Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Boggs</strong> <strong>Mountain</strong> <strong>Demonstration</strong> <strong>State</strong> <strong>Forest</strong> <strong>Draft</strong> Management Plan, June 2008<br />
Q= .4(1.86)152 = 113.1 cfs<br />
The suggested culvert size for Lower Mill Creek was determined to be 40”.<br />
Upper Mill Creek:<br />
The crossing at Upper Mill Creek has a 30” culvert, measures 2.5’ from the base of the culvert to<br />
the headwall, and 3.5’ to the road grade. The headwater depth is 1.4 culvert-diameters.<br />
A=114 acres L= 832 feet (.2 miles) H= 320 feet<br />
Tc= [11.9(.2) 3 /320] .385 = .044 hours (2.6 minutes)<br />
Q= .4(1.86)114<br />
= 84.8 cfs<br />
The suggested culvert size for Upper Mill Creek was determined to be 44”.<br />
Lower Spikenard Creek:<br />
The crossing at Lower Spikenard Creek has a 48” (4’) culvert, and measures 8’ from the base of<br />
the culvert to the headwall as well as to the road grade. The headwater depth is 2 culvertdiameters.<br />
A=248 acres L= 3980 feet (.75 miles) H=840 feet<br />
Tc= [11.9(.75) 3 /840] .385 = .139 hours (8.4 minutes)<br />
Q= .4(1.86)248<br />
= 184.5 cfs<br />
The suggested culvert size for Lower Spikenard Creek was determined to be 52”.<br />
83