KINGSCOTE AIRPORT MASTER PLAN<br />

KINGSCOTE AIRPORT MASTER PLAN<br />

CONTENTS<br />

PAGE No<br />

Movement Area <strong>Plan</strong>ning 3<br />

Critical Aircraft 3<br />

Turbo-prop Replacement Options 3<br />

Consideration to Regional Jets 3<br />

The Role of Executive Jets 4<br />

Critical Aircraft Recommendation 4<br />

Runways 5<br />

Runway Length Needed for the Critical Aircraft 5<br />

Runway Width and Strength Considerations 5<br />

Requirement for Secondary Runways 5<br />

Runway Capacity & Demand 7<br />

Taxiways 8<br />

Provision of Additional Taxiways 8<br />

<strong>Apr</strong>ons 10<br />

RPT Parking 10<br />

General Aviation Parking 10<br />

Refuelling <strong>Apr</strong>on 10<br />

Helicopter Parking 10<br />

Terminal Area <strong>Plan</strong>ning 12<br />

Passenger Terminal 12<br />

Need for Expansion 12<br />

Security Screening 13<br />

Expansion Options 13<br />

Roads Car Parks Bus Parking etc 13<br />

Other Aviation Facilities 14<br />

Aircraft Hangar 14<br />

Aircraft Refuelling 14<br />

Navigation Aids 14<br />

<strong>Airport</strong> Lighting 15<br />

Rescue & Fire Fighting 15<br />

Emergency Facilities RFDS/Police/CFS 15<br />

Meteorological Facilities 15<br />

<strong>Airport</strong> Maintenance 15<br />

Non aviation Facilities 16<br />

Commercial Sites 16<br />

Surrounding Area <strong>Plan</strong>ning 17<br />

Protection of Airspace 17<br />

Aircraft Noise 18<br />

Environmental Considerations 20<br />

Implementation 22<br />

Appendix A Supporting Data and References 23


KINGSCOTE AIRPORT MASTER PLAN<br />

LIST OF TABLES AND FIGURES<br />

TABLES<br />

Table 1 Possible Future Critical Aircraft<br />

Table 2 Wind Speed by Direction and Percentage of Time<br />

Table 3 Terminal Area Estimates<br />

Table 4 Building Site Acceptability Based On Aircraft Noise Levels<br />

Table 5 List of Future Development Items and Associated Triggers<br />

FIGURES<br />

Figure 1 Overall Layout Showing Runway Taxiway and <strong>Apr</strong>on Development<br />

Figure 2 Long term Development of the Terminal Area and <strong>Apr</strong>on<br />

Figure 3 Identification of Potential Commercial Sites<br />

Figure 4 Single Event Noise Contours for Saab 340/F50/Dash8<br />

Figure 5 Stormwater Drainage and Flora Areas


KINGSCOTE AIRPORT MASTER PLAN<br />

Movement Area <strong>Plan</strong>ning<br />

The following study looks seeks to provide a planned approach to development at <strong>Kingscote</strong><br />

<strong>Airport</strong> over the next 15-20 years.<br />

Critical Aircraft<br />

The critical aircraft for master planning purposes can be defined as the largest aircraft likely<br />

to use the aerodrome on a regular basis. Currently the turbo prop Saab 340 with 34<br />

passenger seats fills this role. Although larger aircraft may occasionally visit <strong>Kingscote</strong>, they<br />

do not have a key role in the current economics of the airport and therefore are not<br />

considered critical in terms of provision of infrastructure.<br />

In 15-20 years time, the Saab 340’s are unlikely to be operating due to their age; production<br />

ceased in 1999. Similarly the Fokker F50 with 50-58 passenger seats, currently flying to<br />

several ports in South Australia, ceased production in 1996. At the end of the 15-20 year<br />

master planning period, the newest Saab 340s will be over 25 year old. By this time, the<br />

number of permitted load cycles from landings, pressurisation, are likely to have been<br />

exceeded and the aircraft retired.<br />

Turbo-prop Replacement Options<br />

A replacement turbo prop is unlikely to be in the range of an 18 to 34 seat capacity, as worldwide,<br />

there are no such aircraft in production. Aerospatiale ATR 42, ATR 72 and Bombardier<br />

Q400, are currently the only turbo prop airliners being made. These models range from 44 to<br />

78 passenger seats.<br />

Aircraft of this type will fit into the existing infrastructure at <strong>Kingscote</strong> without the need for<br />

significant changes to the aircraft pavement. The increased seating capacity will potentially<br />

lead to increased congestion in the terminal especially if passengers from more than one<br />

flight are using the facility simultaneously.<br />

Looking at the forecasts in the <strong>Kingscote</strong> <strong>Airport</strong> Strategic <strong>Plan</strong>, the predicted passenger<br />

movements are estimated to range from 84,000 to 156,000 per annum by the year 2023/24<br />

(these are totals of the arrivals and departures). The passenger numbers equate to between<br />

3 to 6 flights daily using a 50 seat aircraft with 70% seat occupancy.<br />

Consideration to Regional Jets<br />

For short haul routes, turbo prop aircraft are significantly more cost effective than jets as they<br />

use around 30% less fuel. The speed advantage of the jet is largely negated when flying<br />

short stage lengths as the time spent boarding, taxiing, taking off and landing takes up a<br />

large portion of the flight time. Government regulations currently require greater security<br />

checks for regular passenger jets. Adding time for the higher level of passenger and<br />

possibly baggage screening, the overall travel time between Adelaide and <strong>Kingscote</strong> could<br />

increase if jets were introduced.<br />

Regional jets operating in Australia include the Embraer EMB 170 (70-78 seats) operated by<br />

Airnorth and Virgin and the EMB 190 (108-118 pax seats) operated by Virgin. Because of<br />

inefficiencies with short haul routes, these aircraft would only operate into <strong>Kingscote</strong> if there<br />

were sufficient passenger numbers flying direct to other ports such as Melbourne or Sydney.<br />

The passenger numbers in the Strategic <strong>Plan</strong> forecasts equate to between 1.5 to 3 flights<br />

daily of a 100 seat aircraft with a 70% seat occupancy.<br />

3


KINGSCOTE AIRPORT MASTER PLAN<br />

South Australian based passengers are likely to prefer Adelaide as their port of origin while<br />

International and interstate passengers may have a preference for either Melbourne or<br />

Sydney. So even if half the passengers originated from interstate, it only generates 1.5<br />

flights per day using optimistic forecast. The demand is unlikely to warrant an expected<br />

capital outlay of between $10M and $20M for infrastructure needed to allow introduction of<br />

regional jets.<br />

So at this stage unless there is significant shift in passenger demand, it is unlikely we will see<br />

regional jets operating regularly into <strong>Kingscote</strong> within the 15 to 20 year <strong>Master</strong> <strong>Plan</strong> study<br />

period.<br />

The Role of Executive Jets<br />

These aircraft currently operate on an occasional basis into <strong>Kingscote</strong>, primarily servicing the<br />

high end resort market. Provided operating times do not clash with scheduled flights, the<br />

existing passenger facilities at <strong>Kingscote</strong> will generally be satisfactory.<br />

The ability of the aircraft pavements to cope with increased loads and tyre pressures<br />

becomes an issue when larger corporate jets such as the Gulfstream IV are proposed.<br />

Those aircraft requiring stronger pavements, greater runway lengths etc, may need to look at<br />

alternatives as their numbers are unlikely to generate enough revenue to the airport through<br />

landing charges to justify additional infrastructure solely for these occasional aircraft.<br />

Details of the weight and passenger capacity of existing and possible future aircraft for<br />

<strong>Kingscote</strong> are listed in Table 1:<br />

Critical Aircraft Recommendation<br />

Based on known and predicted passenger trends, a turbo prop aircraft with a seating<br />

capacity range of approximately 50 to 80 appears to be the most likely choice to replace the<br />

current Saab 340 commuter fleet. The 50-80 seat aircraft typically have a wingspan of<br />

around 30m and a fuselage length of 35m. Some growth in size may occur; both<br />

Aerospatiale and Bombardier have plans for 90 seat stretched versions of the ATR 72 and<br />

Q400 models respectively, but they will remain within the Code 3C criterion which permits up<br />

to 36m wingspan. Either way, the current apron and terminal facilities can be expanded to<br />

accommodate all potential Code 3C turbo prop aircraft.<br />

Table 1 Possible Future Critical Aircraft<br />

TURBO PROP Max Weight kg Passengers<br />

Saab 340 (production ceased 1999) 13,200 34-36<br />

Fokker F50 (production ceased 1996) 20,820 up to 58<br />

Bombardier Dash 8 300 (production ceased 2008) 18,860 50-56<br />

ATR 42 500 18,600 44-50<br />

ATR 72 22,970 62-74<br />

Bombardier Q400 (Dash 8 400) 29,260 68-78<br />

JETS<br />

Embraer ERJ 170 35,990 70-78<br />

Fokker F100 (production ceased 1999) 41,730 107<br />

BAE 146 300 (production ceased 2000) 44,230 87<br />

Embraer ERJ 190 (comparison only – beyond <strong>Master</strong> <strong>Plan</strong>) 50,790 108-118<br />

Airbus 320 (comparison only – beyond <strong>Master</strong> <strong>Plan</strong>) 77,000 148-180<br />

Boeing B737 800 (comparison only – beyond <strong>Master</strong> <strong>Plan</strong>) 79,230 162-175<br />

4


KINGSCOTE AIRPORT MASTER PLAN<br />

Runways<br />

Runway Length Needed for the Critical Aircraft<br />

In broad terms, a runway length of approximately 1600m is needed for turbo prop regional<br />

airliners such as the Q400. Regional jets such as the Embraer 170, need around 1800m<br />

while B737/A320 domestic jet aircraft require in the order 2000m of runway. Refer Appendix<br />

A.<br />

The actual length needed will depend primarily on the aircraft model and the destination<br />

stage length (the longer the stage length means the aircraft has to carry more fuel which<br />

adds to the weight which increases the length requirement). Within the master planning 15<br />

year time frame, it is unlikely stage lengths longer than <strong>Kingscote</strong> direct to Melbourne or<br />

Sydney will be needed. The runway lengths noted above would be suitable for <strong>Kingscote</strong>-<br />

Melbourne/Sydney.<br />

The existing 1402m main runway 01/19 can be increased to 1524m while remaining inside<br />

the existing runway strip and clearway area (marked by the white gable markers). Further<br />

lengthening in the order of 220m is available within the aerodrome boundary to the south if<br />

needed.<br />

An extension to the north beyond the current clearway is unavailable due to the presence of<br />

Arranmore Road and a requirement to maintain an obstacle clear gradient over vehicles.<br />

So it is possible to have a runway length of 1740m without the need for land acquisition,<br />

although some clearing of trees on the adjacent properties will be needed.<br />

A future runway length of 1740m has been adopted for the 15 year <strong>Master</strong> <strong>Plan</strong>.<br />

Runway Width and Strength Considerations<br />

The existing 30m runway width is sufficient for turbo prop and jet aircraft including Embraer<br />

170. Boeing B737 and Airbus A320 models are also approved to operate off 30m runways.<br />

The existing sealed aircraft pavements were constructed to Fokker F27 standard at a<br />

maximum weight 20,000kgs. The pavements will require significant strengthening to cater<br />

for the heavier turbo prop aircraft through application of additional layers of crushed gravels<br />

and bituminous resurfacing. The heavier jets require much stronger pavements and possible<br />

consideration to asphalt surfacing, although some regional ports (Broome, Gove and Hervey<br />

Bay) cater for B737 services with only spray sealed runways. Strengthening of drainage<br />

culverts that run beneath the main runway will also be needed.<br />

Requirement for Secondary Runways<br />

The percentage of time an aircraft can use a runway without restriction due to cross winds, is<br />

termed the runway wind useability. The allowable cross wind tolerance increases as the size<br />

of aircraft increases.<br />

CASA does not specify a wind useability level; it is left to pilots to operate their aircraft within<br />

the specified allowable cross wind. ICAO Annex 14 1 recommends the number and<br />

orientation of runways should provide a usability of not less than 95% for the aeroplanes that<br />

the airport is intended to serve.<br />

1 Annex 14 –the International Standards and Recommended Practices” Aerodromes” Annex<br />

14 to the Convention on International Civil Aviation Volume I Aerodrome Design and<br />

Operations<br />

5


KINGSCOTE AIRPORT MASTER PLAN<br />

For planning purposes the limiting cross-wind component recommended for use in Annex 14<br />

is:<br />

− 37 kph (20 kt) for aircraft whose reference field length 2 is 1500m or over,<br />

− 24 kph (13 kt) for aircraft whose reference field length is 1200m or up to 1500m; and,<br />

− 19 kph (10 kt) for aircraft whose reference field length is less than 1200m.<br />

(ICAO Annex 14 2004)<br />

2 Reference Field Length is the minimum field length required for take-off at maximum<br />

certificated take-off mass, sea level, standard atmospheric conditions, still air and zero<br />

runway slope.<br />

The previous <strong>Master</strong> <strong>Plan</strong> found the main 01/19 runway had a useability of 94.2% based on<br />

a 24 kph allowable cross wind. Couper Technics 1997<br />

All the critical aircraft mentioned in this study have a cross wind capability in excess of 24<br />

kph, so the existing runway by itself can be considered suitable in terms of wind useability.<br />

Additional runways have been constructed at<br />

<strong>Kingscote</strong>, primarily to cater for light aircraft when<br />

winds on the main runway are unsuitable.<br />

The addition of the 06/24 and 15/33 runways<br />

increases the useability of the aerodrome to 99.74%<br />

for aircraft with a cross wind capability of 24 kph.<br />

Couper Technics 1997.<br />

Updated wind data was obtained from Bureau of<br />

Meteorology as shown in Table 2 overleaf.<br />

The data relates wind speed and direction to the<br />

percentage of time and for the occurrence.<br />

The wind data in Table 2 has been collated for the 9am and 3pm periods to represent typical<br />

operating periods, as opposed to a 24 hour average, where the results can be skewed as<br />

little activity occurs at night, particularly by small aircraft. Winds are also less intense at<br />

night.<br />

Keys aspects that can be drawn from the wind data include:<br />

−<br />

−<br />

−<br />

the majority of wind favours the north south runway;<br />

the strongest winds occur in the afternoon and are from a westerly direction; and,<br />

the data reinforces the findings of the 1997 <strong>Master</strong> <strong>Plan</strong>.<br />

The data confirms the current layout is appropriate in providing adequate cross wind<br />

useability for current and future aircraft likely to use <strong>Kingscote</strong> <strong>Airport</strong>.<br />

6


KINGSCOTE AIRPORT MASTER PLAN<br />

Table 2 Wind Speed by Direction and Percentage of Time<br />

9AM N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW Total<br />

Calm 7.40<br />

1–5 km/h 0.29 0.13 0.22 0.16 0.24 0.09 0.18 0.20 0.35 0.31 0.60 1.01 0.84 0.51 0.11 0.20 5.46<br />

6–10 km/h 0.90 0.79 0.77 0.57 0.86 0.46 0.60 0.64 0.95 1.25 1.78 2.86 3.87 1.54 0.59 0.59 19.00<br />

11–15 km/h 1.61 1.26 0.88 0.55 1.14 0.99 1.04 0.92 1.61 1.63 0.93 1.76 2.69 0.75 0.64 0.84 19.26<br />

16–20 km/h 1.28 0.84 0.66 0.37 0.82 0.70 0.79 0.86 1.45 0.90 0.77 0.79 1.83 0.57 0.49 0.82 13.95<br />

21–25 km/h 1.59 0.93 0.59 0.38 1.04 1.21 1.83 1.48 1.61 1.21 1.06 1.45 1.74 0.53 0.79 1.15 18.62<br />

26–30 km/h 0.97 0.40 0.07 0.16 0.55 0.86 1.41 1.06 1.36 0.57 0.49 0.71 0.81 0.42 0.51 0.66 11.03<br />

31–35 km/h 0.20 0.05 0.09 0.16 0.46 0.22 0.22 0.22 0.16 0.24 0.27 0.20 0.18 0.42 3.12<br />

36–40 km/h 0.09 0.02 0.02 0.02 0.04 0.15 0.11 0.16 0.20 0.18 0.15 0.16 0.20 0.22 0.09 1.81<br />

>40 km/h 0.02 0.02 0.02 0.05 0.02 0.09 0.02 0.02 0.02 0.02 0.02 0.04 0.35<br />

TOTAL 6.96 4.38 3.19 2.27 4.76 4.53 6.49 5.55 7.73 6.38 6.01 8.98 12.24 4.75 3.56 4.82 100.00<br />

3PM N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW Total<br />

Calm 0.11<br />

1–5 km/h 0.02 0.02 0.02 0.04 0.02 0.02 0.02 0.02 0.02 0.02 0.20<br />

6–10 km/h 0.58 0.57 0.29 0.24 0.31 0.15 0.22 0.15 0.15 0.18 0.18 0.20 0.24 0.07 0.20 0.22 3.95<br />

11–15 km/h 2.17 1.75 1.72 1.52 1.95 0.55 0.91 0.71 1.11 0.68 0.53 0.24 0.62 0.46 0.60 1.19 16.71<br />

16–20 km/h 1.79 1.44 1.35 1.61 2.19 0.68 1.53 1.11 1.10 0.79 0.58 0.37 0.84 0.69 0.75 0.93 17.75<br />

21–25 km/h 1.94 1.50 0.91 0.73 1.48 0.58 2.94 3.21 2.45 2.08 1.41 0.99 1.30 1.75 1.55 1.26 26.08<br />

26–30 km/h 1.17 0.31 0.18 0.13 0.37 0.29 2.63 3.34 1.81 2.45 1.42 0.75 1.44 1.68 1.30 1.02 20.29<br />

31–35 km/h 0.35 0.05 0.07 0.02 0.02 0.86 1.28 0.58 0.89 0.69 0.47 0.82 0.84 0.55 0.27 7.78<br />

36–40 km/h 0.20 0.04 0.02 0.04 0.37 0.55 0.37 0.69 0.68 0.46 0.71 0.64 0.37 0.16 5.28<br />

>40 km/h 0.04 0.04 0.16 0.09 0.18 0.16 0.33 0.29 0.44 0.11 1.84<br />

TOTAL 8.26 5.68 4.55 4.24 6.39 2.26 9.52 10.52 7.67 7.95 5.68 3.82 6.28 6.58 5.42 5.08<br />

Bureau of Meteorology October 2009 via climate.sa@bom.gov.au<br />

100.00<br />

Runway Capacity & Demand<br />

Regional 50 seat airliners, predicted to operate into <strong>Kingscote</strong> during the <strong>Master</strong> <strong>Plan</strong> time<br />

frame, are likely to confine landings and take offs to the main runway 01/19, as the other<br />

runways are unsealed and are of insufficient length.<br />

The capacity of a single runway free of taxying and air traffic restrictions, is approximately<br />

200,000 movements per annum. US Federal Aviation Administration Advisory Circular AC<br />

150/5060-5. Previously the RPT traffic peaked at around 6,000 yearly movements using<br />

Saab 340 (34 seats) and Cessna 404 (9 seats) aircraft. The 2024/25 Optimistic Forecast of<br />

156,158 annual passengers will require less than 5000 movements by a 50 seat aircraft at<br />

70% occupancy. Therefore a single main runway will easily cope with the optimistic forecast<br />

in RPT traffic.<br />

General aviation aircraft accounted for nearly 4000 annual movements in 2008/09. AVDATA<br />

<strong>Airport</strong> Usage Analysis. No data is available of predicted general aviation traffic. The BTRE<br />

web site provides a breakdown of the general aviation hours flown nationally from 1994-<br />

2007. The data shows an annual growth rate of just 0.52% in that period. Bureau of<br />

Infrastructure, Transport and Regional Economics via http://www.bitre.gov.au/info 2008.<br />

Assuming <strong>Kingscote</strong> performs far better than the national average, with a growth of 5% per<br />

annum for master planning purposes, around 8000 annual general aviation movements can<br />

be generated by 2024/25.<br />

The optimistic combined total of Regular Public Transport and general aviation movements<br />

at 13,000 per annum remains well below the airport capacity. The numbers show it is<br />

unlikely there will be aircraft delays due to lack of airfield capacity within and well beyond the<br />

master plan time frame.<br />

7


KINGSCOTE AIRPORT MASTER PLAN<br />

Taxiways<br />

Provision of Additional Taxiways<br />

International planning guidelines show parallel taxiway facilities are needed when aircraft<br />

operations reach 30,000 – 60,000 movements per annum. ICAO <strong>Airport</strong> <strong>Plan</strong>ning Manual<br />

Part 1 While the <strong>Kingscote</strong> numbers are well below the 30,000 threshold, some conflict may<br />

occur if movements increase and aircraft predominantly use the main runway for takeoff,<br />

landings and backtracking.<br />

Departing aircraft enter runway 01/19 at the northern end via a short sealed taxiway. For<br />

takeoffs to the north the aircraft must backtrack the full length of the runway to reach the<br />

southern end. Delays can occur due to the time the back-tracking aircraft occupies the<br />

runway. A similar situation occurs when incoming aircraft land from the north and run<br />

through to the southern end of runway 01/19. These aircraft then perform a 180 degree turn<br />

and backtrack to the northern end to the taxiway exit point.<br />

An alternative is to transit via the 15/33 runway which gives similar taxying distances and<br />

brings aircraft into the western side of the apron. This is an ideal arrangement as it promotes<br />

flow across the apron rather that having single entry / exit which can add to congestion. The<br />

downside is that many aircraft will avoid using the unsealed 15/33 runway and the western<br />

taxiway (Taxiway B) due to potential stone chip damage. Sealing of runway 15/33 and<br />

Taxiway B would overcome the problem and provide the airport with an effective parallel<br />

taxiway, overcoming the need for aircraft to back track on the main runway.<br />

Other delays can occur to aircraft on approach with ground based aircraft backtrack to the<br />

northern end of runway 01/19. Extending the runway further to the north will increase the<br />

time of backtracking. Provision of a short section of parallel taxiway from the sealed taxiway<br />

to the northern end of the runway would enhance the airport layout and has therefore been<br />

included in this <strong>Master</strong> <strong>Plan</strong>.<br />

General aviation aircraft will use all runways and taxiways available provided the pilot<br />

accepts operations off unsealed surfaces. Sealing of runway 15/33 is expected to promote<br />

increased use of the facility. Access to the general aviation parking areas on the western end<br />

of the apron can be from either Taxiway Bravo which connects from the northern end of<br />

runway 15/33 or via the RPT apron and Taxiway A which connects to the northern end of<br />

Runway 01/19. The busy area for these aircraft is likely the section of taxiway adjoining the<br />

edge of the general aviation apron. By making the area wide enough to incorporate possible<br />

passing lanes, congestion of general aviation traffic can be avoided.<br />

Sealing of Taxiway Bravo would compliment the sealing of runway 15/33 to provide a<br />

bituminised taxying option for aircraft operating between the apron and the southern end of<br />

runway 01/19.<br />

A possible long term taxiway layout is shown at Figure 1.<br />

8


KINGSCOTE AIRPORT MASTER PLAN<br />

Figure 1 Overall Layout Showing Runway Taxiway and <strong>Apr</strong>on Development<br />

9


KINGSCOTE AIRPORT MASTER PLAN<br />

<strong>Apr</strong>ons<br />

RPT Parking<br />

The existing apron has space provision for:<br />

− 1 x BAe 146 (eastern apron extension);<br />

− 3 x Saab and 1 x Dash8/Saab 1 x RFDS PC 12 (main apron); and,<br />

− 3 x Cessna 402 or equivalent (western apron extension).<br />

The overall length of the apron is approx 300m with a depth of 57m from the edge of the<br />

passenger walkway to the centreline of the apron edge taxiway. Increasing the depth by up<br />

10m would allow unrestricted parking and taxiway access for aircraft with wingspans of 30m.<br />

An additional 6m extension would allow unrestricted taxiway access and parking for Code<br />

3C 3 aircraft including the Q400 and EMB 170 etc.<br />

Figure 2 overleaf illustrates how the existing apron can be extended to the east, west and<br />

south to a size well in excess of the predicted parking demand.<br />

General Aviation Parking<br />

A sealed area for general aviation parking is provided at the western end of the existing RPT<br />

apron. A grassed area provides additional space further west of the seal. It is suggested the<br />

entire area from the western end of the apron be set aside for future general aviation use as<br />

shown on Figure 2. Areas east of the apron could be utilised to accommodate future<br />

demands for long term RPT and corporate jet parking.<br />

Refuelling <strong>Apr</strong>on<br />

Currently aircraft refuelling is not available to aircraft operators at <strong>Kingscote</strong> <strong>Airport</strong>. A gravel<br />

pavement to the south of the general aviation apron has been used on occasion for storage<br />

of drum and above ground tank fuel for private and emergency use; for example during bush<br />

fires used to replenish fire bomber aircraft. The current location fits in well with long-term<br />

expansion of the adjacent apron facilities and has therefore been retained in this <strong>Master</strong><br />

<strong>Plan</strong>. Note the refuelling of RPT aircraft, if ever required, would take place on the RPT apron<br />

as discussed under Aircraft Refuelling.<br />

Helicopter Parking<br />

There is no regular helicopter flying out of <strong>Kingscote</strong>. Growth in either the tourism or mining<br />

sectors may see some increase in activity. Helicopter parking is provided south of the apron<br />

(a) near the illuminated wind indicator and (b) east of the fuel storage area. Within the time<br />

frame of the master plan there is no indication for additional space beyond the area already<br />

provided. Refer Figure 2 overleaf<br />

3<br />

The <strong>Airport</strong> Reference Code is described by International Civil Aviation Organisation<br />

(ICAO) as a system that relates the characteristics of <strong>Airport</strong>s to specifications that are<br />

suitable for the aeroplanes that are intended to operate from these <strong>Airport</strong>s. The code<br />

number relates to the aeroplane reference field length, the code letter is based on the<br />

aeroplane wingspan and outer main gear wheel span. Note that determination of the<br />

aeroplane reference field length is solely for the selection of the code number and is not<br />

intended to influence the actual runway length provided.<br />

10


KINGSCOTE AIRPORT MASTER PLAN<br />

Figure 2 Long Term Development of the Terminal Area and <strong>Apr</strong>on<br />

11


KINGSCOTE AIRPORT MASTER PLAN<br />

Terminal Area <strong>Plan</strong>ning<br />

Passenger Terminal<br />

The existing terminal has a floor space of approximately 300 square metres and features two<br />

check-in areas, a combined departure lounge / arrivals hall, toilet facilities, hire car booths,<br />

airline office space and external baggage makeup and reclaim areas.<br />

Need for Expansion<br />

The <strong>Kingscote</strong> <strong>Airport</strong> Strategic <strong>Plan</strong> estimates passenger movements to range from 84,000<br />

to 156,000 per annum by 2023/24 (these are totals of the arrivals and departures). The<br />

passenger numbers equate to between 3 and 6 flights daily of a 50 seat aircraft with a 70%<br />

seat occupancy.<br />

In broad terms the aircraft would require a terminal area of approximately 530 square metres<br />

increasing to 880 square metres for two 50 seater aircraft arriving simultaneously. Table 3<br />

provides for a breakdown of how the broad area estimates were determined.<br />

Table 3 Terminal Area Estimates<br />

Design Aircraft 1 or 2 x 50 seat regional airliner Area M2 Area M2<br />

No of passenger based on 80% load factor 40 Pax 80 Pax<br />

Baggage Check in and ticketing<br />

40% of pax @2.0m 2 16 32<br />

allowance for .5 friend/ passenger @1.5m 2 12 24<br />

+ 10% circulation 3 6<br />

Check in Counters allow 2 or 3 @ 2.5 wide by 4m 30 45<br />

Baggage make up<br />

Security baggage X ray pax scan<br />

Include operator allow area 4m x 10m 40 40<br />

Security office space allow 12m 2 12 12<br />

Secured Gate Lounge<br />

100% of pax @1.5m 2 60 120<br />

allowance for 0.3 friend /passenger @1m 2 18 36<br />

add 20% circulation 31 31<br />

Baggage Reclaim<br />

baggage breakdown passengers @1.2m 2 48 96<br />

allowance for 0.3 friend /passenger @1m 2 12 24<br />

add 20% circulation 12 24<br />

Arrivals Hall<br />

pax @1.25m 2 50 100<br />

allowance for .3 friend /passenger @1m 2 12 24<br />

add 20% circulation 15 25<br />

Miscellaneous<br />

Concessions 30 50<br />

Airline offices 30 60<br />

Toilets 40 50<br />

<strong>Plan</strong>t allow 40m2 30 40<br />

Entrance airlock 30 40<br />

TOTAL AREA (internal) 531 879<br />

12


KINGSCOTE AIRPORT MASTER PLAN<br />

The existing terminal would require expansion and rearrangement to cater for increased<br />

passenger loads. The present layout can become congested even with Saab operations.<br />

For example the existing check-in desks are at opposite ends of terminal, designed for a 2-<br />

airline operation. The current schedules consist of a single airline operation, so one of the<br />

desks remains vacant. Only the eastern check in is use; it can become overcrowded due to<br />

(a) a lack of building depth for queuing, (b) conflict between the check-in queues and access<br />

to the public toilets (c) conflict between the check-in queues and the baggage reclaim.<br />

Security Screening<br />

There are no dedicated facilities for security checking of passenger or baggage at <strong>Kingscote</strong><br />

<strong>Airport</strong>. Long term planning will need to include allowance for screening passengers and<br />

carry-on baggage, as well as having provision for checked bag screening.<br />

The requirement to introduce increased security measures rests with the Office of Transport<br />

Security which is part of the Department of Infrastructure, Transport, Regional Development<br />

and Local Government. At the time of writing, only jet RPT services are subject to passenger<br />

and baggage screening. That may change with the release of the Aviation White Paper that<br />

is expected to be released early <strong>2010</strong>. The White Paper may recommend introducing<br />

security controls based on aircraft size rather than the method of propulsion.<br />

Expansion Options<br />

A previous study by Woodhead Australia produced plans for a revised terminal expanded to<br />

680 square metres and included improvements comprising;<br />

− new check in and departure lounge at the western end of the building;<br />

− new airline office space and baggage make up area at the western end;<br />

− new café souvenir shop and food preparation area in the centre of the building; and ,<br />

− new arrivals lounge and under-cover baggage retrieval at the eastern end.<br />

The plans did not include space for passenger or baggage screening, although with some<br />

modifications and area increase, the design could be readily modified to include provision for<br />

security checking if required by change in regulations.<br />

The Woodhead Australia plans show the existing terminal can be expanded twice the current<br />

area, with additional space available for further extensions if needed. Figure 2 shows<br />

adequate space is available for very long term expansion that would provide sufficient<br />

terminal sizing even for jet aircraft. A building depth of 30m and a length of well over 100m is<br />

available for future development if required.<br />

Similarly, sufficient space is available to meet supporting landside infrastructure including<br />

and upgraded road and carpark network.<br />

Roads Car Parks Bus Parking etc<br />

Figure 2 shows the areas available for vehicle and bus parking to cater for optimistic growth<br />

in terminal use. Parking will comprise space for rental car, private vehicles, long term<br />

parking. Bus parking can be accommodated separately in a dedicated area on the either<br />

side of the terminal pending demand and future terminal layouts.<br />

Stakeholder input identified pedestrian hazards due to traffic speeds past the terminal.<br />

Future terminal development planning will need to include a road network that provides<br />

improved pedestrian safety while catering for increasing growth. This may include road<br />

realignment and provision of calming devices to slow vehicle operating in front of the<br />

terminal.<br />

13


KINGSCOTE AIRPORT MASTER PLAN<br />

Other Aviation Facilities<br />

Aircraft Hangar<br />

The existing hangar at <strong>Kingscote</strong> is for low-level usage is used for aircraft storage rather than<br />

maintenance workshop facilities. For long term planning light aircraft hangars should be<br />

linked to the western end of the apron as shown on Figure 2.<br />

To economise on available space and minimise supporting infrastructure, small hangars say<br />

less than 225m 2 , should be grouped into blocks, with each block capable of supporting 6-10<br />

aircraft; as opposed to having 10 small individual buildings.<br />

If an unexpected demand for general aviation parking occurs additional apron could be<br />

developed south of the apron into the grassed area set aside for helicopter parking. The<br />

helicopter area consists of a grassed area marked with cones which could easily be<br />

relocated further east if required<br />

Aircraft Refuelling<br />

There are no current facilities for refuelling RPT aircraft as these traditionally fly between<br />

Adelaide and <strong>Kingscote</strong>. The short stage length makes it cheaper to refuel on the mainland.<br />

Should longer RPT flights be introduced, such as to Melbourne or Sydney there may be<br />

requirement for fuel. For an apron with free-moving parking positions; as opposed to fixed<br />

aerobridge positions, the use of mobile tankers offers the most adaptable method.<br />

Fixed fuel hydrants are expensive to install and often end up being in an incorrect location<br />

when a change to the aircraft model operating occurs. A tank connected to a bowser and<br />

hose reel, while quite common, can only reach a parking position within 30m of the bowser<br />

due to limitations on the hose reel length. This places the bowser in close proximity to the<br />

terminal which is detrimental to safety as well as aesthetics. A remote location is of little use<br />

to aircraft parking in front of the terminal. For this reason a remote storage facility with<br />

mobile tankers is suggested.<br />

The RPT fuel storage and tanker accommodation could be located in the precinct of the<br />

existing general aviation fuel storage located 180m off the southwest corner of the apron.<br />

The facility is suitably located clear of existing and future areas needed for aircraft parking<br />

and has therefore been retained in this <strong>Master</strong> <strong>Plan</strong>. Being located airside it allows refuelling<br />

tankers to access aircraft without the need for passing through security. External bridging<br />

tanker deliveries, operating on an infrequent basis, could be escorted airside as required.<br />

Navigation Aids<br />

<strong>Kingscote</strong> is currently equipped with a non-directional beacon (NDB) located in the northwest<br />

part of the airport. The NDB is owned and operated by AirServices Australia. The range of<br />

the NDB is listed as 35NM (60NM over water). NDBs are old equipment and were previously<br />

mentioned in terms of eventual replacement, possibly with satellite based technology.<br />

However there have been no recent announcements from AirServices Australia on this issue,<br />

so it is presumed the NDB will remain on the present site for the life of the equipment.<br />

A non-precision GPS approach is available for instrument landings from the north onto<br />

runway 19. Provision of a GPS approach to the main runway from the south is a possible<br />

future option. It does not require any ground-based installations, and terrain clearance is<br />

already protected to the non-precision approach standard.<br />

14


KINGSCOTE AIRPORT MASTER PLAN<br />

The <strong>Master</strong> <strong>Plan</strong> concludes that under current regulations, the increase in size of RPT<br />

aircraft from 34 to 50 passenger seats, or the introduction of jet aircraft does not introduce a<br />

requirement for new navigational aids.<br />

<strong>Airport</strong> Lighting<br />

<strong>Kingscote</strong> is equipped with low intensity runway edge lights. Pilot slope guidance on<br />

approach is provided to both ends of the main runway with an Abbreviated “T” Visual<br />

Approach Slope Indicator System A-TVASIS. There is no additional slope guidance lighting<br />

needed to allow introduction of larger 50 seat or jet aircraft. <strong>Council</strong> may need to eventually<br />

replace the A-TVASIS with a Precision Approach Path Indicator (PAPI) the modern<br />

equivalent of the VASIS should parts for the former become scarce and maintenance<br />

becomes overly expensive.<br />

The remainder of the airport lighting comprising low-intensity, runway and taxiway lights, has<br />

recently been upgraded to the current standards. It is unlikely there will be a demand to<br />

upgrade the current lighting within the <strong>Master</strong> <strong>Plan</strong> time frame, other than provision for<br />

additional flood lighting to compliment any future expansion of the apron areas used at night.<br />

Rescue & Fire Fighting<br />

Fire Fighting Services are required when an aerodrome which has more than 350,000<br />

passengers in a year MOS Part 139H-Standards Applicable to the Provision of Aerodrome<br />

Rescue and Fire Fighting Services. The optimistic growth forecast shows passenger<br />

numbers to be around 156,000 in 2024/25. Dedicated on airport fire fighting facilities are<br />

therefore not required within the <strong>Master</strong> <strong>Plan</strong> time-frame.<br />

Emergency Facilities RFDS/Police/CFS<br />

Sufficient space airside will be set aside for allocation of an open area for bush fire response<br />

teams. Facilities include replenishment water tanks and fuel storage for fire fighting.<br />

Possible locations can be developed on any open grassland areas that are clear of<br />

movement areas with access to water supply and the external road network for emergency<br />

service access.<br />

Meteorological Facilities<br />

A field weather station comprising anemometer, Stevenson screen, ceilometer (cloud height<br />

detector), visibility metre and rain gauge, is located on airside south of the apron. The<br />

location provides ready access for observers from the building area. The site remains clear<br />

of likely future use by aircraft and is therefore suitable for long term use. Should the Bureau<br />

of Meteorology require larger building installations a remote location possibly to the east of<br />

runway 01/19 would be appropriate.<br />

<strong>Airport</strong> Maintenance<br />

<strong>Airport</strong> maintenance facilities vehicles equipment and materials are located north of the area<br />

set aside for future terminal, roads and car parks. The facilities can remain without<br />

interference to development although for long term planning, new permanent facilities should<br />

be located clear of the terminal and carpark precinct. A possible site is in the north western<br />

sector of the airport.<br />

15


KINGSCOTE AIRPORT MASTER PLAN<br />

Non aviation Facilities<br />

Commercial Sites<br />

Stakeholder inputs did not identify significant development options other than rental car<br />

facilities see above and a possible tourism information centre.<br />

It is suggested the entire sector of land north of runway 06/24 and within the northern extent<br />

of runways 15/33 and 01/19 should give priority to future use associated with aircraft and<br />

passenger handling and supporting infrastructure. Future commercial facilities located within<br />

the area marked in pink on Figure 2 should be placed clear of possible areas for terminal<br />

road and carpark development.<br />

Long term non-aviation development could take place as shown in Figure 3 in the large<br />

areas to the western side of runway 15/33 and clear of the 06/24 approach and takeoff area,<br />

and clear of the NDB navaid. Additional development east of runway 01/19, again clear of<br />

the 06/24 approach and takeoff area is possible without interference to the long term aviation<br />

use of the airport as shown in Figure 3.<br />

Figure 3 Identification of Potential Commercial Sites<br />

16


KINGSCOTE AIRPORT MASTER PLAN<br />

Surrounding Area <strong>Plan</strong>ning<br />

Aircraft flight paths into <strong>Kingscote</strong> will either follow straight into the northern end of runway<br />

01/19 for aircraft arriving from Adelaide or follow a left hand circuit to the southern end. The<br />

unsealed and shorter cross runways will be used less frequently and generally only by<br />

smaller aircraft less than 5700kg. Aircraft flying crosswind, downwind and base legs will<br />

generally be operating within a 2.5 km radius from the runway end in use, or within a 5km<br />

radius in the case of the larger RPT aircraft.<br />

Protection of Airspace<br />

Height control of objects and structures within the vicinity of the airport is needed to protect<br />

airspace from obstacles that would otherwise make use of the airport unviable for aircraft<br />

operations. A set of plane surfaces, the Obstacle Limitation Surface (OLS) defines the<br />

allowable height of objects and structures within the approach-take off, side transition and<br />

circling areas. The OLS for the various aircraft types and flying condition (i.e. visual,<br />

instrument, day and night) are defined in the CASA Manual of Standards Part 139-<br />

Aerodromes.<br />

The existing OLS is protected for Code 3 aircraft operating non-precision approaches into the<br />

main runway. Code 3 aircraft includes the turbo prop regional airliners ATR 42/75, Saab<br />

340, Q400 etc and regional jets such as the BAe 146 and Embraer 170. Note the EMB 190<br />

which is a stretched version of the E170 is listed as by CASA Code 4 as are the Airbus A320<br />

and Boeing B737 models.<br />

For Code 3 aircraft the approach and take areas extends 15km out from the end of the<br />

runway end (2500m for Code 2) rising at a gradient of 2% from the runway ends. A<br />

horizontal circling area extends on a radius of 4000m from the main runway ends at a height<br />

of 45m above the aerodrome. The limit of the horizontal surface connects to a conical<br />

surface rising at a rate pf 5% for a further 75m of elevation. These plane surfaces form the<br />

basis of the <strong>Kingscote</strong> <strong>Airport</strong> OLS.<br />

Subject to adjustment for an increase in the length of the main runway, the existing OLS for<br />

the main runway meets the design parameters for the critical aircraft. It is suggested a<br />

planning OLS be prepared to include the extended runway lengths needed for the critical<br />

aircraft as identified in this <strong>Master</strong> <strong>Plan</strong>.<br />

A building height map is incorporated into the <strong>Kangaroo</strong> <strong>Island</strong> Development <strong>Plan</strong> May 2009,<br />

to assist in protecting the airport against possible airspace intrusion. Minor adjustments to<br />

the main runway length are unlikely to effect the Development <strong>Plan</strong> Maps although this<br />

aspect needs to be confirmed.<br />

The 15/33 and 06/24 runways are protected to Code 2 non-precision approach standard.<br />

While the wind data shows larger Code 3 aircraft do not require additional runway usability,<br />

upgrading runway 15/33 to Code 3 standard for daytime use is simply a matter of widening<br />

the approach and take off inner edge from 80 to 90m. This would legitimise the use of this<br />

runway for Saab 340 and equivalent aircraft and give some increased flexibility to the airport<br />

layout. It would also make sense as the 15/33 runway is recommended for sealing in the<br />

long term, to provide additional taxiway access between the apron and the southern end of<br />

the main runway. The runway, already 30m wide, could easily be transformed into a Code 3<br />

facility.<br />

17


KINGSCOTE AIRPORT MASTER PLAN<br />

Aircraft Noise<br />

The Australian Noise Exposure Forecast (ANEF) system is used to determine potential<br />

aircraft noise around Australian airports. The ANEF system uses the sum of predicted<br />

aircraft noise events over an average day to determine the forecast noise exposure level.<br />

For airports with low traffic volumes and no jet activity, noise footprints generated by the<br />

ANEF model often barely go beyond the airport boundary. This can give a perception that<br />

aircraft noise does not occur in areas where residents do in fact experience aircraft noise<br />

albeit on an infrequent basis. An alternative approach is to compare the frequency and<br />

extent of individual noise events to the Building Site Acceptability provided in AS 2021<br />

Acoustics - Aircraft Noise Intrusion - Building Siting and Construction as shown in the<br />

following Table.<br />

Table 4 Building Site Acceptability Based On Aircraft Noise Levels<br />

Aircraft noise level expected at building site, dB(A)<br />

20 or less flights per day Greater than 20 flights per day<br />

Building site Acceptable Conditionally<br />

acceptable<br />

Unacceptable Acceptable<br />

Acceptable<br />

Conditionally<br />

Unacceptable<br />

House, home<br />

unit, flat, 90 85<br />

caravan park<br />

Hotel, motel,<br />

Hostel,<br />

95 90<br />

Public Buildings<br />

Commercial<br />

building<br />

< 90 90 to 100 > 100 90<br />

Light Industrial < 95 95 to 105 > 105 100<br />

Heavy Industrial No limit No limit No limit No limit No limit No limit<br />

For the purpose of this <strong>Master</strong> <strong>Plan</strong> the following assumptions have been made:<br />

− the maximum size aircraft regularly servicing <strong>Kingscote</strong> within a 15 year time frame will<br />

be F50/Q400;<br />

− the aircraft arrivals and departures will follow the extended runway centreline for duration<br />

of noticeable noise levels; and,<br />

− traffic numbers using the cross runways are so low that aircraft noise is unlikely to impact<br />

on the community which remains well clear of the flight paths for this runway.<br />

Australian Standard AS 2021 Acoustics - Aircraft noise intrusion - Building Siting and<br />

Construction provides noise level tables dB(A) for aircraft representative of the design aircraft<br />

i.e. the Saab / F50 / Dash 8 aircraft. A plot of the single event contours is shown on the<br />

following plan at Figure 4. Note the Dash 8- Q400 is rated quieter than the aircraft listed in<br />

AS 2021 so the noise level shown overleaf can be considered a worst case scenario.<br />

The plan shows the extent of individual noise contours of the larger aircraft (expected to be<br />

less than 20 flights per day) do not extend to the population centres. Similarly general<br />

aviation aircraft operations even if exceeding 20 flights per day, remain clear of population<br />

centres. In order to avoid future noise problems it is recommended that noise sensitive<br />

development such as residential areas be kept clear of the 80 dB(A) contours shown on the<br />

plan. Where a proponent wishes to construct individual dwellings within the 80 dB(A) zone<br />

consideration to the use of noise control features in the design as per the recommendations<br />

contained AS 2021 is suggested.<br />

18


KINGSCOTE AIRPORT MASTER PLAN<br />

Figure 4 Single Event Noise Contours for Saab 340/F50/Dash8<br />

19


KINGSCOTE AIRPORT MASTER PLAN<br />

Environmental Considerations<br />

Off-<strong>Airport</strong> Land Use<br />

Areas close to the airport need to be managed to ensure hazards to aircraft are not created<br />

through poor planning or management practices. Developments such as landfills, feedlots,<br />

sewage lagoons, and some agricultural activities can attract large numbers of birds so<br />

appropriate planning controls and management practices are needed.<br />

There is also a need to prevent obstacle intrusion into airspace not only through the control<br />

of man made structures but also the control of trees especially in areas close to the runway<br />

ends. Aircraft approach, takeoff and side transitional areas are continually for monitored tree<br />

growth, which if left uncontrolled would increase the risks of flying and reduce aircraft<br />

payloads. In normal circumstances regular trimming takes place without any significant loss.<br />

In the period beyond the master plan time frame, should runway lengthening be required,<br />

some tree removal will be necessary.<br />

At the northern end of the main runway, the takeoff surface is already protected for the<br />

ultimate runway end through the use of an extended clearway, so continuation of the existing<br />

tree trimming programme will also meet long term requirements.<br />

At the southern end, the takeoff fight path is over open farm land with isolated native trees. It<br />

is unlikely land acquisition will be needed as any foreseeable runway extension will remain<br />

within the existing aerodrome boundary. A runway extension would necessitate only the<br />

removal / trimming of a limited number of trees. The effect could be readily offset by<br />

replacement planting in areas clear of future flight paths<br />

Protection of flora and fauna<br />

The airport has substantial tracts of land containing native plants, some which are rare or<br />

endangered species and are subsequently monitored by the Department of Environment and<br />

Heritage. The areas are shown overleaf on <strong>Plan</strong> on Figure 5 and are clear of the parts of<br />

the runway required for future aviation development.<br />

Heritage<br />

There are no known areas on the airport containing items of cultural or heritage significance.<br />

Stormwater discharge<br />

Stormwater runoff from buildings and aprons travels via open unlined channels and<br />

underground pipes to discharge points at the aerodrome perimeter. From here the water<br />

flows via creeks and dams and eventually to open sea east of the aerodrome.<br />

Increased stormwater runoff from building and pavement development within the master plan<br />

time frame is unlikely to generate sufficient change to warrant installation of new drainage<br />

systems. The most likely outcome would be a need to widen some of the existing channels<br />

where necessary to increase short term runoff detention.<br />

The absence of industrial activities suggests the problem of pollutants entering the system is<br />

minimal. On exception would be if refuelling is introduced on areas that can flow into<br />

stormwater drains. In these cases controls such as interceptor pits, plate separators etc can<br />

be incorporated into facility designs in order to minimise the risk of pollution.<br />

Land acquisition<br />

This <strong>Master</strong> <strong>Plan</strong> does not foresee a need to acquire additional airport land within the next 15<br />

years.<br />

20


KINGSCOTE AIRPORT MASTER PLAN<br />

Figure 5 Stormwater Drainage and Flora Areas<br />

21


KINGSCOTE AIRPORT MASTER PLAN<br />

Implementation<br />

The following lists to possible future <strong>Airport</strong> development to take place within and beyond the<br />

15 year master planning horizon.<br />

Table 5 List of Future Development Items and Associated Triggers<br />

Development<br />

Item<br />

Terminal expansion<br />

RPT apron and<br />

taxiway development<br />

Expanded access<br />

road and carpark<br />

facilities.<br />

Engineering<br />

services:<br />

Sealed general<br />

aviation apron<br />

Aviation fuel storage<br />

facility<br />

Helicopter Parking<br />

Hangar development<br />

Commercial<br />

development<br />

Sealing taxiway<br />

Bravo<br />

Sealed taxiway to<br />

northern end of<br />

runway 01/19<br />

Extension to runway<br />

01/19<br />

Sealing 15/33<br />

runway<br />

Freight facilities<br />

Strengthening of<br />

culverts beneath<br />

aircraft pavements<br />

Land acquisition for<br />

runway extension<br />

Possible Triggers / Drivers<br />

Existing terminal does not meet either:<br />

− space requirements of increased passenger numbers from<br />

introduction of larger aircraft;<br />

− passenger demand for food an beverage facilities; and,<br />

− compliance with changed security regulation and / or<br />

disabled access etc.<br />

Part of infrastructure required for new passenger terminal<br />

development.<br />

New demands for bus parking from expanded tourism market<br />

Supporting infrastructure required for expanded passenger<br />

terminal development.<br />

Supporting infrastructure needed for expansion of the passenger<br />

terminal.<br />

Increased use results in unacceptable level of deterioration to the<br />

grassed surface and or a need to provide all weather general<br />

aviation pavements.<br />

Mobile tankers needed to service expanded RPT operations.<br />

General aviation demand for AVTUR and AVGAS fuels via self<br />

service card operated system.<br />

Existing unsealed area unable to cope with increasing demand.<br />

Sealed pavement required.<br />

Market demand for additional undercover storage for weather<br />

protection.<br />

Market demand.<br />

Feasible use of currently space that is clear of known aviation<br />

requirement<br />

Increased demand from general aviation development. Also<br />

seen as complimentary development to sealing of runway 15/33<br />

Increased congestion due to back tracking to the northern end<br />

and / or extension to the northern end of runway 01/19.<br />

Introduction of larger critical aircraft than predicted, or longer<br />

stage lengths i.e. direct flights to interstate ports.<br />

Congestion on runway due to increased traffic. Need for<br />

additional taxiway link when aircraft movements exceed 30,000<br />

per annum.<br />

Expanded marketing of island products for example aquaculture<br />

or agriculture product requires rapid deliver by air.<br />

Introduction of heavier wheel loads above those applied by the<br />

predicted critical aircraft.<br />

Introduction of jet RPT services<br />

Possible<br />

Timeframe<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

0-15 years<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

5 years<br />

plus<br />

15 years<br />

plus<br />

15 years<br />

plus<br />

15 years<br />

plus<br />

15 years<br />

plus<br />

15 years<br />

plus<br />

15 years<br />

plus<br />

22


KINGSCOTE AIRPORT MASTER PLAN<br />

Appendix A Supporting Data and References<br />

A1<br />

Indicative requirements for Q400 aircraft received via email<br />

from Mario Cipollone, Manager Flight Technical, Qantaslink<br />

to Peter Francis<br />

date 5 October 2009<br />

Email advice from Mario Cipollone, Manager Flight Technical, Qantaslink confirmed a runway<br />

length of 1550m would be ideal for the Dash 8 Q400. A 60m clearway should be provided with a<br />

takeoff clear gradient of 1.9% over obstacles.<br />

Additional information<br />

Sealed Runway Width<br />

30m<br />

Runway Strip Width<br />

150m ‐ 90m graded.<br />

Taxiway Width<br />

18m sealed plus low strength taxiway shoulders.<br />

Pavement Classification Number Flexible C (medium) strength sub‐grade : 18.5<br />

Tyre Pressure Rating<br />

973 kPa<br />

Runway Slope