ROAD 501<br />
Mileage begins at the junction of Road 210 and proceeds south to junction of Road 500.<br />
Site 1: Mile 0.0 to 0.2 (1056 ft.)<br />
Priority: High<br />
This section of road is insloped with an outside berm. Drainage structures are mainly waterbars,<br />
which are degraded and only partially functional. Some rilling is occuring on road surface<br />
resulting in exposed rocks and roots. Water bars need to be maintained, especially at the .2 mile<br />
mark.<br />
Remedial treatments include:<br />
1. Outslope road<br />
2. Install rolling dips<br />
3. Excavate outside berm and smooth over roadway<br />
4. Armor outfalls<br />
Site 2: Mile 0.2 to 0.3 (528 ft.)<br />
Priority: High<br />
This section of road was constructed on a flat hillslope with no cross-grade. Waterbars are the<br />
drainage structures in place and are functioning properly; however, winter use has degraded the<br />
road bed. The road surface has low rock content, so erosion potential is high. The road grade in<br />
this section is approx. 1-2%. Road grade is nearly flat, some exposed rocks.<br />
Remedial treatments include:<br />
1. Crown or slope road surface<br />
2. Install sharp-angled rolling waterbars<br />
3. Armor waterbar outfalls with rock<br />
4. Excavate outside berm and smooth over roadway<br />
5. Rock surface<br />
6. Re-route road<br />
Site 3: 0.3 to 0.4 (528 ft.)<br />
Priority: High<br />
This section of road is insloped with an outside berm. There is no inboard ditch in this section.<br />
Existing waterbars are responsible for all road surface drainage. Road grade on this section is<br />
approx. 12%<br />
Remedial treatments include:<br />
1. Outslope road surface<br />
2. Replace existing waterbars with rolling dips<br />
3. Excavate outside berm and smooth over roadway<br />
4. Armor drainage outlets<br />
74