C<strong>in</strong>ema VAV Ceil<strong>in</strong>g - Air System Simulation Results<br />
Month<br />
Central<br />
Cool<strong>in</strong>g Coil<br />
Load<br />
(kWh)<br />
Supply Fan<br />
(kWh)<br />
Return Fan<br />
(kWh)<br />
Vent. Reclaim<br />
Device<br />
(kWh)<br />
Light<strong>in</strong>g<br />
(kWh)<br />
Electric<br />
Equipment<br />
(kWh)<br />
January 5 140 35 0 312 0<br />
February 5 127 32 0 282 0<br />
March 61 139 35 0 312 0<br />
April 403 139 35 0 302 0<br />
May 280 144 36 0 312 0<br />
June 785 140 35 0 302 0<br />
July 1498 148 37 0 312 0<br />
August 1799 148 37 0 312 0<br />
September 1347 142 35 0 302 0<br />
October 269 145 36 0 312 0<br />
November 62 136 34 0 302 0<br />
December 1 140 35 0 312 0<br />
Total 6515 1689 422 0 3670 0<br />
C<strong>in</strong>ema VAV Ceil<strong>in</strong>g – Cool<strong>in</strong>g Plant Simulation Results<br />
Month<br />
Cool<strong>in</strong>g Coil<br />
Load<br />
(kWh)<br />
Plant Load<br />
(kWh)<br />
Chiller Output<br />
(kWh)<br />
Chiller Input<br />
(kWh)<br />
Primary Chilled<br />
Water Pump<br />
(kWh)<br />
Secondary<br />
Chilled Water<br />
Pump<br />
(kWh)<br />
January 5 9 9 3 3 1<br />
February 5 14 14 4 6 3<br />
March 61 79 79 27 14 6<br />
April 403 499 499 168 73 30<br />
May 280 382 382 128 78 33<br />
June 785 971 971 338 142 59<br />
July 1498 1761 1761 631 200 84<br />
August 1799 2084 2084 753 216 90<br />
September 1347 1592 1592 554 187 78<br />
October 269 388 388 129 90 38<br />
November 62 89 89 30 21 9<br />
December 1 8 8 2 5 2<br />
Total 6515 7877 7877 2768 1035 432