RFQ/RFP - City of Xenia
RFQ/RFP - City of Xenia
RFQ/RFP - City of Xenia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
September 23, 2010<br />
Request for Qualifications/Proposals (<strong>RFQ</strong>/<strong>RFP</strong>) For <strong>City</strong> <strong>of</strong> <strong>Xenia</strong>, Ohio Downtown Gateway and<br />
Wayfinding Signage Project -- Design-Build Services<br />
<strong>City</strong> <strong>of</strong> <strong>Xenia</strong>, Ohio<br />
Deadline for Submission: Friday, October 22, 2010, 4:00 p.m.<br />
Advertise via <strong>City</strong> cable channel & website, <strong>Xenia</strong> Gazette<br />
To be transmitted to firms on attached list.<br />
FUNDING SOURCE: Community Development Block Grant (CDBG) Program<br />
Fiscal Year 2009 Tier Two Downtown Revitalization Program (CDBG), CDBG Program Income and<br />
CDBG Formula Allocation.<br />
PROJECT DESCRIPTION:<br />
On April 8, 2010 the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> approved a Gateway and Wayfinding Signage Plan (GWS Plan)<br />
completed by Brownstone Design/Kinzelman, Kline and Gossman with oversight from a Gateway and<br />
Wayfinding Signage Plan Steering Committee. The GWS Plan includes schematic designs and<br />
recommendations for signage placement throughout the <strong>City</strong> with specific treatment <strong>of</strong> the downtown<br />
Tier Two grant targeted area. This project is to include signage for the specific downtown Tier Two<br />
area <strong>of</strong> the <strong>City</strong> as well as a downtown kiosk. In addition, the design and installation <strong>of</strong> a park sign<br />
(for Springhill Park) is included in this <strong>RFQ</strong>/<strong>RFP</strong>.<br />
In order to take the plan from conception to completion, the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> seeks a qualified<br />
Design/Build Consultant who will complete the project in entirety from design specifications and<br />
drawings through final construction <strong>of</strong> the Gateway and Wayfinding Signage project. The <strong>City</strong> <strong>of</strong> <strong>Xenia</strong><br />
seeks a not-to-exceed “lump sum” cost for the entire project.<br />
BUDGET:<br />
The <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> has a budget <strong>of</strong> approximately $115,000 in Community Development Block<br />
Group funds available to conduct this Gateway Signage and Wayfinding project.<br />
SCOPE OF WORK<br />
As part <strong>of</strong> the Scope <strong>of</strong> Work for this project, the Selected Design/Build Consultant will be<br />
expected to:<br />
• Create and provide final full construction drawings and specifications for the downtown signage<br />
identified in the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> GWS Plan, as well as a downtown kiosk and park sign for<br />
installation <strong>of</strong> Springhill Park outside the downtown<br />
• Prepare a final sign schedule, messaging schedule, and site map <strong>of</strong> all the signs for final<br />
approval. The successful bidder will need to obtain approval and all required permits from the<br />
<strong>City</strong> <strong>of</strong> <strong>Xenia</strong>, and be expected to present final siting/messaging to the <strong>Xenia</strong> GWS Steering<br />
Committee as well as <strong>City</strong> staff prior to fabrication/installation<br />
1
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
• The qualified sign company will work closely with the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> to insure prevailing wage<br />
requirements are met for installation <strong>of</strong> the signs, and all other <strong>City</strong>/CDBG-required procurement<br />
requirements<br />
• Finalize and negotiate siting <strong>of</strong> the signs<br />
• Work with the <strong>City</strong> and if necessary, downtown owner(s) to site the signs<br />
• Obtain required permits from the <strong>City</strong>, County and/or State<br />
• Coordinate sign approvals through ODOT and the <strong>City</strong><br />
• Develop and deliver a project manual including maintenance instructions, service contact<br />
information, as-built drawings for each sign type, as-built copy schedule for each sign, and<br />
installation photos <strong>of</strong> each sign<br />
• Deliver a five-year warranty from defective materials and workmanship.<br />
SIGNS/KIOSKS TO BE DESIGNED/INSTALLED<br />
Bid should include all <strong>of</strong> the signs identified for the Tier Two Downtown Area <strong>of</strong> the WSG Plan. See<br />
pages 6.1,7.1,7.2,7.3,7.4,and 7.5 in particular <strong>of</strong> the Brownstone Design/KKG Final Package <strong>of</strong> the<br />
<strong>Xenia</strong> Gateway and Wayfinding Signage plan at:<br />
http://www.ci.xenia.oh.us/uploads/CD%20Forms/Wayfinding/FINAL%20WAYFINDING%20PLAN%<br />
20IN%20PDF%203-2-10.pdf on the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> website.<br />
In addition to the identified signs in the GWS Plan, the successful bidder will be required to design and<br />
develop complete detailed drawings and specifications for a downtown kiosk located in the target<br />
area, and the design and installation <strong>of</strong> one park sign to be installed in Springhill Park, outside <strong>of</strong> the<br />
Tier Two area. A map <strong>of</strong> the Tier Two area downtown may be found on the city website at<br />
http://www.ci.xenia.oh.us/uploads/Tier%20Two%20Grant/All%20Quadrants.pdf.<br />
SUBMISSION REQUIREMENTS<br />
Proposal: 6 copies <strong>of</strong> the proposal and proposals should be limited to fifteen single-sided, 8 ½” x 11”<br />
pages, stapled in the upper left-hand corner. Do not provide tabbed inserts or other marketing materials<br />
outside <strong>of</strong> the allowed fifteen pages. Submissions should be easily reproducible (or an original<br />
provided) in the event the <strong>City</strong> needs to make additional copies for review. Written proposals should be<br />
concise and clearly outlined and include:<br />
a. The successful bidding firm’s ability to conduct the scope <strong>of</strong> work within the desired time<br />
frame<br />
b. The successful bidder must show the qualifications and related past experience <strong>of</strong> each<br />
team member, with specific expertise in signage design, planning/code review, landscape<br />
design and landscaping, signage fabrication, and lighting<br />
c. The successful bidder/firm’s approach to the project<br />
d. Firm’s proposed management and staffing; individuals who would be allocated to the<br />
project components, and the name <strong>of</strong> the designated contact or point person for the firm<br />
to the <strong>City</strong>.<br />
2
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
e. A brief description <strong>of</strong> the firm’s related experience and individuals’ experience in<br />
developing downtown graphic wayfinding plans and fabrication/installation <strong>of</strong> signage<br />
f. Firms’ experience with developing construction cost estimates, working with ODOT and<br />
municipal signage requirements, firm’s creative design abilities, and firms’ successful<br />
implementation <strong>of</strong> other wayfinding signage plans<br />
g. A listing <strong>of</strong> any other firms/consultants that may assist the principle, as well as a brief<br />
statement <strong>of</strong> experience from the subordinate firms.<br />
2. A sample <strong>of</strong> a physical prototype sign demonstrating the quality and workmanship that will be<br />
provided in this project. The prototype should include a sample <strong>of</strong> the detailed drawing<br />
specifications that will be provided for all signs, samples <strong>of</strong> the colors to be used (Vinyl, Paint,<br />
Powder Coat, samples <strong>of</strong> masonry material likely to be used.) The successful applicant will<br />
show compliance with the design intent <strong>of</strong> the signs, structural soundness and design, integrity,<br />
ease <strong>of</strong> installation, ease <strong>of</strong> maintenance, overall performance <strong>of</strong> the signage including vandalism<br />
resistance, quality <strong>of</strong> the structural design and materials.<br />
3. A timeline outlining the firm’s ability to complete all required tasks by the deadline <strong>of</strong> August<br />
31, 2011.<br />
4. Bidders’ estimate <strong>of</strong> costs: The successful bidder will provide separate detail for the design<br />
work, the contract administration work, the cost <strong>of</strong> the sign fabrication and final installation on<br />
the attached bid estimate form and will submit this estimate in a sealed envelope separate from<br />
the written proposal.<br />
EVALUATION CRITERIA WILL INCLUDE:<br />
• Bidder’s understanding <strong>of</strong> project as demonstrated in the proposal including conciseness and<br />
thoroughness and identification <strong>of</strong> issues and approaches/solutions<br />
• Bidder’s ability to provide design/build services in at “at risk” position with a final lump-sum<br />
total price<br />
• Primary management experience <strong>of</strong> firm and specific staff<br />
• Strength <strong>of</strong> team qualifications/experience<br />
• Extent <strong>of</strong> experience on similar projects including developing GWS Signage Plans and<br />
completion <strong>of</strong> comparable projects<br />
• Bidder’s proposed design/implementation schedule and availability to immediately begin project<br />
• Bidder’s references evidencing record <strong>of</strong> performance and ability to successfully complete<br />
projects on time and within budget<br />
• Bidder’s quality <strong>of</strong> sample prototype sign<br />
• Bidder’s identified conflicts <strong>of</strong> interest and/or resolution <strong>of</strong> same.<br />
OTHER EXPECTATIONS<br />
That there will be a high quality <strong>of</strong> materials, equipment, processes, and performance provided by the<br />
successful bidder.<br />
3
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
The <strong>Xenia</strong> GWS Plan provided specifications for sign structures and design should be considered<br />
minimum suggestions and not be considered fully engineered specifications.<br />
The cost for the signs should include all design work, administration, the base <strong>of</strong> the sign, landscaping,<br />
sign face, extras, sign installation and warranty.<br />
It will be the responsibility <strong>of</strong> the successful bidder to completely design and engineer the structure<br />
required for each sign type. This includes incorporating safety features and ensuring all signs meet local<br />
and state codes. The selected consultant will be required to incorporate requirements from the<br />
Americans with Disabilities Act, and American Association <strong>of</strong> State Highway and Transportation<br />
Officials (AASHTO) standards and guidelines and David Bacon/Prevailing Wage standards for CDBG.<br />
SELECTION PROCESS<br />
Final selection <strong>of</strong> the design build firm/team will follow a two step process. First, the qualifications and<br />
costs provided under this <strong>RFQ</strong>/<strong>RFP</strong> will be thoroughly reviewed with the top candidate(s) selected by a<br />
Review Team. Second, the top candidate(s) will be interviewed by the Review Team and the finalist<br />
selected. The price is <strong>of</strong> importance to the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong>, but may or may not be considered in the final<br />
award <strong>of</strong> the GWS Plan contract based upon other criteria. The cost provided is to be a “not to exceed”<br />
lump sum cost. Responses received after the close <strong>of</strong> business on the specified due date will not be<br />
considered. The <strong>City</strong> reserves the right to short-list (up to 2) firms for more detailed technical proposals<br />
or schedule interviews with the short-listed firms. The <strong>City</strong> reserves the right to select the second<br />
ranked consultant if negotiations with the first consultant are unsuccessful.<br />
The <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> Community Development Department will administer the project. The project design<br />
procedures shall be in conformance with the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> Planning and Engineering Departments<br />
specifications and guidelines and signage ordinance guidelines for set-backs, right <strong>of</strong> ways, landscaping<br />
<strong>of</strong> the signage and construction.<br />
<strong>RFQ</strong>/<strong>RFP</strong> SUBMISSION DEADLINE AND INSTRUCTIONS<br />
Firms interested in being considered for selection should respond by submitting six (6) copies <strong>of</strong> the<br />
<strong>RFQ</strong>/<strong>RFP</strong> proposal response for the Design/Build project and submitting a cost estimate in a<br />
separate sealed envelope by 4:00 p.m. on Friday October 22, 2010. The bidding form must be<br />
plainly marked and must bear the name <strong>of</strong> the bidder both on the form and the sealed envelope. The six<br />
proposals must be provided separately from the sealed bid. The package shall be clearly labeled with the<br />
name <strong>of</strong> the firm and the title: WAYFINDING SIGNAGE DESIGN/BUILD SERVICES.<br />
If mailed (Must be postmarked by submission deadline):<br />
Mary Crockett<br />
Community Development Director<br />
<strong>City</strong> <strong>of</strong> <strong>Xenia</strong><br />
101 N. Detroit Street<br />
<strong>Xenia</strong>, OH 45385<br />
4
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
If hand delivered (Must be delivered by submission deadline):<br />
Mary Crockett<br />
Community Development Director<br />
<strong>City</strong> <strong>of</strong> <strong>Xenia</strong><br />
966 Towler Road<br />
<strong>Xenia</strong>, Ohio 45385<br />
Email or faxed proposals will NOT be accepted.<br />
By submitting a bid the contractor is demonstrating they have read, understand, and agreed to all bid<br />
documents and addenda.<br />
The <strong>City</strong> reserves the right to accept any or all alternative bids and award a contract to someone other<br />
than the lowest bidder, to waive any irregularities or informalities or both; to reject any or all bids; to<br />
subdivide the award, and in general to make the award <strong>of</strong> the contract in any manner deemed by the<br />
<strong>City</strong>, in its sole discretion, to be in the best interest <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Xenia</strong>.<br />
Each bidder must insure that all employees and applicants for employment are not discriminated against<br />
because <strong>of</strong> race, disability, age, color, familial status, religion, sex, or national origin.<br />
Any questions concerning this project or this <strong>RFQ</strong>/<strong>RFP</strong> may be directed to Mary Crockett by calling at<br />
937-376-7286 or by e-mail at mcrockett@ci.xenia.oh.us.<br />
Approve as to form:<br />
_____________________________________________ Date: __________________<br />
Ronald Lewis, Law Director<br />
Approved for publication:<br />
_____________________________________________ Date: __________________<br />
James W. Percival, <strong>City</strong> Manager<br />
5
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
BID FORM<br />
(TO BE INCLUDED WITH PROPOSAL, IN SEPARATE, SEALED ENVELOPE)<br />
NAME OF RESPONDENT: _______________________________________<br />
DATE: _________________________<br />
ITEM DESCRIPTION<br />
New design work for kiosk, park sign,<br />
detailed specification writing<br />
Field location/siting <strong>of</strong> signs, completion <strong>of</strong><br />
messaging plan, ODOT and local<br />
requirements, management <strong>of</strong> sign<br />
completion/installation per GWS Plan, Phase<br />
I, delivery <strong>of</strong> final warranties to <strong>City</strong>.<br />
Cost <strong>of</strong> sign fabrication to meet GWS Plan<br />
Phase I, plus kiosk and one park sign.<br />
Cost <strong>of</strong> installation to meet GWS Plan Phase<br />
I, plus kiosk and one park sign, including<br />
Prevailing Wage requirements for<br />
installation..<br />
PROPOSAL PRICE<br />
TOTAL:<br />
6
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL (<strong>RFQ</strong>/<strong>RFP</strong>)<br />
FOR GATEWAY AND WAYFINDING SIGNAGE<br />
DESIGN/BUILD SERVICES<br />
ANTICIPATED TIMELINES<br />
Milestone<br />
Anticipated completion date<br />
Legal ad published for <strong>RFQ</strong>/<strong>RFP</strong> September 23, 2010<br />
Bids due to <strong>City</strong> by 4:00 p.m. October 22, 2010<br />
Interviews held by this date, consultant selected November 5, 2010<br />
Award <strong>of</strong> contract by <strong>City</strong> Council. November 25, 2010<br />
Pre-Construction/pre-commencement meeting<br />
held with successful bidder, agreements put in<br />
place<br />
Planning, including final schematics completed,<br />
sites identified and confirmed, messaging and<br />
sites approved by GWS Steering Committee, all<br />
design work completed and approved. Sign<br />
approvals obtained from <strong>City</strong> <strong>of</strong> <strong>Xenia</strong> and<br />
ODOT for specs.<br />
Signs installed, completed, final documents<br />
including warranty provided to the <strong>City</strong>.<br />
December 1, 2010<br />
March 1, 2011<br />
July 31, 2011<br />
Final bills paid by <strong>City</strong> to consultant August 31, 2011<br />
7