10<br />

f) Any other formalities necessary for completing the set of activities leading to<br />

expeditious signing of Concession Agreement.<br />

3.3 Part ‘C’<br />

The Consultant shall assist DG (Tourism)/CEC in:-<br />

1. In approving the project implementation plan submitted by the developer for<br />

construction works, design and construction management etc.<br />

2. In establishing the monitoring system for project implementation and<br />

management.<br />

3. In monitoring of physical execution of works on a quarterly basis for which a<br />

QPR format will be prepared by the Consultant. Consultant shall also assist the<br />

Department of Tourism, Govt. of U.P. in QPR review till the completion of the<br />

project.<br />

4. Provide clarification and guidance in the course of execution of the work.<br />

4.0 STUDY DURATION AND DELIVERABLES:<br />

Consultancy services shall begin from the date of the issue of Letter of Award<br />

(LOA). Split of work and sequencing shall be as under-<br />

S.No. Activity Duration from the<br />

date of Award<br />

(Week)<br />

Part-A<br />

1. Project Definition Report 3<br />

2. Feasibility Report<br />

a. Technical Report for airport<br />

b. Technical Report for Tourism related aspect<br />

c. Integrated Master Plan Report<br />

d. Cost estimates and financial evaluation for the<br />

integrated Project.<br />

e. Report on Marketing Strategy, Development<br />

Strategy etc.<br />

3. Preparation of draft documents<br />

a. Advertisement calling for <strong>RFQ</strong><br />

b. <strong>RFQ</strong> document with evaluation criteria<br />

c. <strong>RFP</strong> document with evaluation criteria<br />

d. Draft Concession Agreement<br />

Part-B<br />

Part-C<br />

a) Issue of <strong>RFQ</strong> document<br />

b) Clarifications on <strong>RFQ</strong><br />

c) Evaluation of <strong>RFQ</strong> bids<br />

d) Issue of <strong>RFP</strong> document<br />

e) Assistance in Pre-bid meeting and clarifications<br />

f) Evaluation of <strong>RFP</strong> and recommendations on<br />

Award<br />

g) Assistance in negotiations with preferred bidder<br />

h) Assistance in finalizing the Concession<br />

Agreement<br />

15<br />

15<br />

15<br />

16<br />

16<br />

4<br />

6<br />

15<br />

15<br />

6<br />

12<br />

17<br />

20<br />

22<br />

28<br />

32<br />

32<br />

a. Approval of project implementation plan of the 42<br />