30.01.2015 Views

Load Duration and Seasoning Effects on Mortise & Tennon Joinery

Load Duration and Seasoning Effects on Mortise & Tennon Joinery

Load Duration and Seasoning Effects on Mortise & Tennon Joinery

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REPORT DOCUM ENTATION<br />

PAGE<br />

1.REPORT NO. 2. 3. Recipient's A ccessi<strong>on</strong> No.<br />

4. Title <str<strong>on</strong>g>and</str<strong>on</strong>g> Subtitle 5. ReportDate<br />

<str<strong>on</strong>g>Load</str<strong>on</strong>g> <str<strong>on</strong>g>Durati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Seas<strong>on</strong>ing</str<strong>on</strong>g> <str<strong>on</strong>g>Effects</str<strong>on</strong>g> <strong>on</strong> <strong>Mortise</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Ten<strong>on</strong> Joints<br />

6.<br />

August 2000<br />

7. Author(s) 8. Perform ing O rganizati<strong>on</strong> ReportNo.<br />

Richard J. Schmidt & Garth F. Scholl<br />

9. Perform ing O rganizati<strong>on</strong> Name <str<strong>on</strong>g>and</str<strong>on</strong>g> Address<br />

Department of Civil <str<strong>on</strong>g>and</str<strong>on</strong>g> Architectural Engineering<br />

University of Wyoming<br />

Laramie, WY 82071<br />

10. Project/Task/W ork UnitNo.<br />

11. C<strong>on</strong>tract(C) or G rant(G)No.<br />

12. Sp<strong>on</strong>soring O rganizati<strong>on</strong> Name <str<strong>on</strong>g>and</str<strong>on</strong>g> Address 13. Type of Report & Period Covered<br />

USDA NRI/CGP<br />

CSREES<br />

Wash., DC 20250<br />

15. Supplem entary Notes<br />

Timber Frame Business Council<br />

PO Box B1161<br />

Hanover, NH 03755<br />

USDA NRI/CGP C<strong>on</strong>tract No. 97-35103-5053<br />

Timber Framers Guild<br />

PO Box 60<br />

Becket, MA 01223<br />

(C)<br />

(G )<br />

14.<br />

interim<br />

16. Abstract (Limit: 200 words)<br />

The objective of this research is to determine the load durati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> seas<strong>on</strong>ing effects <strong>on</strong> mortise <str<strong>on</strong>g>and</str<strong>on</strong>g> ten<strong>on</strong><br />

joints in tensi<strong>on</strong>. Design of mortise <str<strong>on</strong>g>and</str<strong>on</strong>g> ten<strong>on</strong> joints is currently bey<strong>on</strong>d the scope of the Nati<strong>on</strong>al Design<br />

Specificati<strong>on</strong> for Wood C<strong>on</strong>structi<strong>on</strong>. This <str<strong>on</strong>g>and</str<strong>on</strong>g> previous research have been c<strong>on</strong>ducted to find minimum<br />

detailing requirements for joints of this type. <str<strong>on</strong>g>Load</str<strong>on</strong>g> durati<strong>on</strong> research served a dual purpose in verifying<br />

the previously established detailing requirements <str<strong>on</strong>g>and</str<strong>on</strong>g> finding the load durati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> seas<strong>on</strong>ing effects <strong>on</strong><br />

mortise <str<strong>on</strong>g>and</str<strong>on</strong>g> ten<strong>on</strong> joints. In order to determine these effects, load durati<strong>on</strong> tests <strong>on</strong> full size mortise <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

ten<strong>on</strong> joint specimens were c<strong>on</strong>ducted. Drawboring <str<strong>on</strong>g>and</str<strong>on</strong>g> peg diameter effects were also analyzed in the<br />

l<strong>on</strong>g-term load study. Strength tests were performed at the c<strong>on</strong>clusi<strong>on</strong> of l<strong>on</strong>g-term testing to find the<br />

resulting effects due to l<strong>on</strong>g-term loading. A method of analyzing combined dowel bearing material<br />

properties of the base material <str<strong>on</strong>g>and</str<strong>on</strong>g> pegs was also studied.<br />

17. Document<br />

a.D escriptors<br />

traditi<strong>on</strong>al timber framing, heavy timber c<strong>on</strong>structi<strong>on</strong>, wood peg fasteners, mortise <str<strong>on</strong>g>and</str<strong>on</strong>g> ten<strong>on</strong><br />

c<strong>on</strong>necti<strong>on</strong>s, joint testing, durati<strong>on</strong> of load, seas<strong>on</strong>ing effects, drawboring.<br />

b. Identifiers/O pen-Ended<br />

c. COSATIField/Group<br />

ii<br />

18. Availability Statem ent 19. Security Class (This Report) 21. No.ofPages<br />

Release unlimited. Unclassified. 111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!