STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR<br />

5.6 Notice of Award (dated ____________)<br />

5.7 Instructions to Bidders (pages 00004-1 through 00004-4)<br />

5.8 Measurement <strong>and</strong> Payment (pages 00011-1 through 00011-5<br />

5.9 Risk Management/Insurance Requirements (pages 00014-1 through 00014-7)<br />

5.10 General Conditions (pages 00015-1 through 00015-42)<br />

5.11 Supplementary General Conditions (pages 00016-1 through 00016-3)<br />

5.12 Special Conditions (pages 00017-1 through 00017-4)<br />

with Attachment A (4-pages)<strong>and</strong> Attachment B (3-pages)<br />

5.13 Application <strong>and</strong> Certificate for Payment (page 00018-1)<br />

5.14 FDEP Supplementary Conditions – Construction Procurement (pages 00019-1 through<br />

00019-34), including Appendices.<br />

5.15 Technical <strong>Specifications</strong> 723 Pages (<strong>Div</strong>isions 1-16).<br />

5.16 Drawings 110 Sheets.<br />

5.17 Appendix – A (Geotechnical Report by: Larry M. Jacobs & Associates)<br />

5.18 Appendix – B (Geotechnical Report by: Larry M. Jacobs & Associates)<br />

5.19 Appendix – C (Hazardous Materials Survey by: Professional Service Industries)<br />

Article 6.<br />

TIME FOR COMPLETION; LIQUIDATED DAMAGES.<br />

Contractor agrees to commence the work under the Contract Documents within ten (10) calendar days of<br />

receipt of written Notice to Proceed <strong>and</strong>, subject authorized adjustments, to achieve Substantial<br />

Completion not later than 450 calendar days after commencement of the Work, <strong>and</strong> to achieve Final<br />

Completion in accordance with Section 01025 of these specifications not later than sixty (60) calendar<br />

days after the date established for Substantial Completion. Contractor further agrees to pay liquidated<br />

damages in the amount of $500.00 for each consecutive calendar day Contractor is late in achieving<br />

Substantial Completion <strong>and</strong> $100.00 for each consecutive calendar day Contractor is late in achieving<br />

Final Completion. The notice to Proceed will not be issued until a building permit has been issued by the<br />

Escambia County Inspections Department.<br />

Article 7.<br />

MISCELLANEOUS.<br />

7.1 Terms used in this Agreement which are defined in Article 1 of the General<br />

Conditions shall have the meanings indicated in the General Conditions.<br />

7.2 Neither Owner nor Contractor shall, without the prior written consent of the other,<br />

assign or sublet in whole or in part his interest under any of the Contract Documents; <strong>and</strong>, specifically,<br />

Contractor shall not assign any monies due or to become due without the prior written consent of Owner.<br />

7.3 Owner <strong>and</strong> Contractor each binds himself, his partners, successors, assigns, <strong>and</strong><br />

legal representatives to the other party hereto in respect to all covenants, agreements <strong>and</strong> obligations<br />

contained in the Contract Documents.<br />

7.4 The Contract Documents constitute the entire Agreement between Owner <strong>and</strong><br />

Contractor <strong>and</strong> may be altered, amended or repealed only by a duly executed written instrument, in the<br />

form of a Change Order.<br />

Emergency Operations Support Addition St<strong>and</strong>ard Form of Agreement 00008-2<br />

& Alterations to the Customer Services Bldg.<br />

HMM 239903 / ECUA CIP No. CS141E