KINGSCOTE AIRPORT MASTER PLAN<br />
Implementation<br />
The following lists to possible future <strong>Airport</strong> development to take place within and beyond the<br />
15 year master planning horizon.<br />
Table 5 List of Future Development Items and Associated Triggers<br />
Development<br />
Item<br />
Terminal expansion<br />
RPT apron and<br />
taxiway development<br />
Expanded access<br />
road and carpark<br />
facilities.<br />
Engineering<br />
services:<br />
Sealed general<br />
aviation apron<br />
Aviation fuel storage<br />
facility<br />
Helicopter Parking<br />
Hangar development<br />
Commercial<br />
development<br />
Sealing taxiway<br />
Bravo<br />
Sealed taxiway to<br />
northern end of<br />
runway 01/19<br />
Extension to runway<br />
01/19<br />
Sealing 15/33<br />
runway<br />
Freight facilities<br />
Strengthening of<br />
culverts beneath<br />
aircraft pavements<br />
Land acquisition for<br />
runway extension<br />
Possible Triggers / Drivers<br />
Existing terminal does not meet either:<br />
− space requirements of increased passenger numbers from<br />
introduction of larger aircraft;<br />
− passenger demand for food an beverage facilities; and,<br />
− compliance with changed security regulation and / or<br />
disabled access etc.<br />
Part of infrastructure required for new passenger terminal<br />
development.<br />
New demands for bus parking from expanded tourism market<br />
Supporting infrastructure required for expanded passenger<br />
terminal development.<br />
Supporting infrastructure needed for expansion of the passenger<br />
terminal.<br />
Increased use results in unacceptable level of deterioration to the<br />
grassed surface and or a need to provide all weather general<br />
aviation pavements.<br />
Mobile tankers needed to service expanded RPT operations.<br />
General aviation demand for AVTUR and AVGAS fuels via self<br />
service card operated system.<br />
Existing unsealed area unable to cope with increasing demand.<br />
Sealed pavement required.<br />
Market demand for additional undercover storage for weather<br />
protection.<br />
Market demand.<br />
Feasible use of currently space that is clear of known aviation<br />
requirement<br />
Increased demand from general aviation development. Also<br />
seen as complimentary development to sealing of runway 15/33<br />
Increased congestion due to back tracking to the northern end<br />
and / or extension to the northern end of runway 01/19.<br />
Introduction of larger critical aircraft than predicted, or longer<br />
stage lengths i.e. direct flights to interstate ports.<br />
Congestion on runway due to increased traffic. Need for<br />
additional taxiway link when aircraft movements exceed 30,000<br />
per annum.<br />
Expanded marketing of island products for example aquaculture<br />
or agriculture product requires rapid deliver by air.<br />
Introduction of heavier wheel loads above those applied by the<br />
predicted critical aircraft.<br />
Introduction of jet RPT services<br />
Possible<br />
Timeframe<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
0-15 years<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
5 years<br />
plus<br />
15 years<br />
plus<br />
15 years<br />
plus<br />
15 years<br />
plus<br />
15 years<br />
plus<br />
15 years<br />
plus<br />
15 years<br />
plus<br />
22