5.2.3 The Consultant should have net profit after tax during last three Financial<br />
Years.<br />
Note: - Information submitted on Annexure B3, B5, B7, B8 and audited annual<br />
accounts for relevant years should be certified by the Chartered Accountant<br />
5.2.4 The Consultants applying in Consortiums will have to submit the information<br />
of Para-7.1 and 7.2 in respect of each consortium member individually as well as for<br />
the consortium as a whole for the purpose of Minimum Qualifying Criteria and<br />
evaluation criteria as per Para-5 & 6.<br />
6. EVALUATION CRITERIA:<br />
6.1 Bids without document fee (ref. para 8.5(1)), earnest money Rs. 5.00 lakh (ref.<br />
Para 8.5(2)) and undertaking (ref. Para 9) will be disqualified.<br />
6.2 The offers shall be scrutinized by Consultancy Evaluation Committee (CEC)<br />
constituted by Govt. of U.P. on the basis of details provided in Envelop-A<br />
(Technical Bid) following the under mentioned criteria :<br />
Sl.<br />
No.<br />
Criteria<br />
A Manpower and<br />
technical<br />
experience<br />
A-1 Project<br />
Development<br />
Experience of<br />
International<br />
Airport Project.<br />
A-2 Successful<br />
selection of<br />
Aviation/Touris<br />
m Project<br />
Developers<br />
through PPP<br />
mode.<br />
A-3 Project<br />
*Management<br />
Consultancy<br />
Experience<br />
*Advisory<br />
Weightage<br />
(Percentage)<br />
Total<br />
marks<br />
80 80<br />
Marking system<br />
Marking system<br />
30 30 For each development of experience of<br />
International Airport* 10 marks.<br />
*In case of consortium marks would be<br />
assigned in the ratio of stakes in<br />
consortium (see annexure B-3 & B-4).<br />
30 30 a) No. of projects<br />
For every successful selection of<br />
Aviation/Tourism project developer-4<br />
marks (maximum 20 marks)<br />
b) Cumulative Projects Cost<br />
For every Rs. 500 Cr. worth of project<br />
cost-5 marks (maximum 20 marks) see<br />
annexure B-5 & B-6<br />
However total Marks of (a) and (b) shall<br />
not be more than 30 Marks.<br />
10 10 a) For each experience of Project<br />
management consultancy/Advisory<br />
consultancy in respect of projects of not<br />
less than 500 cr.- 2.0 marks will be<br />
awarded. (Maximum 5 mark)<br />
b) Cumulative Project Cost<br />
For every Rs. 200 Cr. worth of project<br />
cost-1 Marks (Maximum 5 marks)<br />
FD-Conslt/20-09-2008