Estimated Traffic Volumes on Maple Grove Road<br />

<strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> to <strong>Huntmar</strong> <strong>Drive</strong>: 2018 April 2008<br />

eventual future construction over the next several years, while Maple Grove Road will have<br />

local improvements and upgrades due to the implementation of new access arrangements<br />

that will be carried out by the developers in question.<br />

On the assumption that between 20% and 40% of the Jackson Trails daily residential traffic<br />

would be attracted to the Maple Grove Road Corridor, and that the connecting link would<br />

also attract a small portion (±10%) of the daily traffic flow between <strong>Stittsville</strong> and the City<br />

of Ottawa to/from the east, the daily traffic volumes on Maple Grove Road depicted on<br />

Figure 4 are estimated to occur.<br />

Figure 4: Projected Daily Traffic Impact on Maple Grove Road Corridor Resulting<br />

from <strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> Intersection with Maple Grove Road<br />

On the other hand, it is noteworthy that were the <strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> not extended to<br />

intersect with Maple Grove Road west of Alon <strong>Street</strong>, the following would be the expected<br />

repercussions:<br />

a. All Jackson Trails traffic would be confined to the Hazeldean Road Corridor to<br />

some extent, which is experiencing increasing congestion with no relief in sight<br />

for several years;<br />

b. Potential diversion of Jackson Trails traffic to Johnwoods <strong>Street</strong> with resultant<br />

added pressure to close the Maple Grove/Johnwoods <strong>Street</strong> intersection, which,<br />

as will be seen later, is not recommended;<br />

c. Potential diversion of Jackson Trails traffic to Johnwoods <strong>Street</strong> south and the<br />

proposed east-west minor collector, linking Johnwoods <strong>Street</strong> with the <strong>Huntmar</strong><br />