08.03.2015 Views

Resume - PDF - Webprofile.info

Resume - PDF - Webprofile.info

Resume - PDF - Webprofile.info

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WILLIAM B. VECSEY III (TAIT)<br />

872 N. Pineview Drive / Chandler, AZ 85226 / T: 480-247-7542; M: 480-262-1782 / ktvecsey@gmail.com<br />

http://webprofile.<strong>info</strong>/wvecsey/<br />

ENGINEERING MANAGER<br />

Hands-on leader with proven international experience leading engineering operations and lean manufacturing<br />

initiatives supporting multibillion-dollar product design and manufacturing firms. Successful building, directing, and<br />

training engineering teams to design, develop, test, and deliver low-cost, high-quality products. Strong track record<br />

developing and implementing cost-effective, lean processes to minimize product defects and promote efficiency across<br />

manufacturing operations. Highly effective leveraging customer relationships, key resources, and lean manufacturing<br />

methodologies to deliver projects that improve and maximize quality, throughput, and on-time delivery performance.<br />

Able to adapt to new environments with proven ability to oversee new global site startups, facilitate change, and<br />

overcome roadblocks to organizational success.<br />

CORE LEADERSHIP SKILLS<br />

Engineering Management Team Leadership & Collaboration Leveraging Customer Relationships<br />

Product Design & Development Project Management & Execution New Manufacturing Startups<br />

Lean Manufacturing Business Development Initiatives Continuous Process Improvements<br />

PROFESSIONAL EXPERIENCE<br />

HONEYWELL INTERNATIONAL – Glendale / Tempe, AZ<br />

2006 – Present<br />

$11 billion division of large aerospace company with more than 40,000 employees.<br />

Engineering Manager (2008 – Present)<br />

Promoted to manage 12-member project engineering team at two sites supporting development, building, and testing<br />

of complex momentum systems, structural control systems, rocket propulsion valve systems, and mechanisms for<br />

space environment. Hire, develop, and direct engineering personnel in generating proposals and procuring materials.<br />

Identify and resolve issues regarding product development and production. Track and manage project requirements in<br />

developing and implementing mechanical systems. Serve as Control Account Manager responsible for costing and<br />

scheduling for reaction wheel projects<br />

Selected Achievements<br />

$75 million+ in new business growth generated by managing efforts to create 25 new business proposals to<br />

develop and deliver satellite reaction wheel assemblies to both commercial and government customers.<br />

100% on-time training completion rate achieved through creation of email review and record keeping process to<br />

track and record safety training in place of outdated paper system, ensuring safety requirements were met.<br />

Leveraged existing resources and processes to secure 42% increase in headcount key to accommodating<br />

additional business demand of approximately 50% in space, missile, and marine business.<br />

Secured follow-on business and improved customer relations after spearheading offsite project that included<br />

overseeing staff shortages and updating key stakeholders – completing project ahead of schedule.<br />

Senior Project Engineer (2006 – 2008)<br />

Led cross-functional production team on projects supporting Standard Missile 3 Solid Divert Attitude Control System<br />

(SDACS) program. Managed team priorities for production of (SDACS) valves. Evaluated components and final<br />

assemblies per acceptance test procedures. Created technical presentations and documentation for internal and<br />

customer reviews. Created specification and test procedure for shipping container.<br />

Selected Achievements<br />

92% to 94% increase in on-time delivery performance achieved by transforming engineering culture focused on<br />

standardizing processes and reducing lead times in production of missile values.<br />

12% reduction in project costs attained as result of developing specifications to build and test prototype shipping<br />

container for missile values to replace use of expensive standard commercial carriers.<br />

Lowered lead times after streamlining tracking system supporting hardware builds and customer communications,<br />

enabling approximately 12 employees to gain total of three man hours of productive time back each day.<br />

DELPHI – Lockport, NY 1996 – 2006<br />

Global component supplier to automotive, computing, and medical industries with 100,000+ employees.<br />

Senior Product Engineer (1999 – 2006)<br />

<strong>Resume</strong>


William B. Vecsey III (Tait) PAGE 2 OF 2<br />

Professional Experience, Continued…<br />

Delphi, Continued…<br />

Oversaw product design and validation of automotive HVAC module assembly and components for GM full-size truck<br />

project covering 1.6 million per year. Implemented design, warranty, tooling, and assembly improvements (DFMA,<br />

Design for Manufacturability and Assembly), resulting in zero design-related defects. Submitted engineering<br />

requirements to purchasing in order to achieve project requirements. Created component and final assembly drawings.<br />

Reviewed, approved, and managed changes for all PPAP (Production Part Approval Process) packages. Monitored<br />

injection mold tools built in Korea. Presented design changes and engineering estimates to GM customers.<br />

Selected Achievements<br />

15% in cost reductions for HVAC module components realized by leveraging value engineering principles to set and<br />

meet cost/quality targets for parts purchased from suppliers.<br />

12% in warranty costs cut on 1.6 million units per year volume after investigating high-quantity warranty returns and<br />

updating HVAC housing design to add protective ribbing to eliminate damage due to handling.<br />

Saved approximately 45 seconds of assembly time per unit with more than 6000 units produced per day through<br />

implementation of newly-developed, one-piece evaporator seal.<br />

Achieved zero design-related defects as result of establishing and maintaining extensive DFMEA (Design Failure<br />

Mode Effects Analysis) matrix used to develop robust part features that met production requirements.<br />

Product Development Team Leader / Manufacturing Engineer (1998 – 1999)<br />

Managed production launch of new assembly cell for GM full-size truck automotive HVAC modules at Brownfield site in<br />

central Mexico. Led weekly team meetings, quarterly workshops, and customer presentations. Tracked project<br />

progress and expenses. Debugged and installed assembly cell; created and maintained all assembly documentation.<br />

Trained new work force and Resident Engineers to take over operations. Achieved PPAP (Production Part Approval<br />

Process) at first submission and passed customer-monitored run-at-rate on first attempt.<br />

Selected Achievements<br />

Lowered just-in-time delivery of parts from 13 days to 30 minutes by leading project to design and install HVAC<br />

assembly cell in central Mexico that included creating all process documentation and training new Engineers and<br />

Assemblers.<br />

Exceeded first-time-through quality record 3% from previous generation design as result of successfully presenting<br />

project concepts, plan, and updates to deliver high-volume HVAC units to GM Mexico customer.<br />

Manufacturing Engineer (1996 – 1998)<br />

Installed assembly cell operations for new automotive HVAC module designs in Juarez, Mexico (Greenfield Site).<br />

Created and maintained all documentation for assembly operation including work instructions, PFMEA, PCP, PFD, etc.<br />

Coordinated build of injection molds and all assembly equipment. Estimated new product labor and equipment costs.<br />

Benchmarked business pursuit operation in Spain as part of quoting cellular manufacturing in US. In charge of<br />

injection mold tool changes and maintenance of automotive HVAC housing cases. Reorganized assembly work station<br />

layouts to effectively utilize floor space and improve ergonomics in plastics handling departments.<br />

Selected Achievements<br />

Developed and trained new team to design and build HVAC units for export vehicle market within new lean<br />

manufacturing/assembly environment.<br />

Reduced non-value added movements 15%+ by updating assembly cell layout that also improved operator’s total<br />

operation cycle time.<br />

Successfully managed parts bank build during three-month tool change two weeks ahead of schedule with zero<br />

interruptions to assembly operations as result of tracking and managing major injection mold tooling change.<br />

EDUCATION / CERTIFICATIONS<br />

<br />

<br />

<br />

M.S. in Engineering Management, Syracuse University, Syracuse, NY<br />

B.S. in Mechanical Engineering, University at Buffalo, The State University of New York, Buffalo, NY<br />

Certification: Design for Six Sigma, Honeywell Aerospace

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!