Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...
Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...
Revised RFQ /RFP DOCUMENT FOR SELECTION - Uttar Pradesh ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
34<br />
ANNEXURE-B-9<br />
<strong>FOR</strong>MAT <strong>FOR</strong> TECHNICAL TEAM<br />
SI.<br />
No. of Specialist<br />
1 Team Leader<br />
2 Transportation Planner<br />
3 Transport Economist<br />
4 Urban Planner<br />
5 Airport Master Planner<br />
6 Geo-technical Engineer<br />
7 Architect<br />
8 Structural Engineer<br />
9 Financial specialist<br />
10 Concession Agreement specialist<br />
Signature<br />
Name (Authorized Signatory)<br />
<br />
Date.....................<br />
Place...................<br />
NOTE:- The Consultant shall give an affidavit about the experience profile of the<br />
specialist members of the team deputed by him at the time of submission of the Bid.<br />
However, the team members have to produce employer’s certificate in support of<br />
experience before signing the Consultancy Agreement.<br />
FD-Conslt/20-09-2008