03.03.2015 Views

Boggs Mountain Demonstration State Forest Draft ... - Cal Fire

Boggs Mountain Demonstration State Forest Draft ... - Cal Fire

Boggs Mountain Demonstration State Forest Draft ... - Cal Fire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Boggs</strong> <strong>Mountain</strong> <strong>Demonstration</strong> <strong>State</strong> <strong>Forest</strong> <strong>Draft</strong> Management Plan, June 2008<br />

22 14 FIX Starting to rust, outlet<br />

damaged,<br />

200 .1 1 12 FIX outlet needs armor, 500' of<br />

inside ditch<br />

.15 2 12 FIX Overflow, ditch filled b4 inlet,<br />

inlet plugged 25%<br />

.2 3 12 OK high plugging potential, check<br />

periodically<br />

.3 4 12 FIX culvert exposed at outlet .<br />

300 3.45 1 18 OK high plugging potential, check<br />

periodically<br />

? 2 12 OK Bluff Sp., high plugging potential, erosion<br />

at outlet<br />

3.2 3 18 FIX outlet plugged w/sediment, no<br />

cmp slope<br />

3.0 4 36 FIX inlet partially plugged, culvert<br />

functioning ok<br />

? 5 18 FIX culvert partially plugged, inlet damaged<br />

(bent rim)<br />

? 6 12 FIX outlet plugged w/sediment,<br />

inlet ok<br />

? 7 12 FIX inlet damaged, outlet plugged<br />

w/sediment<br />

2.7 8 12 OK inlet damaged, erosion at outlet<br />

occurring, needs bigger<br />

culvert, water over road<br />

2.6 9 12 OK erosion to roadbed, exposed springs in<br />

cutbank<br />

10 30 OK inlet damaged, culvert<br />

functioning ok, upper mill<br />

creek.<br />

2.5 11 12 OK 400' of inside ditch and spring<br />

activity<br />

12 12 OK spring-fed area, needs<br />

headwall, CMP dented<br />

1.4 13 24 FIX inlet is partially plugged<br />

w/debris (slash)<br />

14 12 FIX inlet damaged, overflow onto<br />

roadbed<br />

1.4 15 12 FIX runoff is diverted across roadbed, stream<br />

crossing, needs headwall, inlet bent<br />

1.3 16 24 OK high plugging potential, check<br />

periodically<br />

1.1 17 24 FIX High plugging potential, check<br />

CMP size, needs h.w<br />

.675 18 14 FIX culvert rusted through, no<br />

headwall, overflow<br />

.45 19 18 FIX inlet is plugged, no armor at<br />

outlet, forming gully, inlet<br />

completely buried near road to<br />

rock quary<br />

.15 20 12 FIX culvert is plugged, inlet and<br />

outlet<br />

.1 21 12 OK overflow, check periodically for<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!