<strong>Boggs</strong> <strong>Mountain</strong> <strong>Demonstration</strong> <strong>State</strong> <strong>Forest</strong> <strong>Draft</strong> Management Plan, June 2008<br />

4. Rock surface<br />

Site 2: Mile 0.3 to 0.45 (792 ft.)<br />

Priority: Low<br />

This section of road is insloped with an outside berm. Existing waterbars are not functioning and<br />

surface erosion is occurring. Rills and gullies have formed in the roadbed. Tree bent over road at<br />

.4 miles. Exposed rock and channels prevalent.<br />

Remedial treatments include:<br />

1. Outslope road<br />

2. Install rolling dips or improve existing waterbars<br />

3. Excavate outside berm and smooth over roadway as much as possible<br />

4. Armor outfalls and rock surface<br />

ROAD 540<br />

Mileage begins at junction of Road 500 and proceeds north to junction of Road 541.<br />

Site 1: Mile 0.0 to 0.25 (Jct. Rd. 541) (1320 ft.)<br />

Priority: Medium<br />

This section of road is insloped with an outside berm. The berm on the outside road edge<br />

channels surface runoff back onto the roadbed. There is no inboard ditch in this section. Existing<br />

waterbars are responsible for all road surface drainage. Rill and gully erosion down roadway,<br />

potholes at 0-.2 miles.<br />

Remedial treatments include:<br />

1. Outslope road from 0.0 to 0.1<br />

2. Crown road from 0.1 to 0.25<br />

3. Install rolling dips and/or improve waterbars<br />

4. Excavate outside berm and smooth over roadway<br />

5. Armor outfalls<br />

6. Rock surface<br />

ROAD 542<br />

Mileage begins at junction of Road 540 and proceeds along right fork looping to end at Road 540.<br />

Site1: Mile 0.0 to 1.0 (1.3) (5280 ft.)<br />

Priority: Low<br />

This section of road is insloped with an outside berm. Existing waterbars are responsible for all<br />

road surface drainage. Erosion, potholes, gullies and exposed rock throughout.<br />

Remedial treatments include:<br />

1. Outslope road<br />

2. Install rolling dips and/or improve waterbars<br />

3. Excavate outside berm and smooth over roadway<br />

4. Armor outfalls<br />

5. Rock surface<br />