29.01.2015 Views

Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...

Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...

Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12<br />

5.2.3 The Consultant should have net profit after tax during last three Financial<br />

Years.<br />

Note: - Information submitted on Annexure B3, B5, B7, B8 and audited annual<br />

accounts for relevant years should be certified by the Chartered Accountant<br />

5.2.4 The Consultants applying in Consortiums will have to submit the information<br />

of Para-7.1 and 7.2 in respect of each consortium member individually as well as for<br />

the consortium as a whole for the purpose of Minimum Qualifying Criteria and<br />

evaluation criteria as per Para-5 & 6.<br />

6. EVALUATION CRITERIA:<br />

6.1 Bids without document fee (ref. para 8.5(1)), earnest money Rs. 5.00 lakh (ref.<br />

Para 8.5(2)) and undertaking (ref. Para 9) will be disqualified.<br />

6.2 The offers shall be scrutinized by Consultancy Evaluation Committee (CEC)<br />

constituted by Govt. of U.P. on the basis of details provided in Envelop-A<br />

(Technical Bid) following the under mentioned criteria :<br />

Sl.<br />

No.<br />

Criteria<br />

A Manpower and<br />

technical<br />

experience<br />

A-1 Project<br />

Development<br />

Experience of<br />

International<br />

Airport Project.<br />

A-2 Successful<br />

selection of<br />

Aviation/Touris<br />

m Project<br />

Developers<br />

through PPP<br />

mode.<br />

A-3 Project<br />

*Management<br />

Consultancy<br />

Experience<br />

*Advisory<br />

Weightage<br />

(Percentage)<br />

Total<br />

marks<br />

80 80<br />

Marking system<br />

Marking system<br />

30 30 For each development of experience of<br />

International Airport* 10 marks.<br />

*In case of consortium marks would be<br />

assigned in the ratio of stakes in<br />

consortium (see annexure B-3 & B-4).<br />

30 30 a) No. of projects<br />

For every successful selection of<br />

Aviation/Tourism project developer-4<br />

marks (maximum 20 marks)<br />

b) Cumulative Projects Cost<br />

For every Rs. 500 Cr. worth of project<br />

cost-5 marks (maximum 20 marks) see<br />

annexure B-5 & B-6<br />

However total Marks of (a) and (b) shall<br />

not be more than 30 Marks.<br />

10 10 a) For each experience of Project<br />

management consultancy/Advisory<br />

consultancy in respect of projects of not<br />

less than 500 cr.- 2.0 marks will be<br />

awarded. (Maximum 5 mark)<br />

b) Cumulative Project Cost<br />

For every Rs. 200 Cr. worth of project<br />

cost-1 Marks (Maximum 5 marks)<br />

FD-Conslt/20-09-2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!