28.01.2015 Views

cwc(h) 600 & cwc(h) 875 installation instruction - Heronhill Air ...

cwc(h) 600 & cwc(h) 875 installation instruction - Heronhill Air ...

cwc(h) 600 & cwc(h) 875 installation instruction - Heronhill Air ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

CWC(H) <strong>600</strong> & CWC(H) <strong>875</strong> INSTALLATION INSTRUCTION<br />

ENGLISH FRANÇAIS DEUTSCH<br />

UNPACKING THE UNIT DÉBALLAGE AUSPACKEN DES GERÄTES 1<br />

OPTIONAL KITS OPTIONS ZUBEHÖR 2<br />

DIMENSIONS AND WEIGHTS DIMENSIONS ET POIDS ABMESSUNGEN & GEWICHTE 3<br />

REMOVAL OF CHASSIS DÉPOSE DU CHÂSSIS GEHÄUSEABBAU 3<br />

INSTALLATION INSTALLATION MONTAGE 3<br />

PIPEWORK TUYAUTERIES ROHRLEITUNGEN 4<br />

VALVES VANNES VENTIL 4<br />

FUSE RATINGS DISJONCTEURS SICHERUNGEN 5<br />

FAN SPEED SELECTION SÉLECTION VITESSE VENTILATION LÜFTERSTUFENAUSWAHL 5<br />

INTERCONNECTING WIRING INTERCONNEXIONS VERBINDUNGSVERDRAHTUNG 5<br />

CONDENSATE DRAIN PIPING EVACUATION CONDENSATS KONDENSWASSERLEITUNG 6<br />

DISCHARGE BLANKING OBTURATION D’UN SOUFFLAGE ABSPERRUNG DES LUFTAUSLASSES 7<br />

REINSTALLING THE CHASSIS REPOSE DU CHÂSSIS GEHÄUSEEINBAU 7<br />

FITTING THE FASCIA FIXATION DU PLENUM MONTAGE DER BLENDE 7<br />

CHECK-LIST CHECK-LIST PRÜFLISTE 8<br />

UNPACKING / DÉBALLAGE / GERÄT AUSPACKEN<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

97208097-04


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

2


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

3


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

4


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

5


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

6


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

7


<strong>Heronhill</strong> - for all your <strong>Air</strong>king requirements<br />

CWC(H) <strong>600</strong> & <strong>875</strong> INSTALLATION CHECK LIST<br />

1 Is the unit square and level with the ceiling 3<br />

2 Is the pipework correctly supported throughout its length 4<br />

3 Are the chilled water pipes insulated right up to the unit 4<br />

4 Have all pipework joints been carefully checked for leaks -<br />

5 Is the fuse size correct 5<br />

6 Is the interconnecting wiring correct 5<br />

7 Is the selected fan speed appropriate for the application 5<br />

8 Does the system respond correctly to commands from the controller -<br />

9 Is the condensate drain correctly sized, connected, supported and insulated 6<br />

10 Has the effectiveness of condensate removal system been tested and there are no leaks 6<br />

11 Is the air distribution as required 7<br />

12 Has Foam Blanking Kit 55500316 been fitted if 3-way air discharge is required 7<br />

Page Checked<br />

CHECK LIST DE L’INSTALLATION DE CWC(H) <strong>600</strong> & <strong>875</strong> Page Vérifié<br />

1 L’unité est-elle fixée de niveau 3<br />

2 Les tuyauteries sont-elles correctement fixées 4<br />

3 Avez-vous isolé les tuyauteries jusqu’au chássis de l’unité 4<br />

4 Avez-vous effectué une recherche de fuites -<br />

5 La taille du disjoncteur est-elle correcte 5<br />

6 Les câblages d’interconnexions sont-ills corrects 5<br />

7 Avez-vous séllectionné les vitesses de ventilation approprié 5<br />

8 Le système répond-t-il correctement à la télécommande -<br />

9 L’evacuation des condensats est-ell correctement raccordée, supportée et isolée 6<br />

10 Avez-vous vérifié le bon fonctionnement de l’évacuation des condensats et qu’il n’y a pas de fuites 6<br />

11 La distribution d’air est-elle correcte 7<br />

12 Si vous désirez un soufflage sur 3 côtés 55500316 7<br />

CWC(H) <strong>600</strong> & <strong>875</strong> MONTAGE PRÜFLISTE Seite Geprüft<br />

1 Ist das Gerät waagerrecht und eben eingebaut 3<br />

2 Sind alle Rohrleitungen über deren gesamte Länge richtig befestigt 4<br />

3 Sind beide Leitungen bis zum Gerätegehäuse isoliert worden 4<br />

4 Sind alle Rohrleitungen und Verbindungen auf Leckagen untersucht worden -<br />

5 Ist die Sicherungsgröße richtig 5<br />

6 Ist die Verbindungsverdrahtung richtig 5<br />

7 Ist die richtige Lüfterdrehzahl eingestellt worden 5<br />

8 Nimmt das System die Befehle des Reglers an -<br />

9 Ist die Tauwasserleitung richtig angeschlossen, aufgehängt und isoliert 6<br />

10 Prüfen Sie nach, ob daß Kondenswasser richtig abfliessen kann und keine Leckstellen vorhanden sind 6<br />

11 Ist die Luftverteilung wie gewünscht 7<br />

12 3 Wege Ausblas 55500316 7<br />

TEV LTD, ARMYTAGE ROAD, BRIGHOUSE, WEST YORKSHIRE, HD6 1QF. TEL: + 44 (0) 1484 405630 FAX: +44 (0) 1484 405620<br />

EMAIL: sales@quartz.co.uk WEB: www.quartz.co.uk<br />

Tel: 01823 665660 www.heronhill.co.uk Fax: 01823 665807<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!