5.1.5 TANTRANSCO submits that in addition to above, works for enhancement of power<br />

transformer was also undertaken. The detail of the works carried out is given as below.<br />

Table 26: Enhancement of Power Transformers during FY 2010-11 (5 months) to FY 2012-13<br />

Sr. No<br />

Rating of<br />

the SS<br />

FY 2010-11 FY 2011-12 FY 2012-13<br />

Nos MVA Nos MVA Nos MVA<br />

1 230KV 6 500 3 200 - -<br />

2 110KV 27 357 64 767 19 206<br />

3 66KV - - - - - -<br />

Total 33 857 67 967 19 206<br />

5.1.6 TANTRANSCO submits that the additional expenditure incurred on transmission asset is<br />

in line with the clause 19 of the TNERC Tariff Regulations which have been incurred for<br />

efficient and successful operation of the Transmission System.<br />

5.1.7 TANTRANSCO based on the additional capitalisation carried out for each operational<br />

circle, submits herewith the consolidated additional capitalisation by TANTRANSCO<br />

during the FY 2010-11 to FY 2012-13 in the following table:<br />

Table 27: Summary of additional capitalisation for Transmission during FY 2010-11 to FY 2012-13<br />

Sr. No. Works/Schemes<br />

Rs. Crores<br />

Capitalization<br />

FY 2010-11 FY 2011-12 FY 2012-13<br />

1 Substations<br />

a 230 KV Substation 16.06 22.83 274.26<br />

b 110 KV Substation 30.24 58.58 95.32<br />

c 66 KV Substation 0.05 - -<br />

2<br />

Power Evacuation / Link<br />

Lines<br />

a 400 KV Line - 0.11 845.17<br />

b 230 KV Lines 6.62 0.00 81.16<br />

c 110 KV Lines 6.08 4.96 232.51<br />

d 66 KV Lines 0.06 - -<br />

3 Other Circles<br />

a Mettur Workshop 0.04 - -<br />

b Erode SLDC Circle 0.06 0.09 -<br />

c P&C Coimbatore Circle 0.00 0.01 -<br />

d Tirunelveli Wind Circle - 3.04 -<br />

4 Other Activities<br />

a<br />

Enhancemnet / Additional<br />

Power Transformers<br />

- - 150.00<br />

b Improvement of lines - - 100.00<br />

c Capacitor bank - - 22.90<br />

d R- APDRP - - 40.36<br />

Total 59.22 89.63 1,841.67<br />

5.1.8 The detail of the additional capitalization submitted in the present petition is actual<br />

capitalization during FY 2010-11 and provisional expenses for FY 2011-12.<br />

5.1.9 It is submitted to the Hon’ble Commission to reconsider additional capitalization for FY<br />

2011-12 after submission of audited accounts for FY 2011-12.<br />

5.1.10 The projected capitalization for FY 2012-13 is on the basis of transmission programme<br />

projected for the year.<br />

Page 23