann<br />

Desmond Baard<br />

Dirkie Kotzé<br />

Dr Collie<br />

Francois du Toit<br />

Fredrich Venter<br />

G. Bulterman<br />

Gangale Rila<br />

Graham Palmer<br />

Grant McLachlann<br />

Greg Tutt<br />

Hennie Beekman<br />

Ian Banna<br />

Janine Blignaut<br />

Jaques Du Plessis<br />

Johan Hy<br />

Johan van der Berg<br />

John Ann<strong>and</strong>ale<br />

John Mathew<br />

Luelle Hugo<br />

Lynotn Wepener<br />

M.A. Raynard<br />

Matt Naylor<br />

Meredith Thornton<br />

Michelle Kruger<br />

N.R. Koff<br />

P. M. Schoeman<br />

Peter Muller<br />

R. Polleti<br />

Rob Fryer<br />

Rob Moffat<br />

Rodney Anderson<br />

S. Muller<br />

Samantha Ralston<br />

Simo Nodom<br />

Steyn Miller<br />

Tessa Spiro


2.3. DISTRIBUTION OF A BACKGROUND INFORMATION DOCUMENT<br />

A background information document was compiled <strong>and</strong> sent to all registered interested <strong>and</strong> affected<br />

parties, on the 29 th of November 2011 <strong>and</strong> to all parties registering thereafter.


2.4. PUBLIC MEETING<br />

A public meeting was held on the 25th of January 2012. The intention of the meeting was to provide<br />

interested <strong>and</strong> affected parties with background information <strong>and</strong> project details <strong>and</strong> provide<br />

opportunity for parties to ask questions <strong>and</strong> comment. The minutes of the meeting are provided<br />

below.<br />

EIA Public Participation Process<br />

Slot-Slope Wave Energy Converter<br />

MINUTES<br />

First public meeting<br />

The Auditorium at the Overstr<strong>and</strong> Municipality, Hermanus, 25 January 2012<br />

ANCHOR<br />

e n v i r o n m e n t a l<br />

ATTENDANCE<br />

Name<br />

Organisation<br />

Lynotn Wepener<br />

Private<br />

P. M. Schoeman Carnival pools<br />

Hennie Beekman<br />

Private<br />

G. Bulterman Private<br />

John Mathew<br />

Whale coast media<br />

Fredrich Venter<br />

Infoprop<br />

Boet Scheun<br />

BS Divers<br />

Jaques Du Plessis<br />

Aquafarm<br />

Graham Palmer<br />

Private<br />

Peter Muller<br />

Klmd Nat Cons Soc<br />

Tessa Spiro<br />

Private<br />

Bill Cummingham<br />

Lubritech Marketing<br />

Barnad Inez<br />

Berg 'n See<br />

Gangale Rila<br />

Berg 'n See<br />

Andre Visage<br />

Berg 'n See<br />

Christian Schumann<br />

Berg 'n See<br />

Luelle Hugo<br />

Berg 'n See<br />

R. Polleti Whale Rock Estate<br />

Dr Collie<br />

Whale Rock Estate<br />

M.A. Raynard<br />

Relmar Holdings<br />

S. Muller Overstr<strong>and</strong> Municipality<br />

Matt Naylor<br />

HIK Abalone Farm<br />

Greg Tutt<br />

HIK Abalone Farm


Christiaan De Wett<br />

Grant McLachlann<br />

Ian Banna<br />

Johan Hy<br />

Rob Moffat<br />

Rodney Anderson<br />

Michelle Kruger<br />

Simo Nodom<br />

N.R. Koff<br />

Abagold<br />

HRA<br />

Berg 'n See<br />

Abagold<br />

Relmar Holdings<br />

Hermanus Rate Payers<br />

PHS consulting<br />

ANC<br />

ANC<br />

WELCOME AND INTRODUCTION<br />

Dr. Barry Clark (BC) of <strong>Anchor</strong> <strong>Environmental</strong> Consultants welcomed the interested <strong>and</strong> affected<br />

parties <strong>and</strong> introduced himself <strong>and</strong> Karen Tunley from <strong>Anchor</strong> <strong>Environmental</strong> Consultants <strong>and</strong><br />

Christo du Plessis (CdP) <strong>and</strong> Dr. Pierre Hugo (PH) from Abagold. BC explained that <strong>Anchor</strong><br />

<strong>Environmental</strong> Consultants had been appointed as the environmental assessment practitioner (EAP)<br />

for the project. BC then gave a presentation which is attached as Annexure 1 to this document.<br />

BC explained that the term <strong>Environmental</strong> Impact Assessment (EIA) refers to the process of<br />

identifying, predicting, evaluating <strong>and</strong> mitigating the biophysical, social, <strong>and</strong> other relevant effects of<br />

development proposals prior to major decisions being taken <strong>and</strong> commitments made. BC indicated<br />

that the objectives of an EIA were to (1) help the authorities to decide if the impacts of a potential<br />

development are acceptable or have to be mitigated in some way, (2) inform the design of<br />

appropriate monitoring, mitigation, <strong>and</strong> management measures, <strong>and</strong> (3) identify <strong>and</strong> assess<br />

potential alternatives.<br />

BC explained that an <strong>Environmental</strong> Authorization is required to commence a listed activity in terms<br />

of section 24 of NEMA <strong>and</strong> that an EIA must be submitted as part of the application. BC explained<br />

the difference between Basic Assessment (BA) <strong>and</strong> Scoping <strong>and</strong> EIA (S&EIA) whereby BA is applied to<br />

smaller scale activities contained in Listing Notice 1 <strong>and</strong> 3, the impacts of which are generally known<br />

<strong>and</strong> can be easily managed. Typically, these activities are considered less likely to have significant<br />

environmental impacts <strong>and</strong>, therefore, do not require a full EIA. S & EIA requires a thorough<br />

environmental assessment for activities contained in Listing Notice 2, which are those activities that<br />

(due to their nature <strong>and</strong>/or extent) are likely to have significant impacts that cannot easily be<br />

predicted. They are higher risk activities that are associated with potentially higher levels of<br />

pollution, waste <strong>and</strong> environmental degradation. BC indicated that the project activities triggered<br />

listed activities on both Listing notice 1 (R544) <strong>and</strong> Listing notice 2 (R545) <strong>and</strong> hence required that<br />

the applicant follow procedures for Scoping <strong>and</strong> <strong>Environmental</strong> Impact Reporting rather than a Basic<br />

Assessment process. However, BC explained that due to the fact that the potential impacts of the<br />

project on the environment (including all other beneficial uses of the sea in this area), both in<br />

respect of the construction <strong>and</strong> operational phases, are likely to be easy to identify <strong>and</strong> quantify, are<br />

likely to be low significance, <strong>and</strong> will be easy to communicate to <strong>and</strong> will be easily understood by<br />

interested <strong>and</strong> affected parties, the competent authority (Department of <strong>Environmental</strong> Affairs) had<br />

given permission to apply BA procedures instead of S&EIR procedures to this project.<br />

BC explained the steps taken in the BA process starting with the appoint of an EAP (<strong>Anchor</strong><br />

<strong>Environmental</strong> Consultants), the application to the competent authority to commence an EIA (the<br />

was submitted in September 2011 <strong>and</strong> permission to conduct a BA instead of an S & EIA was grant in<br />

November 2011) <strong>and</strong> the basic assessment <strong>and</strong> public participation process which was indicated as


the point in the process at which the project was. BC indicated the public participation process had<br />

thus far entailed (1) notices being published in local <strong>and</strong> provincial newspapers (Cape Times,<br />

Hermanus Times), (2) signboards being posted at the site, (3) written notification being sent to<br />

organs of state, (4) an I&AP list being opened <strong>and</strong> maintained <strong>and</strong> (5) a BID being sent out to<br />

stakeholders on 28 Nov 2011. BC indicated that this public meeting was part of the public<br />

participation process <strong>and</strong> that all I&APs would have further chance to comment on the draft BA<br />

<strong>report</strong> which was to be distributed in late February 2012.<br />

BC indicated the likely impacts of the project to be as follows:<br />

Impacts to the marine ecology<br />

o Construction phase – Habitat loss (rocky intertidal <strong>and</strong> kelp forest) <strong>and</strong> disturbance<br />

to adjacent marine environment (water quality <strong>and</strong> noise)<br />

o Operational phase – Noise <strong>and</strong> Impacts of the turbines on fish<br />

<br />

<br />

Visual impacts – Impacts on visual, scenic, aesthetic <strong>and</strong> amenity values (including “sense of<br />

place”) during the construction <strong>and</strong> operational phase<br />

Socio-economic impacts – increases employment opportunities within Abagold <strong>and</strong><br />

increases revenue generation<br />

BC explained that two specialist studies had been conducted as part of the impact assessment, the<br />

first being a marine ecology impact study <strong>and</strong> the second being a visual impact assessment.<br />

Question 1: How long will the <strong>Environmental</strong> Impact Assessment take<br />

BC: This may typically take 6 months<br />

Question 2: If there are any changes or extensions will there be another EIA<br />

BC: Yes anything beyond the scope of this application will need an environmental authorisation.<br />

Mr Christo du Plessis from Abagold delivered two Powerpoint presentations the first on Abagold’s<br />

existing operations <strong>and</strong> the second on the proposed new Wave Energy Converter (WEC) project.<br />

Both are attached in Annexure 2 of this document.<br />

CdP indicated that Abagold had been in business since 1985, first started exporting abalone in 1999,<br />

<strong>and</strong> currently had three operational abalone farms all in the precinct of the Hermanus Fishing<br />

Harbour, <strong>and</strong> a fourth farm under development. It was highlighted that Abagold currently employed<br />

320 staff <strong>and</strong> expected this to rise to 500 persons once the new Sulamanzi farm was brought into<br />

production. He also highlighted the fact that energy costs were the greatest threats to the business<br />

at present, with electricity costs averaging R800 000 per month (R10 million per annum). CdP<br />

explained that this was the primary motivation for investigating option for alternative energy <strong>and</strong><br />

that the most promising of these was the generation of electricity from wave energy.<br />

In the second presentation on the proposed Abagold WEC, CdP explained that Abagold would like to<br />

adopt a phased approach to the implementation of the project, starting with a pilot WEC able to<br />

generate approximately 750 kW <strong>and</strong> an effluent line turbine (a turbine fitted to the base of the<br />

existing seawater outfall) capable of generating a further 100 kW of electricity, <strong>and</strong> should this prove<br />

successful, that Abagold would like to go ahead with the construction of the main WEC capable of<br />

generating up to 3 MW of electricity. CdP explained the mechanism through which electricity would<br />

be generated from the wave energy using the WECs (by allowing waves to push sea water into a


eservoir constructed on the coast <strong>and</strong> how this water would be used to turn a series of turbines as<br />

it flowed back into the sea). CdP explained that the project development site was on the seashore<br />

(public property) within the precinct of the Hermanus Harbour, but that potential visual impacts<br />

from the project were likely to be small given that the project infrastructure was not visible beyond<br />

the borders of the site on the l<strong>and</strong>ward side, <strong>and</strong> that no infrastructure would project above the<br />

existing skyline.<br />

Question 3: What is the length of each of the sloped walls<br />

CdP: The main WEC is approximately 180 m long, the pilot 40 m <strong>and</strong> the pump station assistance<br />

pond 32 m.<br />

Question 4: Will the turbines be developed locally or internationally<br />

PH: Locally. We have appointed mechanical <strong>and</strong> electrical engineers to work on this project. We<br />

want to do as much locally, preferably in Hermanus, as possible. If maintenance is needed in future<br />

we do want to have to fly out an international mechanic. There are eight different investigations<br />

ongoing. The turbine is being worked on here to make sure we have the manufacturing capability<br />

here. There is also a Stellenbosch student working on wave tanks.<br />

Question 5: If a reverse osmosis plant is to be developed could the slot slope tanks be used to supply<br />

seawater to the municipality<br />

PH: It is potentially an option.<br />

CdP: There is no copyright on the process or the technology anyone can pick this up <strong>and</strong> put it in<br />

place elsewhere. Students can use this as a working model for projects.<br />

Question 6: Abagold should be commended for the “keeping it local” approach. This is an extremely<br />

exciting project. However how will global warming <strong>and</strong> sea level rise impact upon this.<br />

PH: The design is modular <strong>and</strong> we could always add another layer to the top of the wall if it is<br />

needed.<br />

Question 7: Will the public be able to view the slot-slope WEC<br />

PH: This project should be recognised as a potential draw card for technical tourism too. It will be<br />

kept open for viewing.<br />

Question 8: Have you considered the potential impacts of the heat generated by the turbines<br />

BC: Similar very low head turbines have been used in rivers in Europe <strong>and</strong> no detectable heat<br />

difference in the water has been recorded.<br />

PH: These turbine operate at about 30b rpm, the heat produced at this speed should not be<br />

detectable.<br />

Question 6: How many permanent employees will be appointed to deal directly with the electricity<br />

generation<br />

PH: At least six.<br />

Question 7: Places like Koeberg have had issues with marine biofouling. How are you going to deal<br />

with this in the WEC<br />

PH: Ongoing maintenance will be required. For example it is likely that rafts of kelp may accumulate<br />

in the sump <strong>and</strong> need to be removed. There will be a road on top of the wall making this kind of<br />

maintenance feasible. In terms of biofouling, divers can go <strong>and</strong> physically scrape the walls <strong>and</strong> slots.


Accessibility has been brought into the planning <strong>and</strong> design of the WEC.<br />

Question 8: Will Abagold be completely independent of Eskom<br />

PH: If this runs at full capacity, yes. However Eskom will have to be used for backup.<br />

CdP: The use of this facility will free up electricity for other uses. This technology is a great scheme<br />

<strong>and</strong> sets a good example for the rest of the country. It is essentially a seed for other renewable<br />

projects.<br />

BC then indicated that the basic assessment <strong>report</strong> would be made available to interested <strong>and</strong><br />

affected parties for a 40 day comment period prior to being submitted to the Department of<br />

<strong>Environmental</strong> Affairs. He also indicated that appeals could be made to DEA if interested <strong>and</strong><br />

affected parties were not satisfied with the decision taken by the department. He then closed the<br />

meeting <strong>and</strong> indicated that there would be another 20 min available for informal discussion. A<br />

model of the development <strong>and</strong> a series of posters were displayed. The posters are provided in<br />

Annexure 3 of this document.<br />

2.5. COMMENTS FROM INTERESTED AND AFFECTED PARTIES AND RESPONSES<br />

from: Mark Anthony Raynard<br />

to:<br />

Karen Tunley <br />

cc:<br />

Barry Clark <br />

date: 6 March 2012 22:20<br />

subject: Re: Slot-slope Wave Energy Converter: first public meeting draft minutes<br />

Dear Karen <strong>and</strong> Barry<br />

Thanx for the mail <strong>and</strong> i hope u both are well <strong>and</strong> good.During the meeting<br />

I did not have any/no questions <strong>and</strong> went through the project <strong>and</strong> realised<br />

that it would in fact have an affect on our development <strong>and</strong> what we intent<br />

doing on our sites in Hermanus Harbour.<br />

The intended structure is envisaged to be right in front of our<br />

development <strong>and</strong> it would have a negative affect on our site in terms of<br />

our views <strong>and</strong> our economic sales model.<br />

The structure is cast with cement <strong>and</strong> it would have a<br />

devastating/destructive effect on the echology <strong>and</strong> what we are busy with<br />

at the sites <strong>and</strong> would in fact impact negatively on our business as a<br />

whole.<br />

The structure would in fact elevate the dangers of huge masses of water<br />

running in at a speed <strong>and</strong> put our whole development at risk by creating a<br />

springboard effect of such masses of water.<br />

The structure would in fact assist with the running sea water to be<br />

elevated onto our site <strong>and</strong> would cause destruction to our business <strong>and</strong><br />

development.<br />

The proposed technology as well as the impact that it will have on the<br />

environment is unclear as well as unimaginable to us.It is proposed that<br />

the applicant present us with a detailed as well as practical examples of<br />

where this technology is/was applied ,under similar environmental<br />

conditions.<br />

It is also proposed that some specialist engineers be called to underwrite<br />

this experiment. Despite this, we believe that the risk of such an<br />

innovative experiment is too high, if we consider the delicate nature of


the area in terms of the number of abalone farms that s dependent on the<br />

pumping of daily fresh sea water,to keep their(high value) farms in<br />

operation.With a robust coast like ours,it is advisable that a more<br />

secluded spot or area be identified to do these types of experiments.<br />

Dispite the fact that we would not like to st<strong>and</strong> in the way of modern <strong>and</strong><br />

strategic technology being applied, this proposed wall in front of our<br />

development will defnitely have a negative effect on our premises'view <strong>and</strong><br />

it is likely to increase the risk <strong>and</strong> endanger our lives in case of a<br />

storm.<br />

This extend to which this will be bearable could only be estimated based<br />

on more practical simulations or practical examples of what it will look<br />

like.<br />

Please confirm that all my/our concerns are indeed noted <strong>and</strong> that it will<br />

form part of the document <strong>and</strong> application.<br />

Thanking u <strong>and</strong> trusting to hear from u.<br />

Kind regards<br />

Mark Anthony Raynard<br />

Tuna Marine (Pty) Ltd<br />

Relmar Kelp Industries (Pty) Ltd<br />

Relmar Holdings (Pty) Ltd<br />

2 Argon Road, Hermanus Business Park, Hermanus, 7200<br />

P.O.Box 527, Hermanus, 7200<br />

satelite fone:<br />

mobile: +27 73 664 8864<br />

email: markanthonyraynard@yahoo.com<br />

office: 071 697 8930<br />

fax : 086 546 3737<br />

Skype: markray5851<br />

ConferenceCall : +27 87825 0190, Code : 207508 #<br />

Website: www.relmarholdings.com<br />

NB***..............................________________________________________.........<br />

..............<br />

In the event ofthis e-mail having been directed externally for Relmar Holdings' business purposes,this<br />

e-mail, including attachments, is confidential, may be privileged <strong>and</strong> is intended solely for the use of<br />

the named recipients(s). If you are not the intended recipient, do not disclose, distribute, or retain it,<br />

<strong>and</strong> please notify the sender immediately <strong>and</strong>/or delete the e-mail. Any views expressed in this data<br />

message are those of the individual sender, except where the sender specifically states them to be<br />

those of Relmar Holdings(Pty)Ltd, to whom no liability shall attach whatsoever.<br />

from: Karen Tunley karen@anchorenvironmental.co.za<br />

to:<br />

Mark Anthony Raynard<br />

cc:<br />

barry@anchorenvironmental.co.za<br />

date: 22 March 2012 16:06<br />

Dear Mark,<br />

Thank you for raising your concerns. I have addressed these below.<br />

1. The intended structure is envisaged to be right in front of our development <strong>and</strong> it would<br />

have a negative affect on our site in terms of our views <strong>and</strong> our economic sales model.


The proposed site is situated within a harbour / light industrial area. The rocky shore area is in a<br />

disturbed state <strong>and</strong> the adjacent coastal areas are developed <strong>and</strong> used for industrial purposes. The<br />

proposed development is not out of character with the surrounding l<strong>and</strong> uses <strong>and</strong> should not detract<br />

from the overall aesthetics of the area.<br />

2. The structure is cast with cement <strong>and</strong> it would have a devastating/destructive effect on the<br />

echology <strong>and</strong> what we are busy with at the sites <strong>and</strong> would in fact impact negatively on our<br />

business as a whole.<br />

The design <strong>and</strong> construction specifications indicate that only precast concrete structures will be used<br />

in the marine environment <strong>and</strong> hence there are no significant concerns in terms of water quality as a<br />

result of the proposed development.<br />

The construction of all three alternatives will result in severe disturbance of the rocky intertidal <strong>and</strong><br />

infratidal surfaces <strong>and</strong> associated macrofauna <strong>and</strong> flora will probably experience high levels of<br />

mortality. The intertidal rocky habitat at the proposed site is not particularly important in terms of<br />

biodiversity conservation for rocky intertidal biota. A low species diversity <strong>and</strong> abundance of fauna<br />

<strong>and</strong> flora is supported at this site compared to nearby sites. Furthermore all species, with the<br />

exception of the fine filamentous alga Centroceras clavulatum, found at this site were found at<br />

nearby sites. C. clavulatum occurs along the entire coast of South Africa <strong>and</strong> in Namibia. It is not an<br />

endangered or endemic species. The rocky shore does provide a food source <strong>and</strong> habitat to the<br />

African black oystercatcher. The loss of intertidal habitat will probably lead to a reduction of<br />

oystercatchers along this particular stretch of coast. However, the average density of oystercatchers<br />

recorded at this site previously was very low relative to other areas along the south Western Cape<br />

coast. The significance of the impact is expected to be low for all proposed alternatives.<br />

The development of solid structures <strong>and</strong> the alteration to the shape of the coastline may result in<br />

alterations to the nearshore wave regime. Mr Geoff Toms, a Senior Lecturer at the University of<br />

Stellenbosch, incumbent in The TNPA Chair of Port <strong>and</strong> Coastal Engineering, provided a letter of<br />

advice to AEC concerning the impact that the sloped walls <strong>and</strong> side walls of the dams may have on<br />

near-shore wave energy, currents <strong>and</strong> coastal erosion. The assessment of the impact is based on this<br />

advice.<br />

The dominant swell direction for this section of the coast is from the SW. As the wave fronts cross<br />

into shallower water within the bay the wave fronts bend <strong>and</strong> the wave crests turn from SW to<br />

approach locally from the S or even SSE. Shorter waves may cross the swells under some local wind<br />

conditions (e.g. SE winds). The combined effect of this wave approach is a turbulent local sea<br />

condition with reflections off the present shoreline rocks. The local angle of approach of<br />

predominant swells relative to the rocks is almost head-on (wave crests parallel to shore) at the<br />

proposed site. In the local area of the site there are no boat moorings <strong>and</strong> no beaches or structures<br />

<strong>and</strong> no access to the area for the general public. There are seawater intake <strong>and</strong> discharge structures<br />

for Abagold <strong>and</strong> two other abalone farms positioned on rocks, <strong>and</strong> the breakwater of the New<br />

Harbour is positioned similarly in an exposed area just north-east of the site.<br />

The currents in the area are very weak <strong>and</strong> mostly wind or wave driven. The local currents at the site<br />

will not be significantly affected by the implementation of any of the three alternatives <strong>and</strong> no<br />

undermining of structures or dangerous currents for bathers or navigation will occur.<br />

In the present situation (without the WEC), wave energy is taken from the incoming waves due to<br />

turbulent breaking on the rocks <strong>and</strong> some residual energy is reflected back to sea as waves radiated<br />

from the rocks. The sloping walls of the WEC will provide some extraction of wave energy with less<br />

turbulence <strong>and</strong> some reflection of residual wave energy will still occur in the form of seaward


adiated waves. The relative amounts of reflection or absorption with or without the WEC could not<br />

easily be determined. Typically on a rocky shoreline it is expected that 20-40% of the wave energy is<br />

reflected, while on a smooth slope this figure can increase to 40-60% depending mainly on the slope<br />

<strong>and</strong> the wave characteristics. It is expected that a reduced reflection would occur on a smooth<br />

porous slope with some energy extraction, not by turbulence, but by a WEC device. The resulting<br />

reflections may not be significantly greater than those of the present rocky shore. However, the<br />

wave reflection pattern from the WEC is likely to be more regular than that of the rocky shore<br />

because the wave crest impact lines with the device will be straighter than those of an irregular<br />

rocky shore. Due to oblique walls (in Alternatives (1) <strong>and</strong> (2)) there will be crossing lines of reflection<br />

which can accentuate the turbulence of the local area somewhat.<br />

Since the seabed is predominantly rocky it is not expected that erosion of the seabed will occur but<br />

there may be a slight redistribution of the s<strong>and</strong> pockets among the rock gulleys. Erosion of structures<br />

or coasts is not expected. The vessels entering the existing port or maneuvering towards it will not<br />

face<br />

3. The structure would in fact elevate the dangers of huge masses of water running in at a<br />

speed <strong>and</strong> put our whole development at risk by creating a springboard effect of such masses<br />

of water. The structure would in fact assist with the running sea water to be elevated onto our<br />

site <strong>and</strong> would cause destruction to our business <strong>and</strong> development.<br />

The harbour wall dolosse reach 6m above MSL <strong>and</strong> have a foot of 30m. Waves have breached this<br />

wall a few times over the last twenty years, even though the harbour wall is set at an angle to the<br />

prevailing waves. Relmar faces the waves directly <strong>and</strong> therefore, irrespective of whether the WEC is<br />

built, serious measures to prevent storm damage will have to be taken by Relmar. Abagold have<br />

proposed incorporating these in the planning of the WEC.<br />

4. The proposed technology as well as the impact that it will have on the environment is<br />

unclear as well as unimaginable to us.It is proposed that the applicant present us with a<br />

detailed as well as practical examples of where this technology is/was applied ,under similar<br />

environmental conditions.<br />

The impacts of the proposed technology are not unclear. A marine specialist <strong>report</strong> provides detail<br />

of the potential impacts of the development. Summary tables of the potential impacts <strong>and</strong><br />

significance thereof are provided below.<br />

TABLE 1. SUMMARY OF THE POTENT IAL IMPACTS TO THE MARINE ENVIRONMENT AND THE SIGNIFICANCE THEREOF LIKELY TO<br />

OCCUR DURING THE CONSTRUCTION OF THE PROPOSED WECS.<br />

Potential Impact<br />

Direct losses of intertidal <strong>and</strong> infratidal biota in<br />

development footprint<br />

Barotrauma of marine fauna as a result of blasting<br />

(With mitigation)<br />

Noise disturbance to marine fauna<br />

(With mitigation)<br />

Impaired water quality<br />

(With mitigation)<br />

Alternative<br />

1<br />

Alternative<br />

2<br />

Alternative<br />

3<br />

Low Low Low<br />

Low Low Low<br />

Medium Medium Medium<br />

Low Low Low<br />

Pollution/litter during construction Low Low Low


(With mitigation)<br />

TABLE 2. SUMMARY OF THE POTENT IAL IMPACTS TO THE MARINE ENVIRONMENT AND THE SIGNIFICANCE THEREOF LIKELY TO<br />

OCCUR DURING THE OPERATION OF THE PROPOSED WECS.<br />

Potential Impact<br />

Alternative<br />

1<br />

Alternative<br />

2<br />

Alternative<br />

3<br />

Heat <strong>and</strong> noise generation by turbine operation Very Low Very Low Very Low<br />

Fish mortality in turbines Very Low Very Low Very Low<br />

Permanent changes in nearshore wave regime patterns Very Low Very Low Very Low<br />

5. It is also proposed that some specialist engineers be called to underwrite this experiment.<br />

Despite this, we believe that the risk of such an innovative experiment is too high, if we<br />

consider the delicate nature of the area in terms of the number of abalone farms that s<br />

dependent on the pumping of daily fresh sea water ,to keep their(high value) farms in<br />

operation. With a robust coast like ours ,it is advisable that a more secluded spot or area be<br />

identified to do these types of experiments.<br />

This site has been chosen for its suitable characteristics. Not least of these is the fact that it is<br />

adjacent to the harbour with its light industrial zoning.<br />

The preferred phased approach is a precautionary one <strong>and</strong> the pilot plant in front of Abagold’s own<br />

farm will demonstrate the efficacy of the technology prior to the full scale project being<br />

implemented.<br />

6. Dispite the fact that we would not like to st<strong>and</strong> in the way of modern <strong>and</strong> strategic<br />

technology being applied, this proposed wall in front of our development will defnitely have a<br />

negative effect on our premises'view <strong>and</strong> it is likely to increase the risk <strong>and</strong> endanger our lives<br />

in case of a storm.<br />

Already discussed<br />

7. This extend to which this will be bearable could only be estimated based on more<br />

practical simulations or practical examples of what it will look like.<br />

Several detailed posters were displayed <strong>and</strong> explained at the meeting<br />

A three dimensional scale model has been available at public meetings <strong>and</strong> openly<br />

discussed <strong>and</strong> is constantly displayed at Abagold’s reception.<br />

Photos from the sea have been superimposed with designed structures <strong>and</strong> presented<br />

A professional visual impact assessment has been done <strong>and</strong> the <strong>report</strong> is available<br />

Please contact me if you have any further concerns or feel that yours have not been adequately<br />

addressed.<br />

Kind regards,<br />

Karen Tunley |senior consultant<br />

<strong>Anchor</strong> <strong>Environmental</strong> Consultants<br />

8 Steenberg House<br />

Silverwood Close<br />

Tokai


7945<br />

South Africa<br />

www.anchorenvironmental.co.za<br />

Tel: +27 21 701 3420<br />

Fax: +27 21 701 5280<br />

Peter M. Schoeman – Generally interested. Very exciting project.<br />

Graham Palmer – My interest is in the Economic development of Hermanus <strong>and</strong> in the general<br />

development of renewable energy sources. I am supportive of the initiative. I have concerns over the<br />

pollution of the coastline during construction, ie. The pouring of concrete etc in the surf zone.<br />

Mrs Annette Mason (Chairperson / Ward 9 delegate) – [interest in project] As a member of a coastal<br />

environmental society totalling 300-400 member, <strong>and</strong> as an elected member representing<br />

environmental interests <strong>and</strong> concerns on the Ward 9 committee. Views: A very desirable low<br />

pollution industry. Fully in favour of the “coffer dam <strong>and</strong> Kaplan turbine” suggestion as being an<br />

environmentally acceptable option. Very interested in the economic efficiency of a “wave energy”<br />

project. Would seem to enable continued employment <strong>and</strong> expansion of labour force – very<br />

desirable.


3 SECOND PHASE<br />

The second phase of public participation comprised a stakeholder comment period. The Draft BAR<br />

was distributed to authorities <strong>and</strong> made available for a 40 day comment period from 23 March to 2<br />

May 2012 in order to allow interested <strong>and</strong> affected parties (I&APs) <strong>and</strong> authorities an opportunity to<br />

comment on the Draft BAR. Copies of the full <strong>report</strong> were made available at the following locations:<br />

<br />

<br />

<br />

<br />

Hermanus public library;<br />

Abagold Offices, New Harbour , Hermanus;<br />

Offices of <strong>Anchor</strong> <strong>Environmental</strong> Consultants; <strong>and</strong><br />

Website of <strong>Anchor</strong> <strong>Environmental</strong> Consultants (www.anchorenvironmental.co.za).<br />

Emails were sent to all registered stakeholders informing them of the availability of the Draft BAR<br />

<strong>and</strong> the comment period.<br />

Comments were received from stakeholder via email <strong>and</strong> two meetings, one with authorities <strong>and</strong><br />

one with employees of neighbouring abalone farms.<br />

from:<br />

to:<br />

date:<br />

subject:<br />

Rowan Yearsley<br />

Karen Tunley <br />

Wed 2012/05/02 08:14 AM<br />

RE: Slot-slope wave energy converter: draft BAR available for comment<br />

Dear Karen<br />

I hereby submit the attached comment on behalf of Mr Jacques du Plessis of Aquafarm Development<br />

(Pty) Ltd. Please send us a receipt to acknowledge that you have received it.<br />

Regards<br />

Rowan Yearsley<br />

Research & Development Manager: Abalone Division<br />

Terrasan Group Ltd , Mariculture Division, New Harbour, Hermanus 7200<br />

TEL: +27 28 312 4513 FAX: +27 28 313 2440 MOBILE: +27 72 636 1571<br />

Email: rowan@aquafarm.co.za<br />

A member of the TerraSan Group of Companies


Given the number of concerns raised by Aquafarm it was agreed that an additional meeting be held<br />

between Aquafarm, Abagold <strong>and</strong> <strong>Anchor</strong> <strong>Environmental</strong> Consultants. The minutes of the meeting<br />

are detailed below as well as a response to Aquafarm.<br />

Date: 8 June 2012<br />

Minutes<br />

Venue:<br />

Time:<br />

Aquafarm, Hermanus<br />

10h00-11h30<br />

ATTENDANCE:<br />

Aquafarm Abagold <strong>Anchor</strong><br />

<strong>Environmental</strong><br />

Jacques Du Plessis JDP Pierre Hugo PH Barry Clark BC<br />

Rowan Yearsley RY Christo Du CDP<br />

Plessis<br />

No<br />

.<br />

Item<br />

Discussion<br />

1. Welcome<br />

<strong>and</strong><br />

Introduction<br />

s<br />

2. Issues of<br />

concern<br />

raised by<br />

Aquafarm<br />

PH agreed opened the meeting. He apologised for not including the<br />

Aquafarm sump <strong>and</strong> pumphouse on the site drawings for the WEC<br />

project. He indicated this was merely an oversight rather than a<br />

deliberate omission. He acknowledged that as an abalone farmer himself<br />

he was well aware of the importance of water quality on the farms.<br />

JDP outlined concerns that Aquafarm had with the proposed WEC<br />

project:<br />

o Insufficient detail provided on construction methods;<br />

o Potential impacts on water quality were not adequately addressed<br />

in the <strong>report</strong> (toxicity of newly cast concrete, blasting, sediment<br />

plumes, all represent risks to adjacent abalone farms);<br />

o Aquafarm water intake should be included on site plans along with<br />

key project infrastructure (coffer dams etc);<br />

o Impact on nearshore wave energy has not been adequately<br />

assessed, specifically impacts to Aquafarm pumphouse<br />

o Impact of blasting on infrastructure on other farms (e.g. seawalls);<br />

o Project EMP does not provide for sufficient consultation <strong>and</strong> liaison<br />

with neighbouring farms – more frequent meetings <strong>and</strong><br />

notifications are required; <strong>and</strong><br />

o Accumulation of debris (kelp <strong>and</strong> sediment) in the coffer dams <strong>and</strong><br />

impact on water quality needs to be addressed<br />

He asked that each of these issues be address in more detail in the Basic<br />

Assessment <strong>report</strong> to enable them <strong>and</strong> other stakeholders to better


3 Discussion<br />

on key<br />

design<br />

features for<br />

the project<br />

underst<strong>and</strong> the risks, <strong>and</strong> if necessary additional mitigation measures to<br />

be applied to mitigate the risks.<br />

BC suggested that they tackle these issues one by one such that a<br />

common underst<strong>and</strong>ing could be reached, <strong>and</strong> a way forward agreed to.<br />

All were in agreement with this proposal.<br />

PH acknowledged that not all aspects of the project were explained in<br />

detail in the BAR <strong>report</strong>. He proceeded to explain the key design<br />

features at the meeting:<br />

o The project combine 4 existing technologies: a slot-slope wall for<br />

capturing wave energy, one way valves on the back of the wall, a<br />

reservoir for smoothing water flows, <strong>and</strong> low head turbines.<br />

o He acknowledged that there were some risks to the environment<br />

<strong>and</strong> other beneficial uses thereof (notably water quality <strong>and</strong> altered<br />

wave dynamics) but was confident that these could be properly<br />

mitigated through the EIA process.<br />

BC explained the process that they had followed for the EIA to date.<br />

<strong>Anchor</strong> had appointed Prof Geoff Tomms from Stellenbosch University to<br />

assess potential impacts of wave dynamics while they (<strong>Anchor</strong>) had<br />

looked at impacts on water quality as part of the marine specialist study.<br />

Prof Tomms had indicated at the time when the original assessment was<br />

done that he was comfortable to provide a professional opinion on<br />

impacts of wave dynamics <strong>and</strong> that he felt it was not necessary to<br />

undertake full scale wave modelling at the time due to the nature of the<br />

project (he felt that impacts would be small). BC acknowledged though<br />

that Prof Tomms had not specifically considered impacts on the<br />

Aquafarm sump <strong>and</strong> pumphouse as these had not been reflected on the<br />

site plans he had been issued with.<br />

CDP suggested that they amend the site drawing to reflect these<br />

components <strong>and</strong> that they ask Prof. Tomms to come out for a second<br />

site visit to be undertaken with representatives from Aquafarm such that<br />

all concerns can be articulated directly to Prof. Tomms <strong>and</strong> that he can<br />

then make an assessment of the risks <strong>and</strong> agree on how these can<br />

effectively be mitigated.<br />

JDP explained that Aquafarm were particularly concerned about swells<br />

from the SW <strong>and</strong> S that may reflect off the E wall of the pilot WEC <strong>and</strong><br />

run up against the Aquafarm boundary wall <strong>and</strong> into the pumphouse.<br />

BC agreed that he would ask Prof. Tomms to come out for a second site<br />

visit on a mutually convenient date. Everyone was comfortable with this<br />

approach.<br />

RY then highlighted Aquafarms concerns regarding water quality,<br />

particularly relating to casting of concrete in the sea <strong>and</strong> potential<br />

toxicity to farmed abalone.<br />

PH explained that they had no intention of pouring concrete directly into<br />

the sea <strong>and</strong> that there would be no direct contact between fresh<br />

concrete <strong>and</strong> seawater. He proceeded to give a detailed description with<br />

conceptual diagrams of how the coffer dams would be constructed.


PH explained that the coffer dams will be modular in the construction<br />

<strong>and</strong> would comprise a series of base units <strong>and</strong> pre-cast concrete units<br />

that would be slotted on top of these. Construction of the base units<br />

would start with a steel frame (termed a coffer dam in the BAR) with<br />

adjustable legs. This work would only be done under very clam<br />

conditions – when wave height was


JDP thanked PH for his explanation <strong>and</strong> agreed that potential impacts to<br />

water quality would be low if the methods as described were followed<br />

<strong>and</strong> that he wanted to see this detailed plan incorporated into the BAR.<br />

He also requested that adequate warning be provided to the<br />

neighbouring abalone farms regarding days when concrete would be<br />

poured. This would allow them to be on st<strong>and</strong>by to turn off their intake<br />

pumps should there be an accident (i.e. fresh concrete released into the<br />

sea). He also suggested that casting be done when there was sufficient<br />

water movement to disperse any spilled concrete (i.e. perhaps avoid<br />

extremely calm conditions). He also suggested that the abalone farms<br />

could use their pumps to clear any contaminated water should this be<br />

necessary by pumping water directly to waste for a period of time.<br />

RY indicated he was also satisfied with the proposed construction<br />

method provided issues raised by JDP were adequate addressed. He<br />

indicated that it was very important that stakeholders were kept up to<br />

date on all proposed activities on a weekly or even daily basis. He<br />

suggested that a stakeholder forum be established through which all<br />

communications be directed. He indicated that weekly forum meetings<br />

would probably be adequate but this may need to be more frequent<br />

when concrete pouring, blasting or drilling was undertaken. He stressed<br />

that they would need advance warning for all these activities.<br />

JDP also expressed concern regarding impacts of blasting <strong>and</strong> how this<br />

may affect the integrity of their infrastructure (e.g. seawall). He indicated<br />

that he needed to see more detail on how, where <strong>and</strong> when this would<br />

take place.<br />

CDP explained that almost all blasting would take place above the water<br />

line <strong>and</strong> would follow similar protocols to blasting that was being<br />

undertaken for their existing Sulaimanzi project. He explained that there<br />

had been concerns or complaints about this owing to the fact that they<br />

were using Nonex rather that high explosive. JDP agreed with this.<br />

JDP asked if it would not be possible to move the pilot WEC further away<br />

from the Aquafarm site. Currently it is situated right on the border of<br />

their farm.<br />

CDP explained that this was the only suitable site for the pilot WEC as it<br />

was a small bay with exactly the right bottom profile <strong>and</strong> dimensions.<br />

There were no other suitable sites in the immediate area. He suggested<br />

that the construction work be undertaken in a stepwise manner <strong>and</strong> that<br />

they confirm with the stakeholder forum that all stakeholders were<br />

happy before proceeding to the next step of the process.<br />

RY indicated that he was still concerned about biofouling, <strong>and</strong><br />

accumulation of debris in the reservoirs <strong>and</strong> how this would be cleared.<br />

He indicated that if biofouling material was simply scraped off the walls<br />

of the dam into the sea that this material could either accumulate in the<br />

area or be sucked into the Aquafarm sump <strong>and</strong> block the pump. He was<br />

also concerned that if debris was allowed to accumulate in the sump of<br />

the WEC reservoirs that this would decay <strong>and</strong> negatively affect water<br />

quality in the area.<br />

PH explained that the reservoirs would be cleaned of debris every few<br />

days. This would be undertaken at low tide <strong>and</strong> was possible as the floor<br />

of the reservoirs was at means ea level. He suggested also that they


could create deeper sump in the bottom of each of the reservoirs from<br />

which debris (kelp, s<strong>and</strong> <strong>and</strong> gravel) could be pumped using a gravel<br />

pump. This material would be disposed of on l<strong>and</strong> (l<strong>and</strong>fill). JDP <strong>and</strong> RY<br />

indicated that they were satisfied with this explanation.<br />

5 Closure The meeting closed at 11h30. PH thanked JDP <strong>and</strong> RY for attending the<br />

meeting <strong>and</strong> for their inputs. BC indicated that he would be in touch to<br />

arrange a site meeting with Geoff Tomms as soon as possible. RY<br />

requested that that Aquafarm be given an opportunity to have a look<br />

<strong>and</strong> comment on the revised BAR <strong>report</strong> before it was submitted to DEA.<br />

BC agreed that this was a good idea <strong>and</strong> undertook to do this.<br />

A second site vist was arranged for Prof. Geoff Toms to assess the impacts of altered wave energy<br />

<strong>and</strong> currents on the Aquafarm infrastructure as agreed in the meeting held on the 8 th of June<br />

between Aquafarm, Abagold <strong>and</strong> <strong>Anchor</strong> <strong>Environmental</strong> Consultants.<br />

Date: 2 July 2012<br />

Minutes<br />

Venue:<br />

Time:<br />

Aquafarm, Hermanus<br />

10h00-11h30<br />

ATTENDANCE:<br />

Aquafarm Abagold <strong>Anchor</strong><br />

<strong>Environmental</strong><br />

Rowan Yearsley RY Pierre Hugo PH Barry Clark BC<br />

Christo Du CDP Geoff Tomms GT<br />

Plessis<br />

No. Item Discussion<br />

1. Welcome<br />

<strong>and</strong><br />

Introductions<br />

2. Site<br />

inspection<br />

BC introduced GT to the other participants<br />

RY thanked everyone for attending<br />

PH produced copies of the revised site plans showing the location of the<br />

Aquafarm sump <strong>and</strong> pumphouse in relation to the proposed WEC<br />

infrastructure<br />

RY explained briefly Aquafarms concerns with the proposed WEC project<br />

<strong>and</strong> then suggested that everyone go out on site to have a look at how<br />

the WEC infrastructure would be oriented in relation to the existing<br />

infrastructure. All agreed.<br />

Everyone went out on site. PH explained <strong>and</strong> indicated how the various<br />

components of the WEC project would be aligned on site including the<br />

pilot, main <strong>and</strong> pump assistance ponds <strong>and</strong> the effluent line turbine.<br />

GT inspected all the relevant features <strong>and</strong> examined the orientation of<br />

the shoreline <strong>and</strong> WEC infrastructure in relation to the Abagold <strong>and</strong>


Aquafarm seawalls <strong>and</strong> the Aquafarm sump <strong>and</strong> pumphouse. He took a<br />

number of photographs of the site. He asked PH if he could provide<br />

heights of the various rocky promontories on the site <strong>and</strong> a number of<br />

questions relating to the dimensions of the infrastructure (height of the<br />

sloped <strong>and</strong> side walls of the WECs). He explained what impact he<br />

thought the WEC infrastructure would have on wave energy <strong>and</strong> water<br />

movement at the site. He indicated that he was only concerned about<br />

extreme storms <strong>and</strong> that his main concern related to the reflection of<br />

waves off the side of the pilot WEC up against the Abagold sea wall <strong>and</strong><br />

from there towards the Aquafarm pumphouse during these events. He<br />

indicated that it may be necessary to place some large boulders against<br />

the base of the wall at this point to break up the waves <strong>and</strong> thus<br />

mitigate any potential impacts on the seawalls <strong>and</strong> the pumphouse. He<br />

indicated that he would amend his original <strong>report</strong> to reflect these<br />

findings. He also indicated that full-scale wave modelling may be<br />

required at a later stage to inform the minimum size of boulder required<br />

but that this was not warranted at this stage of the project. He was<br />

confident that mitigation of this nature would be effective.<br />

5 Closure The meeting closed at 11h30. PH <strong>and</strong> RY thanked everyone for<br />

attending the meeting <strong>and</strong> for their inputs. GT promised that he would<br />

prepare his <strong>report</strong> as quickly as possible. BC indicated that they would<br />

update the BAR accordingly, incorporating findings of GT study <strong>and</strong><br />

other issues discussed at the two meetings with Aquafarm. He<br />

undertook to send a draft copy of the <strong>report</strong> to RY as soon as it was<br />

ready.<br />

from: Karen Tunley<br />

to:<br />

Jacques duPlessis <strong>and</strong> Rowan Yearsley<br />

date: Thu 2012/08/16 02:26 PM<br />

subject: RE: Comments on draft Basic Assessment Report for Wave Energy Converter -<br />

Aquafarm Development<br />

Dear Jacques <strong>and</strong> Rowan,<br />

Thank you for providing comment on the Draft BAR for the proposed development <strong>and</strong> operation of<br />

a slot-slope wave energy converter for Abagold. The minutes of the meetings held between<br />

yourselves, Abagold <strong>and</strong> <strong>Anchor</strong> are attached. The BAR <strong>and</strong> accompanying documents (Maine<br />

Specialist Report <strong>and</strong> <strong>Environmental</strong> Management Programme) have been revised to address these<br />

concerns. I have summarised the measures that have been taken to address your concerns below. A<br />

copy of the revised BAR will be sent to you shortly.<br />

1. Construction details.<br />

A more detailed description with illustrations of the construction activities has been<br />

provided in the marine specialist <strong>report</strong> <strong>and</strong> the BAR. This should help to clarify any<br />

confusion regarding coffer dams <strong>and</strong> the casting of cement in the marine environment <strong>and</strong><br />

help to alleviate several concerns raised.


2. Water quality impacts to Abalone Farms<br />

Potential impacts of impaired water quality to neighbouring abalone farms has been<br />

assessed as a separate impacts in both the marine specialist <strong>report</strong> <strong>and</strong> the BAR.<br />

3. Management measures to mitigate potential water quality impacts have been included in<br />

the marine specialist <strong>report</strong> the BAR <strong>and</strong> the EMPr.<br />

The recommended measures are precautionary management measures to mitigate the<br />

severity of potential impacts by ensuring that personnel are available on site at each of the<br />

farms to manage the intake systems during blasting <strong>and</strong> the casting of cement. A monthly<br />

schedule of planned activities is to be made available by Abagold <strong>and</strong> discussed with all<br />

neighbouring abalone farms. During periods when casting <strong>and</strong>/or blasting activities are<br />

planned, weekly activity schedules indicating the proposed dates of casting <strong>and</strong>/or blasting<br />

activities must be provided to neighbouring abalone farms. At least one days notice<br />

regarding changes to this schedule must be issued to all potentially affected farms.<br />

Construction activities (notably casting <strong>and</strong> blasting operations) should be limited to week<br />

days to ensure that there are personnel on site at the other abalone farms to respond to any<br />

incidents that may occur. Prior agreement must be sought from other abalone farms for<br />

casting <strong>and</strong> blasting operations to be undertaken outside of these periods. (These measures<br />

are recommended in the marine specialist <strong>report</strong> <strong>and</strong> repeated in the BAR <strong>and</strong> EMPr).<br />

4. The position of Aquafarm’s water abstraction point has been indicated on the site diagrams.<br />

5. Professor Geof Tomms conducted a second site visit <strong>and</strong> revised his contribution to the<br />

marine specialist <strong>report</strong> such that the impacts of nearshore wave energy alteration on<br />

Aquafarm’s infrastructure, as a result of the WEC were considered <strong>and</strong> mitigation measures<br />

recommended. These recommendations are reflected in the marine specialist <strong>report</strong> the<br />

BAR <strong>and</strong> the EMPr.<br />

6. The EMPr has been amended such that an ECO is required to conduct weekly site<br />

inspections <strong>and</strong> be on site for all blasting <strong>and</strong> cement casting activities. No ECO has been<br />

appointed at this stage. It is likely that one will only be appointed once Abagold have<br />

received authorisation <strong>and</strong> secured a lease for the sea shore.<br />

7. The risk of the build up of organic matter within the WEC dams was addressed during the<br />

design phase of the project. The plans presented to <strong>Anchor</strong> by Abagold included actions to<br />

remove kelp <strong>and</strong> fouling organisms from the WEC dams during the operational phase. As<br />

such <strong>Anchor</strong> did not assess this as a potential impact. During the revision though this was<br />

added as a required management measure in the EMPr during the operational phase.<br />

I hope that you are satisfied with the amendments.<br />

Kind regards,<br />

Karen Tunley |senior consultant<br />

<strong>Anchor</strong> <strong>Environmental</strong> Consultants<br />

8 Steenberg House<br />

Silverwood Close


Tokai<br />

7945<br />

South Africa<br />

www.anchorenvironmental.co.za<br />

Tel: +27 21 701 3420<br />

Fax: +27 21 701 5280<br />

From: Rowan Yearsley [mailto:rowan@aquafarm.co.za]<br />

Sent: 10 September 2012 09:03 AM<br />

To: 'Karen Tunley'<br />

Cc: 'Adri Claassen'<br />

Subject: AQF final <strong>comments</strong> on revised BAR for Wave Energy Converter<br />

Dear Karen<br />

We were approached by Abagold to discuss the revised BAR <strong>and</strong> asked to submit a final comment on<br />

this. Our final comment is attached.<br />

Regards<br />

Rowan Yearsley<br />

Research & Development Manager: Abalone Division<br />

Terrasan Group Ltd , Mariculture Division, New Harbour, Hermanus 7200<br />

TEL: +27 28 312 4513 FAX: +27 28 313 2440 MOBILE: +27 72 636 1571<br />

Email: rowan@aquafarm.co.za<br />

A member of the TerraSan Group of Companies<br />

Important Notice<br />

Important restrictions, qualifications <strong>and</strong> disclaimers ("the Disclaimer") apply to this<br />

email. To read this, click on the following address or copy into your Internet browser:<br />

http://www.terrasan.co.za/disclaimer<br />

The Disclaimer forms part of the content of this email in terms of Section 11 of the<br />

Electronic Communications <strong>and</strong> Transactions Act, 25 of 2002.


From: 'Karen Tunley'<br />

Sent: 10 September 2012 09:05 AM<br />

To: Rowan Yearsley<br />

Cc: 'Adri Claassen'<br />

Subject: AQF final <strong>comments</strong> on revised BAR for Wave Energy Converter<br />

Hi Rowan,<br />

I have received your final <strong>comments</strong>. These will be included in the BAR to be submitted to DEA. We<br />

will make the necessary changes to the EMP.<br />

Kind regards,<br />

Karen Tunley |senior consultant


from:<br />

to:<br />

date:<br />

subject:<br />

Greg Tutt<br />

Karen Tunley <br />

Wed 2012/05/02 04:52 PM<br />

RE: Slot-slope wave energy converter: draft BAR available for comment<br />

Hi Karen<br />

Herewith our <strong>comments</strong> on the draft BAR.<br />

On the whole we have no major issues with the BAR, but would like to request the following:<br />

During the construction phase, Abagold are to contact the neighbouring farms (especially<br />

HIK as we share the same sump site) prior to blasting to confirm that it suits the farms from<br />

a production <strong>and</strong> operational perspective<br />

Although the units will be precast, there will need to be pouring of some concrete, again we<br />

request timeous notification prior to the pouring of any concrete in <strong>and</strong> around the sump<br />

area.<br />

Abagold to ensure HIK access to the pumphouse at all times during construction.<br />

Construction as far as possible to be limited to weekdays only, to avoid crises over weekends<br />

when there are limited staff on site.<br />

Also are <strong>Anchor</strong> acting as the ECO If so are you the contact person<br />

regards<br />

Greg Tutt<br />

(Technical manager)<br />

HIK Abalone Farm<br />

Tel: 028-313 1055<br />

Fax: 028-312 2288<br />

Cell: 082 3644 876<br />

www.hik.co.za<br />

from:<br />

to:<br />

date:<br />

subject:<br />

Karen Tunley<br />

Greg Tutt<br />

Thu 2012/08/16 01:55 PM<br />

RE: Slot-slope wave energy converter: draft BAR available for comment<br />

Dear Greg,<br />

Thank you for providing comment on the Draft BAR for the proposed development <strong>and</strong> operation of<br />

a slot-slope wave energy converter for Abagold. The BAR <strong>and</strong> accompanying documents (Maine<br />

Specialist Report <strong>and</strong> <strong>Environmental</strong> Management Programme) have been revised to address these<br />

concerns. I have indicated below the measures that will be required of Abagold <strong>and</strong> the respective<br />

contractors as provided in the BAR:


1. Additional management measures were requested by the neighbouring abalone farmers<br />

<strong>and</strong> it is recommended that these measures be made m<strong>and</strong>atory. The recommended<br />

measures are precautionary management measures to mitigate the severity of potential<br />

impacts by ensuring that personnel are available on site at each of the farms to manage<br />

the intake systems during blasting <strong>and</strong> the casting of cement. A monthly schedule of<br />

planned activities is to be made available by Abagold <strong>and</strong> discussed with all neighbouring<br />

abalone farms. During periods when casting <strong>and</strong>/or blasting activities are planned,<br />

weekly activity schedules indicating the proposed dates of casting <strong>and</strong>/or blasting<br />

activities must be provided to neighbouring abalone farms. At least one days notice<br />

regarding changes to this schedule must be issued to all potentially affected farms.<br />

Construction activities (notably casting <strong>and</strong> blasting operations) should be limited to<br />

week days to ensure that there are personnel on site at the other abalone farms to<br />

respond to any incidents that may occur. Prior agreement must be sought from other<br />

abalone farms for casting <strong>and</strong> blasting operations to be undertaken outside of these<br />

periods. (These measures are recommended in the marine specialist <strong>report</strong> <strong>and</strong><br />

repeated in the BAR <strong>and</strong> EMPr)<br />

2. HIK Abalone Farm extract water from the sea for operations on their farm via a<br />

pumphouse situated on the Abagold site. In order to ensure HIK Abalone Farm’s<br />

operations are not negatively disturbed access to the pumphouse must be granted to HIK<br />

Abalone Farm throughout the construction period. (This can be found within the EMPr)<br />

No ECO has been appointed at this stage. It is likely that one will only be appointed once Abagold<br />

have received authorisation <strong>and</strong> secured a lease for the sea shore.<br />

I hope that you are satisfied with these amendments. The Final BAR is to be submitted shortly to<br />

DEA as part of the application for authorisation. A copy of the Final BAR will be made available to all<br />

stakeholders.<br />

Kind regards,<br />

Karen Tunley |senior consultant


A meeting <strong>and</strong> site inspection between the authorities (DEA, Cape Nature <strong>and</strong> Overstr<strong>and</strong><br />

Municipality), Abagold <strong>and</strong> <strong>Anchor</strong> <strong>Environmental</strong> Consultants was arranged to discuss the EIA<br />

process to date <strong>and</strong> going forward <strong>and</strong> to provide more clarity regarding the proposed project <strong>and</strong><br />

the locality. The lease agreement mentioned in Cape Nature’s <strong>comments</strong> on the draft BAR above<br />

was discussed at this meeting.<br />

Date: 11 June 2012<br />

Minutes<br />

Venue:<br />

Time:<br />

Abagold, Hermanus<br />

10h00-11h30<br />

ATTENDANCE:<br />

Name Affiliation Abbreviation<br />

Takalani Maswime DEA TK<br />

Tierck Hoekstra Cape Nature: Area Manager, Overberg TH<br />

Penelope Aplon Overstr<strong>and</strong> Local Municipality PA<br />

Christo Du Plessis Abagold CD<br />

Barry Clark <strong>Anchor</strong> <strong>Environmental</strong> BC<br />

No. Item Discussion<br />

1. Welcome<br />

<strong>and</strong><br />

Introductions<br />

BC welcomed everyone to the meeting <strong>and</strong> thanked them all for taking<br />

the time to attend. BC explained that the meeting had been called at<br />

the request of the authorities (both DEA National <strong>and</strong> DEA: Oceans <strong>and</strong><br />

Coasts had requested this meeting to give the various authorities<br />

responsible an opportunity to visit the site <strong>and</strong> discuss the project).<br />

When the meeting was due to start, a number of participants who had<br />

been invited to the meeting (notably DEA: Oceans & Coasts, Overberg<br />

District Municipality, DEADP) had not yet arrived, so it was agreed to<br />

wait a while to give them a chance to get there.<br />

After a further 20 minutes it was agreed to start as no one else had<br />

arrived.<br />

2. EIA process BC explained the process that had been followed for the EIA. He<br />

explained that an application had initially been submitted to DEADP <strong>and</strong><br />

that they had been referred to DEA due to the nature of the project<br />

(electricity generation). DEA had agreed to downgrade the project from<br />

Scoping <strong>and</strong> EIA to Basic Assessment. A BA draft <strong>report</strong> had been<br />

circulated in March 2012. He also summarised potential impacts that<br />

had been identified in the <strong>report</strong> <strong>and</strong> <strong>responses</strong> that had been received<br />

from stakeholders.<br />

TH asked if an application for lease of the l<strong>and</strong> had been submitted to<br />

Cape Nature.<br />

CDP explained that Niel Malan <strong>and</strong> other representatives from DEA:<br />

Oceans & Coasts had indicated that due to the nature of the project that


an application for lease of sea space would have to be made to the<br />

National Assembly rather than through the normal channels (in this case<br />

Cape Nature). He indicated that they had been advised to wait until the<br />

BAR had been submitted before initiating this process.<br />

TH felt this was very irregular <strong>and</strong> undertook to follow this issue up with<br />

the legal advisor at Cape Nature.<br />

TK queries if the project required approval from NERSA (National<br />

Electricity Regulator of South Africa).<br />

BC explained that they had invested this <strong>and</strong> that NERSA had confirmed<br />

that as the electricity was for own use only <strong>and</strong> would not be fed into<br />

the national grid that their approval was not required.<br />

TK asked about the status of the objection from Mark Raynard regarding<br />

visual impacts <strong>and</strong> impacts on wave energy.<br />

CDP explained that Mark Raynard had a lease on the seashore adjacent<br />

to the Abagold site which he proposed using to construct an abalone<br />

farm. Approval for this development had been issues several years ago<br />

but nothing had yet been done. He also explained that Mr Raynard was<br />

also investigating options for building a hotel on the l<strong>and</strong>ward side of<br />

the site next to the Abagold farm.<br />

BC explained that <strong>Anchor</strong> had commissioned both Visual <strong>and</strong> a Wave<br />

energy specialist studies as part of the EIA process. The Visual specialist<br />

(B. Oberholzer) had indicated that the proposed development was fully<br />

in keeping with the existing developments on the site (an industrial area<br />

within a commercial fishing harbour which including existing abalone<br />

farming infrastructure) <strong>and</strong> that potential visual impacts of the proposed<br />

project were considered to be low. The Wave energy specialist (Prof. G<br />

Tomms) has confirmed that the proposed infrastructure would not<br />

result in any increase in wave energy on the site <strong>and</strong> that if anything<br />

wave energy would be reduced due to the nature of the project<br />

(harvesting of wave energy for electricity generation).<br />

BC also explained that Aquafarm (another abalone farm on the W side of<br />

Abagold) had also expressed concern regarding impacts on wave energy<br />

<strong>and</strong> water quality <strong>and</strong> that these were being addressed in consultation<br />

with Aquafarm.<br />

PA asked about the various project components.<br />

CDP explained that the project comprised 4 components including a pilot<br />

WEC, the main WEC, a pump assistance pond <strong>and</strong> the effluent line<br />

turbine. He explained the function of each component <strong>and</strong> how it was<br />

designed to work.<br />

3 Site visit All meeting participants then went out on site for an inspection.<br />

CDP explained the proposed layout of all components of the project the<br />

infrastructure on the site <strong>and</strong> answered all question relating to this.<br />

5 Closure The meeting closed at 12h00. BC thanked all the participants for<br />

attending the meeting <strong>and</strong> promised that the final BAR <strong>report</strong> would be<br />

finalised as quickly as possible <strong>and</strong> would be sent to DEA.


from:<br />

to:<br />

date:<br />

subject:<br />

Karen Tunley<br />

Samantha Ralston<br />

Thu 2012/08/16 02:37 PM<br />

RE: Slot-slope wave energy converter: draft BAR available for comment<br />

Dear Samatha,<br />

Thank you for providing comment on the Draft BAR for the proposed development <strong>and</strong> operation of<br />

a slot-slope wave energy converter for Abagold. The BAR <strong>and</strong> accompanying documents (Maine<br />

Specialist Report <strong>and</strong> <strong>Environmental</strong> Management Programme) have been revised to address<br />

concerns raised by neighbouring abalone farms.<br />

A meeting <strong>and</strong> site inspection between the authorities (DEA, Cape Nature <strong>and</strong> Overstr<strong>and</strong><br />

Municipality), Abagold <strong>and</strong> <strong>Anchor</strong> <strong>Environmental</strong> Consultants was arranged to discuss the EIA<br />

process to date <strong>and</strong> going forward <strong>and</strong> to provide more clarity regarding the proposed project <strong>and</strong><br />

the locality. The lease agreement mentioned in Cape Nature’s <strong>comments</strong> on the draft BAR above<br />

was discussed at this meeting. Please find the minutes from this meeting attached.<br />

The Final BAR is to be submitted shortly to DEA as part of the application for authorisation. A copy of<br />

the Final BAR will be made available to all stakeholders.<br />

Kind regards,<br />

Karen Tunley |senior consultant<br />

<strong>Anchor</strong> <strong>Environmental</strong> Consultants<br />

8 Steenberg House<br />

Silverwood Close<br />

Tokai<br />

7945<br />

South Africa<br />

www.anchorenvironmental.co.za<br />

Tel: +27 21 701 3420<br />

Fax: +27 21 701 5280