<strong>Chapter</strong> 1 <strong>Freight</strong> Services <strong>in</strong> <strong>Indian</strong> <strong>Railways</strong><br />
• Out of the 86 throughput enhancement works identified by IR, the<br />
physical progress of 30 works which were planned for completion dur<strong>in</strong>g<br />
2009-10 <strong>and</strong> 2011-12 were less than 50 per cent. Of these, 10 works<br />
taken up dur<strong>in</strong>g 1990-91 to 2003-04 were still <strong>in</strong> the l<strong>and</strong> acquisition <strong>and</strong><br />
earthwork stages <strong>and</strong> were progress<strong>in</strong>g slowly. Seven other works were<br />
neither taken up nor their target dates determ<strong>in</strong>ed.<br />
IR replied (March 2010) that overall 30 out of the 86 works would be<br />
completed by the end of 2009-10. However, as po<strong>in</strong>ted out by Audit<br />
above, physical progress of works planned for completion dur<strong>in</strong>g 2009-<br />
10 <strong>and</strong> 2010-11 were progress<strong>in</strong>g slowly <strong>and</strong> were beh<strong>in</strong>d schedule <strong>and</strong><br />
therefore the pace of progress of these works needs to be quickened.<br />
• The port connectivity works taken up <strong>in</strong> three zones (SCR, ECoR <strong>and</strong><br />
SER) were progress<strong>in</strong>g slowly as shown below.<br />
o Haridaspur-Paradeep new l<strong>in</strong>e <strong>in</strong> ECoR was sanctioned <strong>in</strong> 1996-97<br />
<strong>and</strong> was due for completion <strong>in</strong> June 2010. However, after more<br />
than 12 years, physical progress of the work was only 14 per cent<br />
as l<strong>and</strong> acquisitions were still <strong>in</strong> progress. Further, out of the<br />
estimated 136 m<strong>in</strong>or <strong>and</strong> 27 major bridges, only construction of<br />
major bridges was <strong>in</strong> progress <strong>and</strong> others were not yet taken up.<br />
o In SCR, lay<strong>in</strong>g of new l<strong>in</strong>e between Obulavaripalli to<br />
Krishnapatnam port sanctioned <strong>in</strong> 2007-08 with targeted<br />
completion <strong>in</strong> 2014 under phase I <strong>and</strong> the doubl<strong>in</strong>g work Samalkot<br />
<strong>and</strong> Kak<strong>in</strong>ada port has been completed. The electrification work<br />
was still <strong>in</strong>complete due to the zone’s failure to <strong>in</strong>clude the work of<br />
a small patch of four kilometers from Kak<strong>in</strong>ada port to New Block<br />
cab<strong>in</strong> <strong>in</strong> the orig<strong>in</strong>al estimate. The material modification <strong>in</strong> the<br />
scope of work was pend<strong>in</strong>g sanction <strong>in</strong> Railway Board March<br />
2010.<br />
o<br />
Similarly, <strong>in</strong> the 69.60 kilometer Panskura – Haldia port section <strong>in</strong><br />
SER, the doubl<strong>in</strong>g work from Panskura to Rajgoda has been<br />
completed but the portion between Rajgoda to Tumluk rema<strong>in</strong>s to<br />
be completed <strong>and</strong> thus the planned port connectivity could not be<br />
achieved.<br />
• The Dedicated <strong>Freight</strong> Corridor Corporation of India - a Special Purpose<br />
Vehicle - was set up <strong>in</strong> October 2006 to undertake plann<strong>in</strong>g <strong>and</strong><br />
development, mobilisation of f<strong>in</strong>ancial resources <strong>and</strong> construction,<br />
ma<strong>in</strong>tenance <strong>and</strong> operation of the proposed western <strong>and</strong> eastern corridors<br />
from Jawaharlal Nehru Port to Dadri (1483 kilometers) <strong>and</strong> Ludhiana to<br />
Dankuni (1806 kilometers) respectively. The project was at a very<br />
primitive stage. IR replied (March 2010) that the process of l<strong>and</strong><br />
acquisition was be<strong>in</strong>g closely monitored <strong>and</strong> fund<strong>in</strong>g tie ups with<br />
bilateral/multilateral fund<strong>in</strong>g agencies were at advanced stage <strong>and</strong> the<br />
loan agreement for the western corridor phase–I was expected to be<br />
signed <strong>in</strong> March 2010. The project cost <strong>in</strong>itially estimated at 28,000<br />