Estimated Traffic Volumes on Maple Grove Road<br />

<strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> to <strong>Huntmar</strong> <strong>Drive</strong>: 2018 April 2008<br />

1.0 INTRODUCTION AND PROJECT SCOPE<br />

Depicted on Figure 1 are the transportation network alignments (Roads and Rapid Transit)<br />

within Kanata West that were recommended in the Kanata West Road Network<br />

Environmental Study Report, completed in 2005.<br />

As shown, Maple Grove Road has two distinct sections either side of <strong>Huntmar</strong> <strong>Drive</strong>. East of<br />

<strong>Huntmar</strong> <strong>Drive</strong>, Maple Grove Road is to be widened to a four-lane cross-section within a 30<br />

to 37.5 m right-of-way. West of <strong>Huntmar</strong> <strong>Drive</strong>, existing Maple Grove Road is to be<br />

downgraded and replaced by the proposed Kanata West <strong>Main</strong> <strong>Street</strong> linking the <strong>Stittsville</strong><br />

<strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> located within the Jackson Trails Residential Community west of<br />

Johnwoods <strong>Street</strong>, with Palladium <strong>Drive</strong>.<br />

Since the approval of the Kanata West Development Plan by City Council, development has<br />

been ongoing within Kanata West.<br />

<strong>To</strong> date, the <strong>Huntmar</strong> <strong>Drive</strong> <strong>Extension</strong> has been completed, linking Maple Grove Road with<br />

Hazeldean Road/Iber Road, and the Fairwinds South residential subdivision (Mattamy<br />

Corporation) is under construction.<br />

While the future of Maple Grove Road east of <strong>Huntmar</strong> <strong>Drive</strong> has been settled and the<br />

required right-of-way protected through the development process, there is a question about<br />

the short to medium-term future of Maple Grove Road west of <strong>Huntmar</strong> <strong>Drive</strong>, until such<br />

time as the Kanata West <strong>Main</strong> <strong>Street</strong> has been implemented (not likely to occur for several<br />

years).<br />

Consequently, City of Ottawa staff have requested that a Transportation Overview be<br />

prepared to address the short to medium-term upgrades that will be required along Maple<br />

Grove Road west, until such time as the full <strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> is in place.<br />

Following a preliminary meeting with City Kanata West staff and affected developers<br />

(represented by Tartan Corporation), the following issues were identified to be addressed in<br />

the Transportation Overview.<br />

• Traffic impact of recent opening of the <strong>Huntmar</strong> <strong>Drive</strong> <strong>Extension</strong>;<br />

• Potential traffic impact resulting from <strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> extension to a T-<br />

intersection with Maple Grove Road west of Alon <strong>Street</strong>;<br />

• Potential traffic impact of closing Johnwoods <strong>Street</strong> at Maple Grove Road;<br />

• Potential traffic impact of proposed Mattamy Subdivisions on Maple Grove Road –<br />

Fairwinds South, North and West;<br />

• Potential traffic impact of proposed Tartan Subdivision on Maple Grove Road;<br />

• Potential traffic impact of Claridge Subdivision on Maple Grove Road; and<br />

• Based on the projected future peak hour/daily traffic volumes on Maple Grove Road,<br />

between the <strong>Stittsville</strong> <strong>Main</strong> <strong>Street</strong> <strong>Extension</strong> and <strong>Huntmar</strong> <strong>Drive</strong>, recommend an<br />

appropriate right-of-way, cross-section and individual intersection lane requirements<br />

to address the needs, as determined.<br />

The locations of the above subdivisions are depicted on Figure 2.<br />