<strong>Chapter</strong> 1 <strong>Freight</strong> Services <strong>in</strong> <strong>Indian</strong> <strong>Railways</strong><br />

• Out of the 86 throughput enhancement works identified by IR, the<br />

physical progress of 30 works which were planned for completion dur<strong>in</strong>g<br />

2009-10 <strong>and</strong> 2011-12 were less than 50 per cent. Of these, 10 works<br />

taken up dur<strong>in</strong>g 1990-91 to 2003-04 were still <strong>in</strong> the l<strong>and</strong> acquisition <strong>and</strong><br />

earthwork stages <strong>and</strong> were progress<strong>in</strong>g slowly. Seven other works were<br />

neither taken up nor their target dates determ<strong>in</strong>ed.<br />

IR replied (March 2010) that overall 30 out of the 86 works would be<br />

completed by the end of 2009-10. However, as po<strong>in</strong>ted out by Audit<br />

above, physical progress of works planned for completion dur<strong>in</strong>g 2009-<br />

10 <strong>and</strong> 2010-11 were progress<strong>in</strong>g slowly <strong>and</strong> were beh<strong>in</strong>d schedule <strong>and</strong><br />

therefore the pace of progress of these works needs to be quickened.<br />

• The port connectivity works taken up <strong>in</strong> three zones (SCR, ECoR <strong>and</strong><br />

SER) were progress<strong>in</strong>g slowly as shown below.<br />

o Haridaspur-Paradeep new l<strong>in</strong>e <strong>in</strong> ECoR was sanctioned <strong>in</strong> 1996-97<br />

<strong>and</strong> was due for completion <strong>in</strong> June 2010. However, after more<br />

than 12 years, physical progress of the work was only 14 per cent<br />

as l<strong>and</strong> acquisitions were still <strong>in</strong> progress. Further, out of the<br />

estimated 136 m<strong>in</strong>or <strong>and</strong> 27 major bridges, only construction of<br />

major bridges was <strong>in</strong> progress <strong>and</strong> others were not yet taken up.<br />

o In SCR, lay<strong>in</strong>g of new l<strong>in</strong>e between Obulavaripalli to<br />

Krishnapatnam port sanctioned <strong>in</strong> 2007-08 with targeted<br />

completion <strong>in</strong> 2014 under phase I <strong>and</strong> the doubl<strong>in</strong>g work Samalkot<br />

<strong>and</strong> Kak<strong>in</strong>ada port has been completed. The electrification work<br />

was still <strong>in</strong>complete due to the zone’s failure to <strong>in</strong>clude the work of<br />

a small patch of four kilometers from Kak<strong>in</strong>ada port to New Block<br />

cab<strong>in</strong> <strong>in</strong> the orig<strong>in</strong>al estimate. The material modification <strong>in</strong> the<br />

scope of work was pend<strong>in</strong>g sanction <strong>in</strong> Railway Board March<br />

2010.<br />

o<br />

Similarly, <strong>in</strong> the 69.60 kilometer Panskura – Haldia port section <strong>in</strong><br />

SER, the doubl<strong>in</strong>g work from Panskura to Rajgoda has been<br />

completed but the portion between Rajgoda to Tumluk rema<strong>in</strong>s to<br />

be completed <strong>and</strong> thus the planned port connectivity could not be<br />

achieved.<br />

• The Dedicated <strong>Freight</strong> Corridor Corporation of India - a Special Purpose<br />

Vehicle - was set up <strong>in</strong> October 2006 to undertake plann<strong>in</strong>g <strong>and</strong><br />

development, mobilisation of f<strong>in</strong>ancial resources <strong>and</strong> construction,<br />

ma<strong>in</strong>tenance <strong>and</strong> operation of the proposed western <strong>and</strong> eastern corridors<br />

from Jawaharlal Nehru Port to Dadri (1483 kilometers) <strong>and</strong> Ludhiana to<br />

Dankuni (1806 kilometers) respectively. The project was at a very<br />

primitive stage. IR replied (March 2010) that the process of l<strong>and</strong><br />

acquisition was be<strong>in</strong>g closely monitored <strong>and</strong> fund<strong>in</strong>g tie ups with<br />

bilateral/multilateral fund<strong>in</strong>g agencies were at advanced stage <strong>and</strong> the<br />

loan agreement for the western corridor phase–I was expected to be<br />

signed <strong>in</strong> March 2010. The project cost <strong>in</strong>itially estimated at 28,000<br />