f) Any other formalities necessary for completing the set of activities leading to<br />
expeditious signing of Concession Agreement.<br />
3.3 Part ‘C’<br />
The Consultant shall assist DG (Tourism)/CEC in:-<br />
1. In approving the project implementation plan submitted by the developer for<br />
construction works, design and construction management etc.<br />
2. In establishing the monitoring system for project implementation and<br />
management.<br />
3. In monitoring of physical execution of works on a quarterly basis for which a<br />
QPR format will be prepared by the Consultant. Consultant shall also assist the<br />
Department of Tourism, Govt. of U.P. in QPR review till the completion of the<br />
project.<br />
4. Provide clarification and guidance in the course of execution of the work.<br />
4.0 STUDY DURATION AND DELIVERABLES:<br />
Consultancy services shall begin from the date of the issue of Letter of Award<br />
(LOA). Split of work and sequencing shall be as under-<br />
S.No. Activity Duration from the<br />
date of Award<br />
(Week)<br />
Part-A<br />
1. Project Definition Report 3<br />
2. Feasibility Report<br />
a. Technical Report for airport<br />
b. Technical Report for Tourism related aspect<br />
c. Integrated Master Plan Report<br />
d. Cost estimates and financial evaluation for the<br />
integrated Project.<br />
e. Report on Marketing Strategy, Development<br />
Strategy etc.<br />
3. Preparation of draft documents<br />
a. Advertisement calling for <strong>RFQ</strong><br />
b. <strong>RFQ</strong> document with evaluation criteria<br />
c. <strong>RFP</strong> document with evaluation criteria<br />
d. Draft Concession Agreement<br />
Part-B<br />
Part-C<br />
a) Issue of <strong>RFQ</strong> document<br />
b) Clarifications on <strong>RFQ</strong><br />
c) Evaluation of <strong>RFQ</strong> bids<br />
d) Issue of <strong>RFP</strong> document<br />
e) Assistance in Pre-bid meeting and clarifications<br />
f) Evaluation of <strong>RFP</strong> and recommendations on<br />
Award<br />
g) Assistance in negotiations with preferred bidder<br />
h) Assistance in finalizing the Concession<br />
Agreement<br />
15<br />
15<br />
15<br />
16<br />
16<br />
4<br />
6<br />
15<br />
15<br />
6<br />
12<br />
17<br />
20<br />
22<br />
28<br />
32<br />
32<br />
a. Approval of project implementation plan of the 42<br />
FD-Conslt/20-09-2008