Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Boggs Mountain Demonstration State Forest Draft ... - Cal Fire
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Boggs</strong> <strong>Mountain</strong> <strong>Demonstration</strong> <strong>State</strong> <strong>Forest</strong> <strong>Draft</strong> Management Plan, June 2008<br />
4. Rock surface<br />
Site 2: Mile 0.3 to 0.45 (792 ft.)<br />
Priority: Low<br />
This section of road is insloped with an outside berm. Existing waterbars are not functioning and<br />
surface erosion is occurring. Rills and gullies have formed in the roadbed. Tree bent over road at<br />
.4 miles. Exposed rock and channels prevalent.<br />
Remedial treatments include:<br />
1. Outslope road<br />
2. Install rolling dips or improve existing waterbars<br />
3. Excavate outside berm and smooth over roadway as much as possible<br />
4. Armor outfalls and rock surface<br />
ROAD 540<br />
Mileage begins at junction of Road 500 and proceeds north to junction of Road 541.<br />
Site 1: Mile 0.0 to 0.25 (Jct. Rd. 541) (1320 ft.)<br />
Priority: Medium<br />
This section of road is insloped with an outside berm. The berm on the outside road edge<br />
channels surface runoff back onto the roadbed. There is no inboard ditch in this section. Existing<br />
waterbars are responsible for all road surface drainage. Rill and gully erosion down roadway,<br />
potholes at 0-.2 miles.<br />
Remedial treatments include:<br />
1. Outslope road from 0.0 to 0.1<br />
2. Crown road from 0.1 to 0.25<br />
3. Install rolling dips and/or improve waterbars<br />
4. Excavate outside berm and smooth over roadway<br />
5. Armor outfalls<br />
6. Rock surface<br />
ROAD 542<br />
Mileage begins at junction of Road 540 and proceeds along right fork looping to end at Road 540.<br />
Site1: Mile 0.0 to 1.0 (1.3) (5280 ft.)<br />
Priority: Low<br />
This section of road is insloped with an outside berm. Existing waterbars are responsible for all<br />
road surface drainage. Erosion, potholes, gullies and exposed rock throughout.<br />
Remedial treatments include:<br />
1. Outslope road<br />
2. Install rolling dips and/or improve waterbars<br />
3. Excavate outside berm and smooth over roadway<br />
4. Armor outfalls<br />
5. Rock surface<br />
76