27.02.2015 Views

TVK Annual Report 2010 (pdf, 2.5 MB)

TVK Annual Report 2010 (pdf, 2.5 MB)

TVK Annual Report 2010 (pdf, 2.5 MB)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

In order to implement the above <strong>TVK</strong> Nyrt. quarterly supplies the data on quantities of the released packaging materials and<br />

pays the utilisation fee to the coordinating organisation.<br />

The Öko-Pannon Kht. Ensures implementation of the required utilisation ratios against payment.<br />

Water and soil<br />

Potable water is provided by operating our own plant that produces, cleans and distributes drinking water. This plant also<br />

supplies potable water to MOL’s TIFO Refinery via our own drinking water network. As a result of a continuous downward<br />

trend in demand for potable water at the industrial compound, the amount of water produced falls short of half of the<br />

licensed amount, which justifies a reduction of the capacity we had reserved. With that in mind, we reviewed our production,<br />

purification and distribution system in 2009 and applied to the authorities for a new unified and combined water right license<br />

and for reducing the current licensed production capacity of 1,350,000 m 3 p.a. to 700,000 m 3 p.a.<br />

Legal compliance<br />

• Information and confession report were met the authorities’ obligations.<br />

• The filling works of 3 drinking water wells were finished. The wells were out of order for many years. The report about<br />

filling works was sent to ÉMI-KTVF thus the obligation was executed.<br />

• Two underground heating oil containers on the site of drinking water plant were eliminated. The report about elimination<br />

works was sent to ÉMI-KTVF and MKEH thus the obligation was executed.<br />

• The remediation and monitoring of after treatment lake system were continued in year <strong>2010</strong>. The monitoring report was<br />

sent to ÉMI-KTVF.<br />

Authority controls<br />

• The supervisory authority held sewer inspections twice in <strong>2010</strong> (10th of May, 20th of September) on the site. During<br />

the inspection the authority verified all water discharge points where all parameters were under control limit.<br />

The difference of examination results between Central Laboratory and the authority’s laboratory values was less than the<br />

law is allowed thus our control examinations are met the authority’s requirements.<br />

• According to the environmental disaster caused by rupture of the wall of the reservoir was holding waste<br />

sludge of MAL Zrt. on 5th of October, <strong>2010</strong>. Head of OKTVF decreed the examination of potentially<br />

dangerous sludge reservoirs. The supervisory authority held an examination on former waste water<br />

sludge reservoir on 11th of October, <strong>2010</strong>. During the examination we had to make a report about<br />

the types and the amount of wastes were stored in the reservoir during its 26 years of operation.<br />

According to the examination no obligation was decreed.<br />

New water quality protection and damage avert plan was made for the whole area of the site. The new plan is based on the<br />

localization of drainage areas and accepted by the supervisory authority thus the HSE instructed the <strong>TVK</strong> staff on the using<br />

of the plan.<br />

New technology was established for the treatment of sludge origins from the treatment of process water (water from River<br />

Tisza) on the area of Process Water Treatment Plant thus the sludge deposition in the former reservoir was stopped. After<br />

finishing the investment we applied to the authorities for a new unified and combined water right license which shows the<br />

actual state of process water supply system.<br />

New oil-water separators were established for the pretreatment of rainwater on the area of electrical stations where the<br />

main transformers are placed.<br />

New DN400 PE pipeline was build to ensure and increase the safe drinking water supply of the site. The old pipeline will be<br />

used as spare in the future.<br />

Human focus<br />

Health<br />

Professional medical control is especially important because of the large number of potential hazards of different nature employees<br />

may get exposed to and the severity of potential consequences. It is ascertained by job aptitude tests that cover checking general<br />

health status, heart, blood, urine, hearing, vision and respiratory functions.<br />

To ensure the provision of professional and rapid first aid, unit managers had to make sure that a person trained in providing first<br />

aid is available in each work area and in each shift: at present there are 298 trained first aid providers at 48 locations. At each<br />

first aid providing place there is a modern first aid box that contains even more facilities than it is prescribed in the legal rule,<br />

and additional equipment (tourniquet, alumínium-covered elastic patch, eye flusher, revivicating mask, first aid bandage) ensure<br />

providing efficient first aid.<br />

Employees receive basic training and professional upgrading from professional ambulance officers specialising in first aid. A roundthe-clock<br />

emergency service ensures that injuries and impairments are treated professionally and swiftly (ambulance car with<br />

ambulance officer).<br />

Sustainability report<br />

We increased the amount and ratio of collected and reused condensates during <strong>2010</strong> thus we could reduce the amount of<br />

industrial water used for dematerialized water production.<br />

No pollutant emissions in excess of control limit were identified in the waste water discharged into the recipient (River Tisza)<br />

during the sewer inspections held by the supervisory authority; hence no penalty was imposed in respect of waste water<br />

discharged in <strong>2010</strong>. No environmental spillage of chemical substances in volumes larger than 1 m 3 occurred in <strong>2010</strong>. We spent<br />

HUF 327 million on sewage treatment and kept water quality substantially above the level required under law.<br />

In <strong>2010</strong> definite steps were made in the area of health improvement. In addition to the measures required in the legal rule the<br />

following were introduced:<br />

• in order to survey the health status and to initiate the necessary treatment medical examinations and screening test programs<br />

dermatological, cardiovascular, abdoment ultrasoundl and tumor-marker screening tests were carried out, at which totally 225<br />

persons took part.<br />

• General health stattus examinations (blood pressure, blood sugar, body weight-body mass) were institutionally made to several<br />

hudred employees in two cases (June festivity and the autumn STEP day );<br />

• Health plans supporting training on healthy way of living were compiled in 12 cases;.<br />

• 105 persons got immunization against H1N1.<br />

• We organize mass sports program in 11 sports, what was utilize by 696 employee.<br />

106 <strong>TVK</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong><br />

107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!