- Page 1 and 2:
Emerald Coast Utilities Authority E
- Page 3 and 4:
01090 - References.................
- Page 5 and 6:
09240 - Gypsum Board ..............
- Page 7 and 8:
INVITATION TO BID INVITATION TO BID
- Page 9 and 10:
INSTRUCTIONS TO BIDDERS I. General
- Page 11 and 12:
Failure to file a NOTICE OF PROTEST
- Page 13 and 14:
CONTRACTOR'S PROPOSAL BASE BID ECUA
- Page 15 and 16:
CONTRACTOR'S PROPOSAL LIST OF SUBCO
- Page 17 and 18:
CONTRACTOR'S PROPOSAL 1. Descriptio
- Page 19 and 20:
CONTRACTOR'S PROPOSAL TRENCH SAFETY
- Page 21 and 22:
BID BOND BID BOND KNOW ALL MEN BY T
- Page 23 and 24:
CERTIFICATION OF NON-SEGREGATED FAC
- Page 25 and 26:
STANDARD FORM OF AGREEMENT BETWEEN
- Page 27 and 28:
STANDARD FORM OF AGREEMENT BETWEEN
- Page 29 and 30:
PERFORMANCE BOND The notice and tim
- Page 31 and 32:
same by registered mail or certifie
- Page 33 and 34:
and incidentals for the item in pla
- Page 35 and 36:
3.06 Bid Item No. 6 - Electrical Se
- Page 37 and 38:
CONTRACTOR’S WARRANTY (Date) PROJ
- Page 39 and 40:
RISK MANAGEMENT POLICY AND STANDARD
- Page 41 and 42:
employers liability required in the
- Page 43 and 44: The Builders Risk insurance is to b
- Page 45 and 46: performance of the agreement or con
- Page 47 and 48: Emergency Operations Support Additi
- Page 49 and 50: Emergency Operations Support Additi
- Page 51 and 52: Emergency Operations Support Additi
- Page 53 and 54: Emergency Operations Support Additi
- Page 55 and 56: Emergency Operations Support Additi
- Page 57 and 58: Emergency Operations Support Additi
- Page 59 and 60: Emergency Operations Support Additi
- Page 61 and 62: Emergency Operations Support Additi
- Page 63 and 64: Emergency Operations Support Additi
- Page 65 and 66: Emergency Operations Support Additi
- Page 67 and 68: Emergency Operations Support Additi
- Page 69 and 70: Emergency Operations Support Additi
- Page 71 and 72: Emergency Operations Support Additi
- Page 73 and 74: Emergency Operations Support Additi
- Page 75 and 76: Emergency Operations Support Additi
- Page 77 and 78: Emergency Operations Support Additi
- Page 79 and 80: Emergency Operations Support Additi
- Page 81 and 82: Emergency Operations Support Additi
- Page 83 and 84: Emergency Operations Support Additi
- Page 85 and 86: Emergency Operations Support Additi
- Page 87 and 88: Emergency Operations Support Additi
- Page 89 and 90: Amend the second sentence of paragr
- Page 91 and 92: ATTACHMENT A Emergency Operations S
- Page 93: ATTACHMENT A Emergency Operations S
- Page 99 and 100: H. Subsequent to Owner's accepting
- Page 101 and 102: construction and shall be responsib
- Page 103 and 104: SUPPLEMENTARY CONDITIONS (CONSTRUCT
- Page 105 and 106: 20 EQUAL EMPLOYMENT OPPORTUNITY (EX
- Page 107 and 108: 1.1.9. Contract Documents - The Agr
- Page 109 and 110: ARTICLE 4 - RESOLUTION OF PROTESTS
- Page 111 and 112: of fire and extended coverage; and
- Page 113 and 114: NOTE: Articles 17, 18 19 and Append
- Page 115 and 116: ARTICLE 19 - DEBARMENT AND SUSPENSI
- Page 117 and 118: 20.6. If the price of this Agreemen
- Page 119 and 120: 7. A participant in a covered trans
- Page 121 and 122: 3. The Contractor shall provide wri
- Page 123 and 124: Economic Areas ____________________
- Page 125 and 126: APPENDIX D TO THE FLORIDA DEPARTMEN
- Page 127 and 128: (7) The contractor will include the
- Page 129 and 130: APPENDIX F TO THE FLORIDA DEPARTMEN
- Page 131 and 132: . Establish and maintain a current
- Page 133 and 134: 9. A single goal for minorities and
- Page 135 and 136: ___________________________________
- Page 137 and 138: SECTION 01004 - TESTING LABORATORY
- Page 139 and 140: 3.07 Notify Engineer 24 hours in ad
- Page 141 and 142: A. General: Contractor shall coordi
- Page 143 and 144: Prop...............................
- Page 145 and 146:
General Conditions or the Additiona
- Page 147 and 148:
1.3 DEFINITIONS A. Change Proposal
- Page 149 and 150:
B. Preparation of Applications for
- Page 151 and 152:
B. The Engineer will perform one in
- Page 153 and 154:
SECTION 01090 - REFERENCES PART 1 -
- Page 155 and 156:
OSHA Available from Department of D
- Page 157 and 158:
ARMA Asphalt Roofing Manufacturers
- Page 159 and 160:
DHI Door and Hardware Institute (70
- Page 161 and 162:
LSGA Laminated Safety Glass Associa
- Page 163 and 164:
NWWDA National Wood Window and Door
- Page 165 and 166:
UL Underwriters Laboratories Inc. (
- Page 167 and 168:
SECTION 01100 - SUMMARY PART 1 - GE
- Page 169 and 170:
SECTION 01200 - PROGRESS DOCUMENTAT
- Page 171 and 172:
4. Incorporate the quality control
- Page 173 and 174:
SECTION 01210 - ALLOWANCES PART 1 -
- Page 175 and 176:
SECTION 01230 - ALTERNATES PART 1 -
- Page 177 and 178:
SECTION 01300 - SUBMITTALS PART 1 -
- Page 179 and 180:
PART 3 - EXECUTION 3.1 TIMING OF SU
- Page 181 and 182:
submitted by the Contractor in acco
- Page 183 and 184:
B. Reports: Prepare and submit cert
- Page 185 and 186:
6. Security and protection for samp
- Page 187 and 188:
C. C. Accessible Temporary Egress:
- Page 189 and 190:
C. Sanitary Facilities: Provide tem
- Page 191 and 192:
F. Temporary Partitions: Provide fl
- Page 193 and 194:
1.5 SUBMITTALS A. Waste Management
- Page 195 and 196:
3.3 RECYCLING DEMOLITION WASTE, GEN
- Page 197 and 198:
SECTION 01600 - PRODUCT REQUIREMENT
- Page 199 and 200:
performance, weight, size, durabili
- Page 201 and 202:
3. Refer to Divisions 2 through 16
- Page 203 and 204:
A. Conditions: Architect will consi
- Page 205 and 206:
3.2 PREPARATION A. Existing Utility
- Page 207 and 208:
3.7 PROGRESS CLEANING A. General: C
- Page 209 and 210:
SECTION 01731 - CUTTING AND PATCHIN
- Page 211 and 212:
1. If identical materials are unava
- Page 213 and 214:
SECTION 01732 - SELECTIVE DEMOLITIO
- Page 215 and 216:
E. Survey of Existing Conditions: R
- Page 217 and 218:
SECTION 01770 - CLOSEOUT PROCEDURES
- Page 219 and 220:
2. Provide heavy paper dividers wit
- Page 221 and 222:
SECTION 01782 - OPERATION AND MAINT
- Page 223 and 224:
with clear plastic and metal sleeve
- Page 225 and 226:
C. Product Information: Include the
- Page 227 and 228:
F. Drawings: Prepare drawings suppl
- Page 229 and 230:
E. Record the following types of in
- Page 231 and 232:
identification number. B. Record Sh
- Page 233 and 234:
A. Trees, stumps, root systems, roc
- Page 235 and 236:
A. Topsoil suitable for final gradi
- Page 237 and 238:
Fertilizer shall conform to the app
- Page 239 and 240:
SECTION 02215 - EXCAVATION, BACKFIL
- Page 241 and 242:
F. The Contractor shall acquaint hi
- Page 243 and 244:
SECTION 02220 - BUILDING DEMOLITION
- Page 245 and 246:
B. Verify that hazardous materials
- Page 247 and 248:
END OF SECTION 02220 Emergency Oper
- Page 249 and 250:
B. Use shapes and sizes as designed
- Page 251 and 252:
1. Place after pipe has been bedded
- Page 253 and 254:
SECTION 02280 - SOIL TREATMENT PART
- Page 255 and 256:
B. Remove from beneath the structur
- Page 257 and 258:
C. Couplings and Fittings: Coupling
- Page 259 and 260:
Portland cement and three parts mas
- Page 261 and 262:
of not less than 3000 psi. 3.06 TAP
- Page 263 and 264:
full compensation for the work invo
- Page 265 and 266:
subgrade. Apply material to penetra
- Page 267 and 268:
Use locally available materials and
- Page 269 and 270:
previous strips. Complete base cour
- Page 271 and 272:
SECTION 02556 - WATER DISTRIBUTION
- Page 273 and 274:
shall be lined in accordance with A
- Page 275 and 276:
The owner or the specifying enginee
- Page 277 and 278:
contracting to the extent shown on
- Page 279 and 280:
non-rising stem design. Valves 16-i
- Page 281 and 282:
accordance with ASTM D429 and shall
- Page 283 and 284:
Deep 6 feet 8” X 1” Thick Disc
- Page 285 and 286:
shall be used. Material to be ducti
- Page 287 and 288:
3. Pipe Markings a. Nominal Size b.
- Page 289 and 290:
Ford Mueller Others as approved by
- Page 291 and 292:
1. Fully encase sewer line with a m
- Page 293 and 294:
3.04 Appurtenance Installation A. V
- Page 295 and 296:
[THIS SPACE INTENTIONALLY LEFT BLAN
- Page 297 and 298:
the number and location of all samp
- Page 299 and 300:
B. All pipes shall be marked in acc
- Page 301 and 302:
a. A 9-inch minimum width joint sea
- Page 303 and 304:
C. Manhole Sections 1. Use precast
- Page 305 and 306:
d. Plug ends of line and cap or plu
- Page 307 and 308:
SECTION 02826 - ORNAMENTAL METAL FE
- Page 309 and 310:
A. Gate Configuration: Single leaf
- Page 311 and 312:
SECTION 02905 - TRANSPLANTING PART
- Page 313 and 314:
surrounding materials during operat
- Page 315 and 316:
A. General Performance: Transplante
- Page 317 and 318:
A. General: Extract trees under sup
- Page 319 and 320:
C. Root-Ball Stabilization: Install
- Page 321 and 322:
SECTION 03300 - CAST-IN-PLACE CONCR
- Page 323 and 324:
AA. BB. CC. DD. EE. FF. GG. HH. II.
- Page 325 and 326:
1.5 QUALITY ASSURANCE A. Codes and
- Page 327 and 328:
B. Fly Ash: ASTM C 618, Type C or F
- Page 329 and 330:
a. Butt splices shall be fused weld
- Page 331 and 332:
surfaces or other portions of the w
- Page 333 and 334:
event greater than 24 inches. 1. Co
- Page 335 and 336:
defective areas with clean, square
- Page 337 and 338:
C. Reinforced Masonry: Provide conc
- Page 339 and 340:
SECTION 03310 - CONCRETE SEALER PAR
- Page 341 and 342:
B. Inspections: 1. Confirm sealing
- Page 343 and 344:
1.6 PROJECT CONDITIONS A. Do not pl
- Page 345 and 346:
SECTION 04230 - REINFORCED UNIT MAS
- Page 347 and 348:
c. Mortar properties. d. Grout comp
- Page 349 and 350:
E. Hot-Weather Requirements: Protec
- Page 351 and 352:
2.8 RIGID ANCHORS A. General: Fabri
- Page 353 and 354:
3.4 SAMPLE PANEL 2. For vertical al
- Page 355 and 356:
C. Provide continuity at corners an
- Page 357 and 358:
constructed, stopping at least one
- Page 359 and 360:
6. Clean concrete masonry by cleani
- Page 361 and 362:
PART 2 - PRODUCTS 2.1 CAST STONE UN
- Page 363 and 364:
E. Tool exposed joints slightly con
- Page 365 and 366:
E. Material Certificates: Include s
- Page 367 and 368:
3. Protect surfaces of window and d
- Page 369 and 370:
H. Water: Potable. 2.6 REINFORCEMEN
- Page 371 and 372:
D. Use full-size units without cutt
- Page 373 and 374:
A. General: Install entire length o
- Page 375 and 376:
1. Place grout only after inspector
- Page 377 and 378:
C. ASTM A 123 -- Standard Specifica
- Page 379 and 380:
agency at no additional expense to
- Page 381 and 382:
1. Provide holes in steel members a
- Page 383 and 384:
E. Welding: 1. Do not perform field
- Page 385 and 386:
Girders; Steel Joist Institute (SJI
- Page 387 and 388:
joists, with welded stud anchors or
- Page 389 and 390:
E. AWS D1.3-89 - Structural Welding
- Page 391 and 392:
D. Sheet Metal Accessories: ASTM A
- Page 393 and 394:
SECTION 05311 - ACOUSTICAL ROOF DEC
- Page 395 and 396:
1.6 WARRANTIES A. Manufacturers of
- Page 397 and 398:
F. Termination and transition assem
- Page 399 and 400:
3.3 CLEANING A. Cleaning: Upon comp
- Page 401 and 402:
B. Welding Qualifications: Qualify
- Page 403 and 404:
H. Cut, reinforce, drill, and tap m
- Page 405 and 406:
B. Fit exposed connections accurate
- Page 407 and 408:
C. Delegated-Design Submittal: For
- Page 409 and 410:
1. Provide mechanically deposited o
- Page 411 and 412:
a. Smooth Soffit Construction: Cons
- Page 413 and 414:
A. Touchup Painting: Immediately af
- Page 415 and 416:
a. Show method of connecting member
- Page 417 and 418:
C. Cut, drill, and punch metals cle
- Page 419 and 420:
1. For aluminum pipe railings, atta
- Page 421 and 422:
1.6 PROJECT CONDITIONS A. Field Mea
- Page 423 and 424:
2.5 GENERAL FINISH REQUIREMENTS A.
- Page 425 and 426:
SECTION 05811 - ARCHITECTURAL JOINT
- Page 427 and 428:
B. Moisture Barrier: Pre-Compressed
- Page 429 and 430:
A. Size: Provide nominal sizes indi
- Page 431 and 432:
SECTION 06402 - INTERIOR ARCHITECTU
- Page 433 and 434:
y testing identical products per te
- Page 435 and 436:
3. Identify fire-retardant-treated
- Page 437 and 438:
1. Notify Architect seven days in a
- Page 439 and 440:
2.10 HANDRAILS AND STAIR TREADS (Mo
- Page 441 and 442:
D. Clean woodwork on exposed and se
- Page 443 and 444:
SECTION 07115 - BITUMINOUS DAMPPROO
- Page 445 and 446:
SECTION 07130 - SELF-ADHERING SHEET
- Page 447 and 448:
B. Primer: Liquid waterborne or sol
- Page 449 and 450:
SECTION 07210 - BUILDING INSULATION
- Page 451 and 452:
2. Protect ends with capped self-lo
- Page 453 and 454:
SECTION 07241 - POLYMER-BASED EXTER
- Page 455 and 456:
H. Product Test Reports: Based on e
- Page 457 and 458:
1. Aging: Before cutting and shippi
- Page 459 and 460:
A. Protect contiguous work from moi
- Page 461 and 462:
A. Prepare joints and apply sealant
- Page 463 and 464:
PART 2 — PRODUCTS 2.1 MATERIALS A
- Page 465 and 466:
SECTION 07270 - AIR & VAPOR BARRIER
- Page 467 and 468:
C. Materials: Fluid applied air and
- Page 469 and 470:
membrane. Membrane shall be interle
- Page 471 and 472:
C. Application of Transition Membra
- Page 473 and 474:
1.4 QUALITY ASSURANCE A. Manufactur
- Page 475 and 476:
B. Minimum inside bend radius on fl
- Page 477 and 478:
SECTION 07541 - FELTBACK ADHERED TH
- Page 479 and 480:
D. All new and temporary constructi
- Page 481 and 482:
2.2 MEMBRANE A. Sarnafil G410 Feltb
- Page 483 and 484:
APPLICATION RATES FOR FELTBACK MEMB
- Page 485 and 486:
expansion type fasteners with stain
- Page 487 and 488:
the membrane prior to separation of
- Page 489 and 490:
A. Prior to demobilization from the
- Page 491 and 492:
and other defects. B. Comply with S
- Page 493 and 494:
B. Coordinate dimensions with rough
- Page 495 and 496:
G. Safety Railing System: Roof-hatc
- Page 497 and 498:
SECTION 07811 - SPRAYED FIRE-RESIST
- Page 499 and 500:
2.3 AUXILIARY MATERIALS A. General:
- Page 501 and 502:
C. As installation of other constru
- Page 503 and 504:
2. Penetration firestopping is iden
- Page 505 and 506:
A. Examine substrates and condition
- Page 507 and 508:
SECTION 07900 - JOINT SEALANTS PART
- Page 509 and 510:
C. High Movement Silicone Sealant: