Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
TO:<br />
PLANNING COMMITTEE<br />
DATE: 13 April 2011<br />
REPORT OF:<br />
AUTHOR:<br />
HEAD OF BUILDING & DEVELOPMENT<br />
SERVICES<br />
Alan Ward<br />
TELEPHONE: 01737 276 216<br />
EMAIL:<br />
AGENDA ITEM: 8 WARD: Horley East<br />
alan.ward@reigate-banstead.gov.uk<br />
APPLICATION NUMBER: 04/01778/RM13 VALID: 7 September 2010<br />
APPLICANT: Barratt Southern Counties AGENT: Gerry Lytle Associates<br />
LOCATION:<br />
HORLEY DEVELOPMENT NORTH EAST SECTOR, HORLEY<br />
DESCRIPTION: Details of access, appearance, l<strong>and</strong>scaping, layout <strong>and</strong> scale for 308<br />
dwellings (including 60 bed extra care home) <strong>and</strong> neighbourhood<br />
centre<br />
DRAWING NUMBERS: See Condition 13<br />
SUMMARY<br />
Outline planning permission was granted following a resolution of the Planning<br />
Committee made in March 2005 <strong>and</strong> the subsequent completion of a legal<br />
agreement in September 2006. This was for 600 of the allocated 710 dwellings<br />
within the new neighbourhood, a neighbourhood centre, a primary school <strong>and</strong> a<br />
community hall, comprising phases one <strong>and</strong> two.<br />
This reserved matters application progresses the development of the new<br />
neighbourhood of 710 homes in Horley East, commonly known as the North East<br />
Sector. Construction of the site is well underway, with phase one, comprising 252<br />
homes <strong>and</strong> two additional pockets to the west by the London to Brighton railway<br />
(known as phases 1A <strong>and</strong> 1B <strong>and</strong> accounting for 40 dwellings) nearing completion.<br />
This application relates to phase two of the site, as indicated within the outline<br />
application, <strong>and</strong> is the parcel of l<strong>and</strong> immediately to the east of Lake Lane.<br />
Permission has been granted for the spine road that will run through phase two <strong>and</strong><br />
serve the housing now proposed, this is under construction.<br />
The development would incorporate 308 dwellings <strong>and</strong> a neighbourhood centre. 60<br />
of the dwellings would be provided within an extra care facility, which would<br />
consist of self-contained one <strong>and</strong> two-bedroom flats with communal areas <strong>and</strong><br />
twenty four hour care available. This would be operated by a Registered Social<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
L<strong>and</strong>lord. Overall 25% of the dwellings within phase two would be affordable<br />
housing in line with <strong>Council</strong> policy <strong>and</strong> what was agreed at the outline stage.<br />
The school site is located within this phase <strong>and</strong> is shown on the plans. This parcel of<br />
l<strong>and</strong> is to be h<strong>and</strong>ed over to the County <strong>Council</strong> in September <strong>and</strong> its layout <strong>and</strong><br />
design have yet to be determined, as it would be subject to a separate application<br />
which the County <strong>Council</strong> may process themselves. However, it is envisaged that<br />
they will do so in consultation with the <strong>Borough</strong>.<br />
The neighbourhood centre would include three shop units, two office units <strong>and</strong><br />
conversion of the grade II listed Tanyard Barn into a community centre.<br />
The proposed layout of the scheme follows guidance set out in Surrey Design, the<br />
Horley Design Guide <strong>and</strong> the <strong>Council</strong>’s Local Distinctiveness Design Guide. It<br />
would continue the main themes of phase one with a hierarchy of roads to serve the<br />
dwellings, comprising a main distributor road through the centre with smaller<br />
roads radiating to the outer boundaries of the site. There would be pedestrian links<br />
throughout the site to provide internal circulation <strong>and</strong> access to the surrounding<br />
area. Development would be laid out in informal blocks defined by roads or public<br />
<strong>and</strong> private spaces within the scheme. The dwellings themselves would comprise a<br />
mix of sizes <strong>and</strong> heights, generally being higher <strong>and</strong> denser along the spine road<br />
<strong>and</strong> at other focal points, decreasing in scale towards the edges to achieve a<br />
successful transition to the countryside beyond.<br />
The proposal includes an appropriate mix of private <strong>and</strong> affordable housing to<br />
accord with the requirements of the outline permission <strong>and</strong> the legal agreement.<br />
There would be a number of associated areas of open play space of various forms to<br />
serve the dwellings<br />
The detailed designs vary between building types, but a more traditional design is<br />
proposed for those houses sited towards the outer boundaries, particularly with the<br />
countryside, with a more urban feel to buildings located at the focal points of the<br />
site. In addition, with much of phase one completed <strong>and</strong> occupied it has been<br />
possible to see aspects that could be improved upon, <strong>and</strong> the applicant has agreed<br />
to the following:<br />
<br />
<br />
<br />
<br />
<br />
An increase in width of garage doors to allow easier parking of vehicles;<br />
The introduction of chimneys on many dwellings <strong>and</strong> greater articulation on<br />
buildings;<br />
Wooden-frame windows <strong>and</strong> sash windows where design requires it;<br />
Variations in road surface throughout the development; <strong>and</strong><br />
Details of a small open area by the neighbourhood centre being reserved by<br />
condition, allowing further consideration to increase parking <strong>and</strong> recycling<br />
provision.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
In addition, the development includes more off-road parking than was the norm for<br />
phase one, in order to minimise on-street parking.<br />
The development would continue to use the palette of materials agreed for phase<br />
one to be sympathetic to the overall design approach. This would include, for<br />
example, facing brickwork, tile hanging, render <strong>and</strong> weatherboarding to external<br />
elevations, <strong>and</strong> a mix of tiles <strong>and</strong> slate effect roofs. Such a mix would add visual<br />
interest <strong>and</strong> variety to the development without preventing a wider design<br />
consistency being achieved across the neighbourhood as a whole.<br />
Open space within the development would be provided by way of a large Local<br />
Area for Play (‘Super LAP’) by the community centre, <strong>and</strong> a Local Equipped Area<br />
for Play (LEAP) at the northern part of the site. Beyond this is the Riverside Green<br />
Chain, which will provide formal <strong>and</strong> informal recreational space, which received<br />
approval under a separate permission. Trees along the western <strong>and</strong> eastern<br />
boundaries will be retained <strong>and</strong> incorporated into the development.<br />
The development is also to incorporate a Sustainable urban Drainage System (SuDS)<br />
to provide surface water attenuation <strong>and</strong> flood protection measures. This will be in<br />
the form of swales, rills <strong>and</strong> permeable paving <strong>and</strong> can be controlled by condition.<br />
The applicant is currently finalising the design detail in consultation with the<br />
<strong>Council</strong>.<br />
10% of the energy requirements of the dwellings would be met from renewable<br />
sources such as solar panels <strong>and</strong> air source heat pumps.<br />
Flats within the extra care facility are classified as a normal dwelling type, for<br />
people over 55 with varying levels of care requirements. A Registered Social<br />
L<strong>and</strong>lord would run the facility, as affordable housing with a mix of social rented<br />
<strong>and</strong> affordable leasehold units. The Housing Manager has confirmed that there is a<br />
need for this type of facility within the <strong>Borough</strong> <strong>and</strong> it was envisaged that it would<br />
be built within the North West Sector, which has yet to gain planning approval (the<br />
<strong>Council</strong> has resolved to grant outline permission but the necessary planning<br />
obligation has not yet been completed). The early introduction of this facility is<br />
welcomed, but as the applicant has not yet secured an end user for the facility it will<br />
be necessary to reserve other parts of the site for affordable housing in case it does<br />
not go ahead. This can be secured by a deed of variation to the original planning<br />
obligation for phases one <strong>and</strong> two, which is currently being drafted.<br />
The reserved matters accord with the outline planning permission <strong>and</strong> the<br />
requirements of the legal agreement, <strong>and</strong> would help to create a high quality new<br />
neighbourhood that follows good practice in its layout <strong>and</strong> design.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
RECOMMENDATION<br />
Subject to the completion of all documentation required to create a deed of variation<br />
to the planning obligation under Section 106 of the Town <strong>and</strong> Country Planning Act<br />
1990 (as amended) attached to application 04/018778/OUT to:<br />
(i)<br />
(ii)<br />
Provide the option to develop a 60 unit extra care housing scheme; <strong>and</strong><br />
Reserve development of part of the site until the extra care scheme has been<br />
secured, in order to ensure that the appropriate amount of affordable housing<br />
is provided.<br />
Reserved matters are APPROVED subject to conditions.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Consultations:<br />
Highway Authority: no objection.<br />
Gatwick Airport: no objection.<br />
EDF Energy: no objection<br />
Surrey Police Crime Prevention Officer: no objection.<br />
Horley Town <strong>Council</strong>: no objection<br />
NATS Safeguarding: no objection.<br />
Environment Agency: objection. (Note: this is expected to be withdrawn.)<br />
SCC Archaeology: no objection subject to a suggested condition.<br />
Representations:<br />
Letters were sent to neighbouring properties on 16 September 2010 <strong>and</strong> 15 March<br />
2011, site notices were posted 27 September 2010 <strong>and</strong> 22 March 2011, <strong>and</strong> an<br />
advertisement was placed in the local press on 22 September 2010. Six responses<br />
have been received raising the following issues:<br />
Issue Number Response<br />
Increase in traffic <strong>and</strong> congestion 2 See paragraphs 6.30-6.35<br />
Over-development 1 See paragraphs 6.13-6.16<br />
General objection 1 See paragraph 6.1<br />
No need for the development<br />
Deviation from masterplan<br />
Lack of infrastructure<br />
Noise <strong>and</strong> disturbance<br />
1.0 Site <strong>and</strong> Character Appraisal<br />
1<br />
2<br />
1<br />
1<br />
See paragraph 6.1<br />
See paragraph 6.23<br />
See paragraph 6.1<br />
See paragraph 6.29<br />
1.1 The North East Sector amounts to a 55-hectare site located on the northern<br />
side of Langshott. This application relates to phase two of this overall site, as<br />
per the legal agreement accompanying the outline permission, which is<br />
approximately 11.2 hectares. The site currently comprises open fields with an<br />
existing hedgerow on the western side, on the boundary with Lake Lane (part<br />
of the National Cycle Route), <strong>and</strong> a tree belt toward the eastern side,<br />
beyond which is a smaller parcel of l<strong>and</strong> contained by tree lines that also<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
constitutes the application site. The application site includes Tanyard Farm<br />
on the southern boundary, which is a grade II listed barn with outbuildings<br />
<strong>and</strong> a yard area.<br />
1.2 Phase one of the sector is on the other side of Lake Lane to the west, the<br />
Langshott Estate is beyond Langshott to the south, <strong>and</strong> to the east are fields<br />
<strong>and</strong> another parcel of l<strong>and</strong> that has outline planning permission for 110 units<br />
which, constitutes the third <strong>and</strong> final phase of the North East Sector<br />
development.<br />
2.0 Added Value<br />
2.1 At the pre-application stage the applicant was advised to provide a logical<br />
continuation of phase one in design <strong>and</strong> layout.<br />
2.2 Improvements secured during the course of the application include:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Additional parking spaces secured with l<strong>and</strong>scaping;<br />
An increase in width of garaging;<br />
A reduction in the size <strong>and</strong> bulk of the extra care home;<br />
An increase in the scale of buildings about the care home to create an<br />
appropriate townscape;<br />
Continuous higher density frontage where it is appropriate along the<br />
spine road;<br />
More variation in dwelling types along the spine road;<br />
The introduction of chimneys <strong>and</strong> re-introduction of extended porch<br />
canopies, full bay windows, gable elements, wooden-frame windows<br />
(including sash) <strong>and</strong> tile hanging where necessary;<br />
Variation in surfacing used on the spine road;<br />
Alterations to the design of swales to increase visual appeal (the final<br />
design is to be confirmed);<br />
An increase in height of dwellings facing onto the neighbourhood centre<br />
to provide a clearer <strong>and</strong> appropriate sense of place;<br />
The introduction of a footpath to the rear of the extra care scheme;<br />
The introduction of an additional road to increase permeability <strong>and</strong><br />
create perimeter blocks; <strong>and</strong><br />
An increase in the depth of the l<strong>and</strong>scape buffer between the<br />
development <strong>and</strong> Langshott.<br />
2.3 Further improvements could be secured through the use of conditions<br />
including one to reserve the final detail of the open area in the<br />
neighbourhood centre so that parking levels <strong>and</strong> recycling facilities may be<br />
improved.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
3.0 Relevant Planning <strong>and</strong> Enforcement History<br />
3.1 04/01778/OUT A new neighbourhood of 600<br />
dwellings with associated facilities<br />
<strong>and</strong> infrastructure works<br />
Resolution to grant<br />
23 March 2005<br />
Granted with S106<br />
22 September 2006<br />
3.2<br />
04/01778/RM1<br />
Construction of the Spine Road <strong>and</strong><br />
Swales to facilitate residential<br />
development for phase one of the<br />
NE Sector new neighbourhood<br />
development<br />
Granted<br />
2 October 2007<br />
3.3<br />
04/01778/RM2<br />
Reserved matters application for 252<br />
new homes<br />
Granted<br />
4 December 2007<br />
3.4<br />
04/01778/RM12<br />
Reserved matters application<br />
pertaining to the spine road for<br />
phase two of 04/01778/OUT<br />
Granted<br />
25 January 2011<br />
4.0 Proposal <strong>and</strong> Design Approach<br />
4.1 This reserved matters application follows outline permission 04/01778/OUT<br />
granted in September 2006. The reserved matters for which approval are<br />
sought are access, appearance, l<strong>and</strong>scaping, layout <strong>and</strong> scale of 308 dwellings<br />
<strong>and</strong> the neighbourhood centre. The principle of development, the means of<br />
access <strong>and</strong> the impact of the development on the wider environment were<br />
determined at the outline application stage.<br />
4.2 The school site is located within this phase, <strong>and</strong> this parcel of l<strong>and</strong> is to be<br />
h<strong>and</strong>ed over to the County <strong>Council</strong> in September. Its layout <strong>and</strong> design<br />
has yet to be determined, as it will be subject to a separate application. It is<br />
envisaged that the County <strong>Council</strong> will progress this in consultation with the<br />
<strong>Borough</strong> <strong>Council</strong>.<br />
4.3 The design approach for the development continues the themes of phase one,<br />
which has been informed by the advice in the Horley Design Guide <strong>and</strong><br />
Surrey Design. This has included creating a variety of sub-characters within<br />
the phase to encourage a sense of place <strong>and</strong> identity for residents <strong>and</strong> visitors<br />
alike, <strong>and</strong> a layout containing distinctive features such as urban squares to<br />
create a legible form of development. The applicant has taken account of the<br />
constraints of the site, namely the flood plain, existing tree belts <strong>and</strong><br />
l<strong>and</strong>scaping, which have played a major part in defining <strong>and</strong> influencing the<br />
final layout.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
4.4 The flood plain defines the developable area in this respect <strong>and</strong> therefore<br />
creates open areas at the edge of development that will be utilised as visual<br />
breaks, areas of l<strong>and</strong>scaping or for outdoor recreational uses. The tree belts<br />
form strong features running north-south through the site, which again allow<br />
significant spacing between built form, <strong>and</strong> create l<strong>and</strong>scaped avenues<br />
that would complement internal areas of open space.<br />
4.5 The Fastway bus route would pass through the development <strong>and</strong> leave the<br />
site onto Langshott by the neighbourhood centre. Only buses would be<br />
allowed to exit the site in this manner, ensured by the presence of an<br />
automatic bus gate.<br />
4.6 Housing would be laid out in the form of perimeter blocks of appropriate<br />
sizes on either side of the main spine road. These blocks would vary in<br />
character to reflect their position within the hierarchy of areas that make up<br />
the phase, <strong>and</strong> ultimately part of the overall neighbourhood. This approach<br />
is encouraged in both the Horley Design Guide <strong>and</strong> Surrey Design, which<br />
refers to the importance of distinct character areas such as:<br />
The neighbourhood core: to include formal spaces; close-knit development;<br />
doors fronting streets with short front gardens; a mix of dwelling sizes;<br />
l<strong>and</strong>mark buildings; a range of dwelling heights; traditional materials; <strong>and</strong><br />
secure rear courtyards for parking with some on street designated bays.<br />
Transitional area: to include a more regular road pattern; roads incorporating<br />
a number of character areas; dwellings fronting roads <strong>and</strong> main footpaths or<br />
cycle routes; shorter terraces of dwellings; a lower density; larger gardens<br />
with space to park behind building lines; <strong>and</strong> terraced parking in rear<br />
courtyards.<br />
Countryside edge: to include as above but more spacious development;<br />
lower densities; larger buildings of more individual design fronting onto the<br />
countryside; high quality design; less regular building lines; <strong>and</strong> limited on<br />
street parking.<br />
4.7 The use of air source heat pumps <strong>and</strong> solar panels would be utilised to<br />
ensure that a minimum of 10% of the development’s energy needs are met<br />
from renewable sources. It is expected that the detailed design of the new<br />
school will add to this.<br />
4.8 Further details of the development are as follows:<br />
Site area<br />
Proposed parking spaces<br />
Parking st<strong>and</strong>ard<br />
11.2 hectares<br />
447 (including 49 visitor spaces)*<br />
462 (maximum)<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Number of affordable units 71<br />
Proposed site density<br />
Density north of Langshott<br />
Density of Langshott Estate<br />
Density of Phase 1<br />
27.5 dwellings per hectare<br />
3-15 dwellings per hectare<br />
20-50 dwellings per hectare<br />
31 dwellings per hectare<br />
*The level of designated parking is likely to increase with the re-design of the<br />
open space by the neighbourhood centre.<br />
4.9 Details of the mix <strong>and</strong> affordability of dwellings are as follows:<br />
Unit Type Open Market Affordable Overall<br />
One <strong>and</strong> two-bedroom flats<br />
(extra care facility)<br />
0 60 60<br />
Two bedroom houses 4 4 8<br />
Two bedroom coach houses 16 0 16<br />
Three bedroom houses 88 5 93<br />
Four bedroom houses 87 2 89<br />
Five bedroom houses 42 0 42<br />
Total: 237 71 308<br />
5.0 Policy Context<br />
5.1 Designation<br />
Allocated Housing Site – policy Hr16<br />
Countryside beyond the Green Belt (Riverside Green Chain)<br />
Grade II listed building<br />
5.2 The South East Plan 2009<br />
Spatial Strategy<br />
Cross-Cutting Policies<br />
Housing<br />
Natural Resource Management<br />
Gatwick<br />
SP3<br />
CC4, CC6<br />
H1, H2, H4, H5<br />
NRM10, NRM11<br />
GAT1, GAT2, GAT3<br />
5.3 <strong>Reigate</strong> & <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005<br />
L<strong>and</strong>scape & Nature Conservation<br />
Heritage Sites<br />
Pc2G, Pc4, Pc5<br />
Pc8, Pc9<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Housing<br />
Recreation<br />
Utilities<br />
Movement<br />
Shopping<br />
Employment<br />
Horley Master Plan<br />
Ho2, Ho3, Ho9, Ho9A, Ho10, Ho13,<br />
Ho20<br />
Re2, Re3, Re4, Re5, Re6, Re8<br />
Ut1, Ut3, Ut4<br />
Mo4, Mo5, Mo6, Mo7, Mo9, Mo11,<br />
Mo12, Mo13<br />
Sh1, Sh2, Sh5, Sh10<br />
Em1, Em2, Em3<br />
Hr1, Hr2, Hr2A, Hr2B, Hr3, Hr16,<br />
Hr17, Hr19, Hr20, Hr21, Hr23, Hr24,<br />
Hr33, Hr36, Hr37, Hr38<br />
5.4 Other Material Considerations<br />
Planning Policy Statements/Guidance<br />
Supplementary Planning Guidance<br />
Other<br />
PPS1, PPS3, PPS5, PPS7, PPS9,<br />
PPG13, PPS23, PPS25<br />
Horley Design Guide<br />
Surrey Design<br />
Local Distinctiveness Design Guide<br />
A Parking Strategy for Surrey<br />
Parking St<strong>and</strong>ards for Development<br />
Affordable Housing<br />
Outdoor Playing Space Provision<br />
By Design<br />
The Manual for Streets<br />
Design Bulletin 32<br />
Places Streets <strong>and</strong> Movements<br />
Human Rights Act 1998<br />
6.0 Assessment<br />
6.1 The principle of the development of a new neighbourhood in this location<br />
was set with the adoption of the 2005 <strong>Borough</strong> Local Plan. The impact of the<br />
neighbourhood on the wider environment was assessed further in the context<br />
of the outline application, 04/01778/OUT, approved in September 2006 with<br />
an accompanying legal agreement that secured a package of planning<br />
benefits totalling some £30 million.<br />
6.2 This application seeks approval for the layout, scale, appearance <strong>and</strong><br />
l<strong>and</strong>scaping of the second phase of the development. The outline planning<br />
permission was accompanied by 56 planning conditions, many of which had<br />
several sub-sections requiring separate submissions. The majority have now<br />
been satisfied although their audit has proved onerous for both the applicant<br />
<strong>and</strong> the <strong>Council</strong>. In order to reduce the administrative burden it is proposed<br />
to re-impose relevant conditions on this permission, but with simpler<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
wording that requires compliance rather than submissions where possible.<br />
This would allow the <strong>Council</strong> better management of the site, including<br />
enforcement where necessary, whilst removing unnecessary constraints for<br />
the development. The main issues to consider are therefore:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Siting <strong>and</strong> layout - design appraisal<br />
Scale <strong>and</strong> appearance of buildings<br />
Open space <strong>and</strong> l<strong>and</strong>scaping<br />
Affordable Housing<br />
Neighbour amenity<br />
Transport <strong>and</strong> parking issues<br />
Flood risk<br />
Renewable energy<br />
Contamination<br />
Siting <strong>and</strong> layout<br />
6.3 The proposed siting <strong>and</strong> layout of the development follows current good<br />
practice on appropriate design principles as set out in a range of design<br />
guidance documents including national guidance in By Design <strong>and</strong> The<br />
Manual for Streets; the County-wide guidance in Surrey Design; <strong>and</strong> the<br />
<strong>Borough</strong> <strong>Council</strong>’s own design documents - the Horley Design Guide <strong>and</strong> the<br />
Local Distinctiveness Design Guide.<br />
6.4 The road network encompasses a hierarchy of roads, from the main<br />
distributor road where pedestrians <strong>and</strong> vehicles are separated, through to<br />
mews courtyards <strong>and</strong> private drives where they are not. This hierarchy<br />
presents a flexible choice of routes for users.<br />
6.5 The three recommended areas of the “neighbourhood core”, the “transitional<br />
area” <strong>and</strong> the “countryside edge” are clearly evident with changes in<br />
densities, building heights, types <strong>and</strong> spacings that define these areas, as<br />
encouraged in the guidance documents.<br />
6.6 The creation of smaller areas within the character areas has been achieved in<br />
particular with two main squares <strong>and</strong> the neighbourhood centre. The use of<br />
three-storey buildings, large grassed verges <strong>and</strong> raised tables with varying<br />
surface paving help to punctuate <strong>and</strong> provide legibility within the<br />
development. The extra care home would be the largest building within the<br />
development <strong>and</strong> buildings around it have been designed to provide a<br />
transition to the more domestic form, again creating a townscape with<br />
reference points that would help future users find their way.<br />
6.7 Parking provision on a development of this size could detract from the<br />
overall quality <strong>and</strong> character of a scheme if not carefully positioned. The<br />
design guidance encourages various methods to prevent parking dominated<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
developments. This scheme is considered to be successful for the most part<br />
in achieving this. Parking spaces would be hidden from main street<br />
frontages wherever possible, either to the side of properties, in rear<br />
courtyards, or in buildings with flats over. These methods follow the<br />
recognised principles in both Surrey Design <strong>and</strong> the Horley Design Guide.<br />
There are instances where a number of spaces are situated to the front of<br />
dwellings, but these would be either tucked away within the development or<br />
surrounded by good levels of l<strong>and</strong>scaping, <strong>and</strong> this arrangement would not<br />
therefore have such an impact to the visual amenities of the wider area as to<br />
be detrimental.<br />
6.8 In response to concerns over a potential shortfall in visitor parking,<br />
additional on-street bays have been added <strong>and</strong> the open space in the<br />
neighbourhood centre could be re-designed to provide further parking.<br />
These aspects would help discourage inappropriate on-street parking that<br />
might obstruct the main road. It is likely that visitor parking will still occur<br />
on the roads at certain points, but the road widths have been designed for<br />
this <strong>and</strong> for space to still be available for other vehicles to pass.<br />
6.9 The buildings about the neighbourhood centre would fit in well with the<br />
character of the converted barn <strong>and</strong> would provide an attractive facility for<br />
residents. The current arrangement is for two office units <strong>and</strong> three retail<br />
units with flats above. During the course of the application central chimneys<br />
have been added to allow for ducting/ventilation equipment to be<br />
sympathetically incorporated into the building.<br />
6.10 The conversion of the barn appears externally to generally be acceptable.<br />
However further details of the final external <strong>and</strong> internal appearance are<br />
required, so a condition can require a method statement with further detail.<br />
However, it should also be noted that more detailed control will be exercised<br />
through the necessary application for listed building consent for these works.<br />
6.11 The school is to be h<strong>and</strong>ed to Surrey County <strong>Council</strong> toward the end of the<br />
year (in or after September), <strong>and</strong> no details of its layout or elevations are<br />
established. The master plan however does show a main vehicular entrance<br />
from the spine road <strong>and</strong> also a pedestrian entrance from the neighbourhood<br />
centre into the school site. This should spread the congestion associated with<br />
dropping off/picking up children <strong>and</strong> help the vitality of the neighbourhood<br />
centre.<br />
6.12 All these elements of the layout are in accordance with the design principles<br />
set out in the guidance documents.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Scale <strong>and</strong> Appearance of Buildings<br />
6.13 Subsequent to amendments by the applicants the appearance of the buildings<br />
are now consistent with phase one. Proposed dwellings are of a traditional<br />
form in an attempt to echo positive characteristics elsewhere in Horley.<br />
These range from two to three storeys in height, some with rooms in the roof<br />
<strong>and</strong> would be set in rows of terraces, semi-detached pairs or larger detached<br />
plots. Variation in the street scene would be achieved by the presence of<br />
rows of dwellings rounding corners, the inclusion of gables <strong>and</strong> carriageway<br />
arches, <strong>and</strong> changing ridge heights to provide a visual break in the expanses<br />
of built form. External finishes would display a range of combinations<br />
throughout the dwellings but the palette includes brickwork, tile hanging or<br />
weatherboarding <strong>and</strong> render, with detailing to certain features on the<br />
dwellings to add interest. Roof materials would be either tile or slate. The<br />
windows <strong>and</strong> doors would have a vertical emphasis <strong>and</strong> either white sash or<br />
casement form, <strong>and</strong> some properties would have chimneys. Again all of<br />
these materials <strong>and</strong> styles are in line with the advice in the Horley Design<br />
Guide <strong>and</strong> are characteristic of properties within the local area. The use of a<br />
condition can ensure the use of sliding sash on the front elevations of<br />
dwellings where this style is shown, <strong>and</strong> the use of wooden frame windows<br />
in sensitive locations.<br />
6.14 The extra care home would be appropriately articulated with recessed areas,<br />
gables <strong>and</strong> barn hip roofs <strong>and</strong> be finished in brick <strong>and</strong> tile hanging. It has<br />
been reduced in scale from the original submission so that there is spacing<br />
about it for some soft l<strong>and</strong>scaping. Although a large building that would be<br />
visible in longer views, it is well designed <strong>and</strong> would sit well in its location,<br />
relatively central within the overall phase one/phase two development.<br />
6.15 Other affordable housing is also designed to the same specification <strong>and</strong><br />
appearance as the market housing. This would ensure no obvious distinction<br />
between affordable or market units.<br />
6.16 It is clear that the quality of materials will play a key role in the success of the<br />
finished character <strong>and</strong> appearance of the development. The materials palette<br />
has been established <strong>and</strong> is ensured by condition to ensure the highest<br />
quality is achieved.<br />
Open Space <strong>and</strong> L<strong>and</strong>scaping<br />
6.17 The layout of the scheme has been designed to ensure that a number of<br />
mature tree belts intersecting the site will be retained. To ensure their<br />
protection <strong>and</strong> make the most of their l<strong>and</strong>scape value, a five-metre buffer<br />
zone is proposed around each tree belt, which is considered appropriate.<br />
These retained tree belts would contribute to the character <strong>and</strong> appearance of<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
the development in the form of green avenues <strong>and</strong> wildlife corridors. This is<br />
a principle that is again encouraged in the design documents.<br />
6.18 Another l<strong>and</strong>scape feature that would make an important contribution to the<br />
character <strong>and</strong> sense of identity of the development is the swales that would<br />
be created as part of the SuDS system. Their final design is yet to be<br />
approved but their general location is shown on the master plan <strong>and</strong> final<br />
details are progressing in consultation with the <strong>Council</strong>. The layout of the<br />
scheme integrates with the location of the swales, which follow the northsouth<br />
line of the tree belts in “green corridors” as part of the drainage<br />
strategy for the neighbourhood. The illustrative details on the submitted<br />
plans indicate that the l<strong>and</strong>scaping proposals will include new tree planting<br />
along the swales.<br />
6.19 The l<strong>and</strong>scaping plans show consistency with a framework plan for the site<br />
as a whole, so that planting in both phases one <strong>and</strong> two appears as one<br />
logical scheme throughout that complements the housing. This would<br />
include structural planting of trees <strong>and</strong> hedging within the development <strong>and</strong><br />
also in an area between housing <strong>and</strong> the southern boundary that is a<br />
minimum of five metres in depth. This would provide a buffer zone to<br />
alleviate the appearance of the development <strong>and</strong> which, over time, would<br />
establish <strong>and</strong> maintain the characteristics of Langshott.<br />
6.20 The Riverside Green Chain is a b<strong>and</strong> of informal open space curving round<br />
the northern boundaries of the whole sector, which will provide accessible<br />
public open space, including a spine path suitable for cyclists <strong>and</strong><br />
pedestrians. It formed an integral part of the master plan within the outline<br />
application <strong>and</strong> its details were approved under 04/01778/RM1. The more<br />
localised play space provision would be by way of one large Local Area for<br />
Play (super LAP), sited close to the southern boundary by the community<br />
centre <strong>and</strong> a normal Local Equipped Area for Play (LEAP) to the north, close<br />
to the Green Chain. Both would have some overlooking from properties to<br />
provide natural surveillance <strong>and</strong> they would incorporate a range of play<br />
equipment, although the one by the community centre would only have<br />
features such as stepping stones or logs for children to play on. This is to aid<br />
the setting of the listed barn. This level of provision would ensure that the<br />
community is no more than 10 to 15 minutes walk from such facilities.<br />
Affordable Housing<br />
6.21 The proposed layout includes 71 affordable units, which equates to<br />
approximately a 25% provision as required by the legal agreement attached<br />
to the outline permission. Sixty units would be within the extra care scheme<br />
<strong>and</strong> consist of social rented <strong>and</strong> affordable leasehold properties, while the<br />
eleven units about the neighbourhood centre (plots 448-458) would be<br />
allocated as social rented housing <strong>and</strong> range from two-bed to four-bed<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
properties. Having taken advice from the <strong>Council</strong>’s Housing Development<br />
Manager, I am satisfied that this would be a satisfactory arrangement in<br />
terms of tenure split <strong>and</strong> their location.<br />
6.22 The Housing Manager has confirmed that there is a need for an extra care<br />
facility within the <strong>Borough</strong> <strong>and</strong> it was envisaged that it would be built within<br />
the North West Sector, which has yet to gain detailed planning approval. The<br />
early introduction of this is welcomed, but as the applicant has not yet<br />
secured an end user for the facility it will be necessary to reserve other parts<br />
of the site for affordable housing in case it does not go ahead. This shall be<br />
secured by a deed of variation to the original Section 106 on the site,<br />
which is currently being drafted.<br />
6.23 Concern has been raised over the layout of the extra care scheme <strong>and</strong> the<br />
internal arrangements of some of the three-bed units, which would be<br />
identical to the four-bed units but with a study in lieu of a bedroom. The<br />
reason for this is that the applicant needs to provide dwellings of appropriate<br />
scale about the neighbourhood centre, resulting in larger units. They are<br />
firmly of the view that these dwellings will be acceptable to a Registered<br />
Social L<strong>and</strong>lord <strong>and</strong> so have not altered the layouts, but the Housing<br />
Manager maintains that this may be an issue. The development must<br />
provide 25% affordable units, ensured by legal agreement, so it is in the<br />
applicant’s interest to design appropriate units. With this in mind I am<br />
inclined to accept the layouts provided. If they were found to be<br />
unacceptable for an end user then an amendment to the permission would be<br />
needed, which could occur at a later date.<br />
Neighbour Amenity<br />
6.24 The proposed layout has been designed so as to afford acceptable levels of<br />
amenity for all future occupants. All dwellings would be of sufficient size<br />
with adequately sized gardens. The majority of dwellings would benefit<br />
from a separate rear access to their gardens. The layout has been assessed by<br />
the Architectural Liaison Officer for Surrey Police in terms of crime<br />
prevention, <strong>and</strong> he is satisfied that there are no obvious areas that might<br />
encourage crime.<br />
6.25 The flats <strong>and</strong> flats over garages have little or no private amenity space.<br />
However this is acceptable given the scale <strong>and</strong> type of units <strong>and</strong> the provision<br />
of various forms of public open space available for use within close<br />
proximity.<br />
6.26 The overall layout <strong>and</strong> siting of dwellings has been designed to avoid any<br />
unacceptable overlooking between new dwellings. Where windows would<br />
face one another, or neighbouring gardens, they would be to rooms that<br />
could be obscure glazed to prevent loss of privacy. Dwellings would be sited<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
to avoid any unacceptable level of overshadowing or overbearing impact to<br />
the detriment of future occupants’ amenities. The resulting relationship<br />
between dwellings is one that is to be expected on a residential development<br />
of this scale. The design concept of a number of perimeter blocks of<br />
development <strong>and</strong> the moderate density of dwellings would combine to<br />
ensure a neighbourly relationship is maintained for new residents. Permitted<br />
development rights for extensions were removed by condition 10 of the<br />
outline permission.<br />
6.27 In some instances retained trees would overhang rear gardens or be in close<br />
proximity to dwellings. However any impact is not felt to be so great as to<br />
significantly detract from the amenity <strong>and</strong> enjoyment of these properties.<br />
6.28 The neighbourhood centre <strong>and</strong> school site would be near to some dwellings<br />
on Langshott. The neighbourhood centre is a sufficient distance from these<br />
properties to prevent any significant impact <strong>and</strong> a right of way has been<br />
retained for Tanyard Farm Cottage. The final layout of the school shall<br />
require a future application <strong>and</strong> such issues will be taken into account then.<br />
6.29 The construction phase is an inevitable part of any development. Other<br />
legislation exists to ensure that neighbours do not endure excessive levels of<br />
disturbance. The introduction of housing within the urban area is also not<br />
something that would lead to unusual levels of noise or disturbance.<br />
Transport <strong>and</strong> Parking<br />
6.30 The provision of the Fastway bus link through the neighbourhood is a major<br />
factor in encouraging a shift away from the private car to more sustainable<br />
forms of transport. The Fastway bus will enter the site from Langshott <strong>and</strong><br />
will curve through the middle of phases one <strong>and</strong> two, ending at the<br />
neighbourhood centre where it will then exit onto Langshott again. There<br />
will be no access or egress point for other vehicles onto or from Langshott at<br />
this point, a matter that was determined at the outline stage. The traffic<br />
implications of this development are consistent with the wider assessment<br />
made as part of the Local Plan process <strong>and</strong> through the outline application.<br />
6.31 A legible <strong>and</strong> direct network of pedestrian <strong>and</strong> cycle routes is planned as part<br />
of the development, the details of which are to be approved by way of<br />
conditions. This network will provide links both within the development<br />
<strong>and</strong> to the town centre <strong>and</strong> surrounding areas. The neighbourhood has been<br />
designed to encourage pedestrian <strong>and</strong> cycle flows by ensuring that motor<br />
vehicle routes do not dominate the layout or permeability of the site. The<br />
occupants of the dwellings would have the opportunity for cycle storage<br />
either by way of garage provision or private amenity space in which to create<br />
storage.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
6.32 The Head of Neighbourhood Services has expressed concern over the lack of<br />
turning head to some roads, <strong>and</strong> requested that bollards or l<strong>and</strong>scaped areas<br />
proposed to prevent through-flow of traffic (such as to the front of units 322<br />
<strong>and</strong> 367) should be removed to allow a through route for refuse lorries. This<br />
is a reasonable request that would also improve permeability so the use of<br />
condition can require this. Refuse lorries may reverse down other small culde-sacs<br />
<strong>and</strong> a bin collection point to units 313 <strong>and</strong> 314 is too far for collection.<br />
As it only serves two units it is reasonable to expect the owners to bring<br />
their bins to the kerbside. In addition a request for strengthened corners was<br />
made <strong>and</strong> clarification as to where bins will be put out. Although this cannot<br />
be required by condition, an informative shall relay this information to the<br />
applicant.<br />
6.33 The road system has been designed in line with highway advice <strong>and</strong> design<br />
principles in the guidance documents. The main internal distributor road<br />
(the spine road) would include a footpath on both sides <strong>and</strong> raised tables as<br />
traffic calming measures. The road hierarchy meets the required st<strong>and</strong>ards of<br />
the technical annex to Surrey Design <strong>and</strong> is therefore acceptable.<br />
6.34 The proposal incorporates a total of 447 parking spaces, including 49 visitor<br />
spaces. The visitor spaces would discourage on street parking, particularly<br />
on the spine road. The allocated parking spaces would be provided in<br />
either garages or hard st<strong>and</strong>ing spaces, many in a t<strong>and</strong>em arrangement, <strong>and</strong><br />
would achieve two spaces per unit for the majority of the development. The<br />
smaller/affordable units would achieve one space per dwelling <strong>and</strong> many of<br />
the larger units would have an allocation of four spaces per dwelling. The<br />
applicants have learned from issues within phase one with many of the<br />
parking spaces actually wider than the common st<strong>and</strong>ard so as to<br />
accommodate modern, larger vehicles, <strong>and</strong> garage doors would also be wider<br />
(ensured by condition) to make their use more common.<br />
6.35 Although the parking provision is below the maximum st<strong>and</strong>ard, it must be<br />
recognised that 60 of the dwellings will be contained within the extra care<br />
scheme, which generally requires less parking provision, so overall the<br />
parking allocation per unit is much improved on that within phase one. The<br />
level of parking is also expected to increase with the re-design of the<br />
central green, which is to be reserved by condition, <strong>and</strong> the applicant<br />
has indicated that they are seeking to provide a further 10 visitor spaces<br />
along the spine road. It is expected that some on-street parking shall still<br />
occur, but road widths have been designed to take this into account <strong>and</strong> still<br />
allow for the free flow of traffic.<br />
Flood Risk<br />
6.36 The residential development is sited beyond the identified 1:100 year <strong>and</strong><br />
1:100 year +20% flood plains, an issue that was addressed prior to the outline<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
permission being granted. In addition to this, the slab level of all dwellings is<br />
to be built at least to the 1:100 year + 20% level to account for any uncertainty<br />
associated with climate change. The proposed SuDS as discussed earlier are<br />
intended to manage <strong>and</strong> discharge any flood water generated from<br />
impermeable areas. Accordingly the <strong>Council</strong>’s Drainage Engineer has no<br />
objection to this application.<br />
6.37 Although the SuDS system does not form part of this application, they are<br />
shown on the master plan <strong>and</strong> it is expected that their layout will not alter<br />
significantly from this. In order to ensure that the completed SuDS system<br />
has been built in accordance with the approved plans, the appropriate<br />
drainage condition can require a final survey of the system to be submitted<br />
to <strong>and</strong> approved in writing by the Local Planning Authority.<br />
6.38 The Environment Agency has expressed objection to the scheme because the<br />
final detail of the drainage strategy was not included within the application<br />
<strong>and</strong> there are some issues with the submitted flood risk assessment. It is,<br />
however, satisfied that a sustainable drainage strategy may be achieved <strong>and</strong><br />
that this can be controlled by condition. It is expected that the Agency<br />
will shortly withdraw its objection <strong>and</strong> an update on this will be reported to<br />
the meeting.<br />
Renewable energy<br />
6.39 The application includes the positions of solar panels to provide water<br />
heating <strong>and</strong> air source heat pumps that would generate 10% of the energy<br />
requirements of the development by renewable sources.<br />
6.40 The outline permission was granted with condition 18 requiring either details<br />
of a combined heat <strong>and</strong> power (CHP) plant or a statement indicating why<br />
such a facility cannot be provided. Throughout pre-application discussions<br />
officers repeatedly stated the need for this to be given serious consideration.<br />
However, the applicant has chosen the latter requirement of condition 18 <strong>and</strong><br />
is preparing an energy report indicating why a CHP plant is not practical in<br />
this instance, which will be considered carefully <strong>and</strong> critically, taking account<br />
of opportunities to serve development within phase one also. The applicant’s<br />
initial comments dismiss combined heat <strong>and</strong> power for the following reasons:<br />
<br />
<br />
<br />
The density of development is low to medium;<br />
Residential accommodation does not provide a constant energy dem<strong>and</strong>;<br />
<strong>and</strong><br />
The build out of residential units would be linked entirely to market<br />
dem<strong>and</strong>, increasing technical <strong>and</strong> financial risk to energy service<br />
investors <strong>and</strong> rendering efficiencies extremely low during early phases of<br />
development.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
6.41 As the planning condition provides the option not to provide a CHP plant,<br />
<strong>and</strong> the development will still provide renewable energy that is in line with<br />
the South East Plan, this will need to be the subject of further detailed<br />
consideration.<br />
Contaminated L<strong>and</strong><br />
6.42 A desk study, site investigation report <strong>and</strong> remedial action plan for phase<br />
two of the Horley North East Sector were produced in November 2006. The<br />
site investigation report identified the presence of ground gases <strong>and</strong> material<br />
impacted by contamination in the Tanyard Farm area of the site. Details<br />
presented in the remediation action plan to address the contamination<br />
that was identified were vague <strong>and</strong> did not take into account the proposed<br />
layout of the site.<br />
6.43 In order to maintain control of works to address the contamination identified<br />
in the area of Tanyard Barn, it is necessary that future investigation <strong>and</strong>/or<br />
remediation works are agreed with the Local Planning Authority prior to<br />
such works being undertaken <strong>and</strong> development commencing in this area. A<br />
validation/closure report to record the works undertaken to ensure that the<br />
site was suitable for its proposed use will also be required prior to the<br />
development being occupied.<br />
CONDITIONS<br />
Pre-Commencement Conditions<br />
1. No development shall take place until a Construction Method Statement has<br />
been submitted to <strong>and</strong> approved in writing by the Local Planning Authority.<br />
Development shall be carried out only in accordance with the approved<br />
Construction Method Statement, which shall include details of:<br />
Highway Matters<br />
(a) Parking for vehicles of site personnel, operatives <strong>and</strong> visitors;<br />
(b) A programme of works (including measures for traffic management);<br />
(c) The provision of boundary hoarding in accordance with the details<br />
contained within the Construction Method Statement, Phase 1<br />
document prepared by Terry Ship on behalf of Barratt Wates <strong>and</strong> dated<br />
20 May 2008, Version 1;<br />
Flora <strong>and</strong> Fauna<br />
(d) Protection of existing fauna identified for retention, as detailed within<br />
the Environmental Statement;<br />
Environmental Health<br />
(e)<br />
Measures to prevent ground water contamination pollution; <strong>and</strong><br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
(f)<br />
Construction related pollution prevention measures<br />
Reason:<br />
In order that the development should not prejudice highway safety nor cause<br />
inconvenience to other highway users <strong>and</strong> to preserve <strong>and</strong> enhance the visual<br />
amenities of the locality, whilst ensuring that the development will not cause<br />
harm to human health or pollution of controlled waters, with regard to <strong>Reigate</strong><br />
<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9, Mo7 <strong>and</strong> PPS23, <strong>and</strong> in<br />
order that the impacts of the development are mitigated in accordance with<br />
the Environmental Statement.<br />
2. No development shall take place until a Quality Assurance Protocol <strong>and</strong><br />
Methodology has been submitted to <strong>and</strong> been approved in writing by the<br />
Local Planning Authority. The Protocol <strong>and</strong> Methodology shall include<br />
details of <strong>and</strong> provide for the following matters:<br />
(a) The measures to be put in place by the developers to ensure that the<br />
development is carried out <strong>and</strong> constructed <strong>and</strong> the permission<br />
implemented in accordance with the approved plans <strong>and</strong> details <strong>and</strong><br />
in accord with the imposed conditions,<br />
(b) Arrangements for the holding of regular bi-monthly liaison meetings<br />
between representatives of the developer, their contractors as<br />
necessary, <strong>and</strong> the Local Planning Authority to review progress <strong>and</strong><br />
compliance with this permission <strong>and</strong> subsequently approved details,<br />
(c) The procedure to be followed by the developer as regards notification<br />
to the Local Planning Authority in the event that changes become<br />
necessary to the approved development or details or become known to<br />
(d)<br />
have been carried out,<br />
Contact details for those representatives of the developer who have<br />
responsibility for the monitoring <strong>and</strong> implementation of the<br />
development, including ongoing construction works on site <strong>and</strong><br />
quality assurance, as well as contact details in the event of an<br />
emergency or need for out of hours contact.<br />
Reason:<br />
To ensure that appropriate measures are taken to ensure that the<br />
development is carried out in accordance with the approved plans, details<br />
<strong>and</strong> conditions, <strong>and</strong> to the quality <strong>and</strong> design set out in the application<br />
documents with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005<br />
policies Ho9, Ho13, Pc4, Pc8, <strong>and</strong> National Planning Policy PPS1 <strong>and</strong> PPS3,<br />
<strong>and</strong> in order that the impacts of the development are mitigated in accordance<br />
with the Environmental Statement.<br />
3. No development shall take place until details of a Sustainable urban<br />
Drainage Scheme (SuDS) have been submitted to <strong>and</strong> been approved in<br />
writing by the Local Planning Authority. The development works shall be<br />
carried out in accordance with the approved SuDS details <strong>and</strong> a final<br />
verification survey <strong>and</strong> inspection report shall be submitted to <strong>and</strong> agreed in<br />
writing by the Local Planning Authority, prior to 50% occupation of the<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
dwelling units comprising the development the subject of this specific<br />
consent.<br />
Reason:<br />
To ensure that the site is satisfactorily drained in accordance with <strong>Reigate</strong><br />
<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4 <strong>and</strong> PPS25.<br />
4. The drainage scheme referred to in condition 2 shall include details of both<br />
existing ground levels, proposed ground levels <strong>and</strong> the proposed finished<br />
ground floor levels of the buildings. The development shall be carried out in<br />
accordance with the approved levels. All finished floor levels shall be set at<br />
no lower than 500mm above the 1 in 100 + 20% flood level.<br />
Reason:<br />
To ensure the Local Planning Authority is satisfied that the proposal would<br />
not exacerbate flood risk to existing <strong>and</strong> proposed dwellings, to ensure that it<br />
has an appropriate relationship with adjoining development <strong>and</strong> to<br />
safeguard the visual amenities of the locality with regard to <strong>Reigate</strong> <strong>and</strong><br />
<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ho9 <strong>and</strong> Ut3.<br />
5. No development shall take place until:<br />
(a)<br />
(b)<br />
An archaeological evaluation has been carried out in accordance with a<br />
methodology submitted to <strong>and</strong> approved by the Local Planning<br />
Authority, in writing, prior to the commencement of the evalution itself;<br />
<strong>and</strong><br />
The applicant has secured the implementation of a programme of<br />
archaeological work in accordance with the recommendations of the<br />
archaeological evaluation referred to in (a) above <strong>and</strong> submitted to <strong>and</strong><br />
approved by the Local Planning Authority, in writing, prior to the<br />
commencement of the works themselves.<br />
Reason:<br />
To minimise the likelihood that any unidentified archaeology is destroyed<br />
during the construction of the development with regard to <strong>Reigate</strong> <strong>and</strong><br />
<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Pc8.<br />
6. No development shall take place until protective fencing, details of which<br />
shall be submitted to <strong>and</strong> be approved in writing by the Local Planning<br />
Authority prior to erection, has been erected around areas of identified<br />
archaeological importance to secure an area where no works shall take place.<br />
Reason:<br />
To minimise the likelihood that any unidentified archaeology is destroyed<br />
during the construction of the development with regard to <strong>Reigate</strong> <strong>and</strong><br />
<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Pc8 <strong>and</strong> in order that the impacts of<br />
the development are mitigated in accordance with the Environmental<br />
Statement.<br />
7. No development works shall take place in respect of ‘Block B’, as indicated<br />
on the plans, a specification for the full repair <strong>and</strong> restoration of Tanyard<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Barn <strong>and</strong> its setting shall be submitted to <strong>and</strong> approved in writing by the<br />
Local Planning Authority. These works shall be carried out in accordance<br />
with the agreed specification <strong>and</strong> completed in full to the satisfaction of the<br />
Local Planning Authority prior to the occupation of the final dwelling of this<br />
specific complete phase of the development. Emergency repairs to ensure the<br />
barn is wind, weather tight <strong>and</strong> stable shall be carried out within two months<br />
of this consent in accordance with details approved in writing, in advance, by<br />
the Local Planning Authority.<br />
Reason:<br />
In order to preserve the listed building in accordance with policy Pc9 of the<br />
<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />
8. Notwithst<strong>and</strong>ing the drawings hereby approved, the final detail of the<br />
‘Central Green’ shall be submitted to <strong>and</strong> approved in writing by the Local<br />
Planning Authority, prior to the commencement of the Neighbourhood<br />
Centre. The submitted details should include full specification of the<br />
recycling area (achieved in consultation with the <strong>Council</strong>’s Neighbourhood<br />
Services) <strong>and</strong> also the provision of increased visitor parking. The ‘Central<br />
Green’ area shall be completed in accordance with the approved details.<br />
Reason:<br />
In order that waste reduction <strong>and</strong> recycling is appropriately accommodated<br />
<strong>and</strong> to ensure that the development should not prejudice highway safety nor<br />
cause inconvenience to highway users, with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />
<strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Mo5.<br />
9. No development works shall take place in respect of the construction of the<br />
neighbourhood centre, until details of the fenestration <strong>and</strong> materials to be<br />
used in the facades of the shop <strong>and</strong> office units have been submitted to <strong>and</strong><br />
approved in writing by the Local Planning Authority. The development shall<br />
be completed in accordance with the approved details.<br />
Reason:<br />
In order that the development achieves a suitable appearance in line with<br />
policy Sh2 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />
accordance with the Horley Design Guide.<br />
10. Unless otherwise agreed in writing by the Local Planning Authority, no<br />
development in respect of the Tanyard Farm area of the site shall take place<br />
until parts (a) to (e) of this condition have been complied with.<br />
Site Characterisation<br />
(a)<br />
A site investigation proposal, detailing the extent <strong>and</strong> methodologies<br />
of sampling <strong>and</strong> analyses required to enable the characterisation of the<br />
plausible pollutant linkages identified in the preliminary conceptual<br />
model, shall be submitted to the Local Planning Authority <strong>and</strong> is<br />
subject to the written approval in writing of the Local Planning<br />
Authority, <strong>and</strong> any additional requirements that it may specify, prior<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
(b)<br />
to any site investigation being commenced on site. Following<br />
approval, the Local Planning Authority shall be given a minimum of<br />
two weeks written notice of the commencement of site investigation<br />
works;<br />
A site investigation <strong>and</strong> risk assessment, undertaken in accordance<br />
with the site investigation proposal as approved that determines the<br />
extent <strong>and</strong> nature of contamination on site <strong>and</strong> is reported in<br />
accordance with the st<strong>and</strong>ards of DEFRA’s <strong>and</strong> the Environment<br />
Agency’s Model Procedures for the Management of Contaminated<br />
L<strong>and</strong> (CLR 11), shall be submitted to the Local Planning Authority <strong>and</strong><br />
is subject to the approval in writing of the Local Planning Authority<br />
<strong>and</strong> any additional requirements that it may specify;<br />
Remediation<br />
(c)<br />
(d)<br />
A remediation method statement, detailing the extent <strong>and</strong> method(s)<br />
by which the site is to be remediated, to ensure that unacceptable risks<br />
are not posed to identified receptors at the site <strong>and</strong> details of the<br />
information to be included in a validation report, has been submitted<br />
to <strong>and</strong> approved in writing by the Local Planning Authority, <strong>and</strong> any<br />
additional requirements that it may specify, prior to the remediation<br />
being commenced on site. The Local Planning Authority shall then be<br />
given a minimum of two weeks written notice of the commencement<br />
of remediation works;<br />
Prior to the occupation of the development remediation works at the<br />
site shall have been completed in accordance with the approved<br />
remediation method statement <strong>and</strong> any post remediation monitoring<br />
identified in the remediation method statement shall be installed by<br />
the developer <strong>and</strong> maintained <strong>and</strong> operated for as long as identified by<br />
the remediation method statement;<br />
Submission of Validation Information<br />
(e)<br />
A comprehensive validation report for the site shall be submitted prior<br />
to occupation. The report shall detail evidence of the remediation, the<br />
effectiveness of the remediation carried out <strong>and</strong> the results of post<br />
remediation monitoring, in accordance with the approved remediation<br />
method statement <strong>and</strong> any addenda thereto, so as to enable future<br />
interested parties, including regulators, to have a single record of the<br />
remediation undertaken at the site. The validation report is subject to<br />
the approval, in writing of the Local Planning Authority <strong>and</strong> any<br />
additional requirements that it may specify;<br />
Action for Unexpected Contamination<br />
(f)<br />
Contamination not previously identified by the site investigation, but<br />
subsequently found to be present at the site, shall result in all<br />
development ceasing on site until an addendum to the remediation<br />
method statement, detailing how the unsuspected contamination is to<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
be dealt with, has been submitted in writing to the Local Planning<br />
Authority. The remediation method statement is subject to the written<br />
approval of the Local Planning Authority <strong>and</strong> any additional<br />
requirements that it may specify.<br />
Reason:<br />
To ensure that the proposed development <strong>and</strong> any site investigations<br />
<strong>and</strong> remediation will not cause harm to human health or pollution of<br />
controlled waters, with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong><br />
Local Plan 2005 Policy Ho9 <strong>and</strong> PPS23.<br />
11. No development works, including ground preparation <strong>and</strong> all construction<br />
activities, shall take place until all related arboricultural matters have been<br />
undertaken <strong>and</strong> completed in strict accordance with the approved details.<br />
This pertains to the pre-commencement site meeting <strong>and</strong> tree protection<br />
measures contained on the Tree Protection Plan (TPP) BLC110107 REV B,<br />
dated 17 February 2011 <strong>and</strong> Arboricultural Method Statement (AMS),<br />
compiled by Bourne L<strong>and</strong>scape Consultants, dated February 2011.<br />
Reason:<br />
To ensure good arboricultural practice in the interests of the maintenance of<br />
the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with policies Pc4 <strong>and</strong><br />
Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> the<br />
recommendations within British St<strong>and</strong>ard: 5837.<br />
12. No development works, including ground preparation <strong>and</strong> any<br />
construction activity, shall take place until a scheme for the arboricultural<br />
supervision <strong>and</strong> monitoring of the arboricultural method statement<br />
<strong>and</strong> tree protection measures approved <strong>and</strong> required in Condition 11 has<br />
been submitted <strong>and</strong> approved in writing by the local planning authority.<br />
The scheme shall provide timings <strong>and</strong> methods of site visits <strong>and</strong> reporting<br />
procedures.<br />
Reason:<br />
To ensure good arboricultural practice in the interests of the maintenance of<br />
the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with policies Pc4,<br />
Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> the<br />
recommendations within British St<strong>and</strong>ard 5837.<br />
Prescriptive Conditions<br />
13. All hard <strong>and</strong> soft l<strong>and</strong>scaping shall be carried out in strict accordance with<br />
the approved documents <strong>and</strong> drawings complied by Bourne L<strong>and</strong>scape<br />
Consultants, reference BLC100179-1 REV G, BLC100179-2 REV G,<br />
BLC100179-3 REV G, BLC100180-1 REV F, BLC100180-2 REV F, BLC100180-3<br />
REV F, BLC100180-4 REV F. The l<strong>and</strong>scaping work shall be completed in<br />
full accordance with the approved scheme, prior to occupation or in<br />
accordance with an implementation programme to be agreed in writing with<br />
the local planning authority.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Any trees shrubs or plants planted in accordance with this condition which<br />
are removed, die or become damaged or diseased within five years of<br />
planting shall be replaced within the next planting season by trees/shrubs of<br />
the same size <strong>and</strong> species in the same location.<br />
Reason:<br />
To ensure good arboricultural <strong>and</strong> l<strong>and</strong>scape practice in the interests of the<br />
maintenance of the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with<br />
policies Pc4, Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />
14. The development hereby permitted shall be carried out in accordance with<br />
the following approved plans:<br />
Drawing No:<br />
Rev:<br />
H5117/LP/01 -<br />
H5117/PS/008 -<br />
H5117/MPL/01<br />
H<br />
H5117/PL/01<br />
H<br />
H5117/MDL/01<br />
G<br />
H5117/ML/01<br />
G<br />
H5117/CRP/01<br />
F<br />
H5117/PP/01<br />
A<br />
H5117/SHL/01<br />
D<br />
H5117/TR/01<br />
B<br />
H5117/TR/02<br />
B<br />
BLC-1101-07<br />
B<br />
110228/DWH/BSC -<br />
BLC100179-1<br />
G<br />
BLC100179-2<br />
G<br />
BLC100179-3<br />
G<br />
BLC100180-1<br />
F<br />
BLC100180-2<br />
F<br />
BLC100180-3<br />
F<br />
BLC100180-4<br />
F<br />
S2811/01 -<br />
BLC100165 -<br />
BLC100165 #1 -<br />
BLC100165 #2 -<br />
BLC100165 #3 -<br />
BLC100165 #4 -<br />
BLC100165 #5 -<br />
BLC100165 #6 -<br />
H5117/CB/01 -<br />
H5117/SW/01 -<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
H5117/LSW/01 -<br />
H5117/GG/01 -<br />
H5117/PF/01 -<br />
H5117/PR/01 -<br />
Garages G1D -<br />
Garages G1H -<br />
Garages G2P -<br />
Garages G2H -<br />
Garages G4H -<br />
Pergola -<br />
Roof Link (Between Plots 316 & 317) -<br />
H5117/SS/01<br />
C<br />
H5117/SS/02<br />
B<br />
S2BFNTB5 Floor Plans & Elevations AS<br />
A<br />
S2BFNTH5 Floor Plans & Elevations AS<br />
A<br />
S2BFNTE5 Floor Plans & Elevations OPP<br />
A<br />
S2BFNTH5 Floor Plans & Elevations OPP<br />
A<br />
R231NTH5 Floor Plans & Elevations AS<br />
B<br />
R382NBI5 Floor Plans & Elevations AS<br />
B<br />
R382NBE5 Floor Plans & Elevations AS<br />
B<br />
R382NRE5 Floor Plans & Elevations OPP<br />
B<br />
R382NBI5 Floor Plans & Elevations OPP<br />
B<br />
R382NBE5 Floor Plans & Elevations OPP<br />
B<br />
T306NBE5 Floor Plans & Elevations AS<br />
B<br />
T306NBE5 Floor Plans & Elevations OPP<br />
B<br />
S341NRE5 Floor Plans & Elevations AS<br />
A<br />
S341NRE5 Floor Plans & Elevations OPP<br />
A<br />
R332NBE5 Floor Plans & Elevations AS<br />
B<br />
R360RHE4 Floor Plans & Elevations AS<br />
C<br />
R360BHE4 Floor Plans & Elevations OPP<br />
B<br />
R360THE4 Floor Plans & Elevations OPP<br />
C<br />
S375NBE4 Floor Plans & Elevations AS<br />
B<br />
S375NBI4 Floor Plans & Elevations AS<br />
B<br />
S375RHE4 Floor Plans & Elevations AS<br />
B<br />
S375NRI4 Floor Plans & Elevations AS<br />
B<br />
S375THI4 Floor Plans & Elevations AS<br />
B<br />
S375NBE4 Floor Plans & Elevations OPP<br />
B<br />
S375THE4 Floor Plans & Elevations OPP<br />
B<br />
R406NB-5 Floor Plans & Elevations AS<br />
B<br />
R406NB-5 Floor Plans & Elevations OPP<br />
B<br />
S433NTB5 Floor Plans & Elevations AS<br />
C<br />
S433NTB5 Floor Plans & Elevations OPP<br />
C<br />
S469NTH5 Elevations AS<br />
A<br />
S469NR-5 Elevations AS<br />
A<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
S469NTH5 / NB-5 / NR-5 / NTB5 Floor Plans AS C<br />
S469NTH5 Elevations OPP<br />
B<br />
S469NTH5 / NB-5 / NR-5 / NTB5 Floor Plans OPP C<br />
S436NT25 Elevations AS<br />
B<br />
S436NT25 Floor Plans AS<br />
B<br />
S436NT25 Elevations OPP<br />
B<br />
S436NT25 Floor Plans OPP<br />
B<br />
S436NT16 Elevations AS<br />
B<br />
S436NT16 Floor Plans AS<br />
B<br />
S436NT16 Elevations OPP<br />
B<br />
S436NT16 / NB-5 Floor Plans OPP<br />
C<br />
S436NB-5 Elevations OPP<br />
A<br />
S042NB-5 Elevations AS<br />
C<br />
S042NB-5 Floor Plans AS<br />
C<br />
S042NB-5 Elevations OPP<br />
B<br />
S042NTH5 Elevations OPP<br />
B<br />
S042NB-5 / S0421NTH5 Floor Plans OPP<br />
B<br />
S577NR-4 Elevations AS<br />
A<br />
S577NR-4 Floor Plans AS<br />
A<br />
S577NR-4 Elevations OPP<br />
A<br />
S577NR-4 Floor Plans OPP<br />
A<br />
S5BDNTH5 Elevations AS<br />
B<br />
S5BDNTB5 Elevations AS<br />
B<br />
S5BDNTB5 / S5BDNTH5 Floor Plans AS<br />
B<br />
R579NEH4 Elevations AS<br />
B<br />
R579NEH4 Plans AS<br />
B<br />
R579NEH4 Elevations OP<br />
B<br />
R579NEH4 Plans OP<br />
B<br />
S375BHE4 Floor Plans & Elevs Shown OPP<br />
B<br />
S2BFNTB5 Floor Plans & Elevs Shown OPP<br />
A<br />
BLC 110115 - 1<br />
A<br />
600, 601 A<br />
602, 603 A<br />
604, 605 C<br />
606, 607 A<br />
608, 609, 610 A<br />
611, 612 A<br />
613, 614, 615 A<br />
616, 617 A<br />
620, 621 A<br />
622, 623 A<br />
624, 625, 626 A<br />
627, 628 A<br />
629, 630 A<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
631, 632, 633 A<br />
634, 635 A<br />
636, 637 A<br />
638, 639, 640 A<br />
641, 642 A<br />
643 Rev B, 644 A<br />
645, 646 A<br />
647, 648 A<br />
651, 652 A<br />
655, 656 A<br />
659, 660 A<br />
662, 663, 664 A<br />
666, 667, 668 A<br />
671, 672 A<br />
673, 674 A<br />
675, 676 A<br />
677, 678, 679 A<br />
680, 681 A<br />
682, 683, 684, 685, 686, 687 A<br />
688, 689, 690 A<br />
691, 692, 693 A<br />
694, 695, 696 A<br />
530, 531 B<br />
532, 533, 534 B<br />
535, 536, 537 B<br />
400, 401 C<br />
Reason:<br />
In accordance with “Greater Flexibility for Planning Permissions Guidance”<br />
(DCLG) 2010.<br />
15. The development hereby permitted shall be carried out in accordance with<br />
the approved Phase 1 L<strong>and</strong>scape <strong>and</strong> Ecology Management Plan report<br />
M1273_18d, produced by Waterman CPM, dated 8 December 2008, prior to<br />
the occupation of any dwelling within the development.<br />
Reason:<br />
In order that the impacts of the development are mitigated in accordance<br />
with the Environmental Statement, <strong>and</strong> to ensure that the interests of nature<br />
conservation are preserved, in accordance with policy Pc2G of the <strong>Reigate</strong><br />
<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />
16. Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country Planning (General<br />
Permitted Development) Order 1995 (or any order revoking <strong>and</strong> re-enacting<br />
that Order, with or without modification) no domestic extensions shall be<br />
erected without the prior written approval of the Local Planning Authority.<br />
Reason:<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
To control any subsequent enlargements of dwellings in the interests of the<br />
visual <strong>and</strong> residential amenities of the locality with regard to <strong>Reigate</strong> <strong>and</strong><br />
<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Ho16.<br />
17. The integrated duct <strong>and</strong> chimney system within ‘Block A’ of the development<br />
hereby approved shall be installed in accordance with the approved details<br />
<strong>and</strong> thereafter retained.<br />
Reason:<br />
In the interests preserving <strong>and</strong> the visual amenities of the locality with regard<br />
to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Sh2.<br />
18. The shop units within the neighbourhood centre shall be restricted to Class<br />
A1 as defined by the Town <strong>and</strong> Country Planning Use Classes Order 1987 (as<br />
amended), <strong>and</strong> the office units shall not be used for Classes B2 or B8 of that<br />
order.<br />
Reason:<br />
To ensure that an appropriate mix of units is achieved for residents <strong>and</strong> that<br />
the units are not detrimental to the amenities of adjoining residents, with<br />
regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong><br />
Hr20.<br />
19. During the construction phase all liquid hydrocarbon based fuels <strong>and</strong><br />
lubricants shall be bunded to 110% of the volume of the container in which<br />
they are stored. Any container of liquid or hydrocarbon based fuels <strong>and</strong><br />
lubricants shall be stored in a secure location. All operations involving the<br />
transfer from container to vehicle or machinery (or visa versa) shall be on<br />
hard st<strong>and</strong>ing laid to a fall to a three stage interceptor.<br />
Reason:<br />
To prevent the contamination that would result in unacceptable degradation<br />
of soil quality with regard to the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan<br />
2005 policy Ho9 <strong>and</strong> in order that the impacts of the development are<br />
mitigated in accordance with the Environmental Statement.<br />
20. No spoil or materials shall be deposited or stored on that part of the site lying<br />
within the 1 in 100 year floodplain unless otherwise agreed by the Local<br />
Planning Authority.<br />
Reason:<br />
To prevent the increased risk of flooding due to impedance of flood flows<br />
<strong>and</strong> reduction of flood storage capacity with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />
<strong>Borough</strong> Local Plan 2005 policy Ut3.<br />
21. The buildings shall be constructed with finished floor levels set at no lower<br />
than 500mm above the 1 in 100 + 20% flood level.<br />
Reason:<br />
To ensure that the development is subject to minimum risk of flooding with<br />
regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut3.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
22. Unless otherwise agreed by the Local Planning Authority, there shall be no<br />
storage of materials within 8 metres of the Burstow Stream <strong>and</strong> 5 metres of all<br />
other watercourses <strong>and</strong> waterbodies on the site; these must be suitably<br />
marked <strong>and</strong> protected during development, with fencing erected on the<br />
l<strong>and</strong>ward side of the buffer zone, <strong>and</strong> there shall be no access during<br />
development within this area. There shall be no fires, dumping or tracking of<br />
machinery within this area.<br />
Reason:<br />
To reduce the impact of the proposed development on wildlife habitats<br />
upstream <strong>and</strong> downstream, including bankside habitats with regard to<br />
<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4.<br />
Note: Any proposed works within 8m of the Burstow Stream should gain<br />
permission from the Environment Agency regardless of any Local Authority<br />
permissions.<br />
23. Unless otherwise agreed by the Local Planning Authority, all water crossings<br />
shall be by clear spanning structures (from banktop to banktop) that will not<br />
impede the river corridor <strong>and</strong> allow the migration of both channel <strong>and</strong> bank<br />
species. The design should include the provision of passes for wildlife.<br />
Reason:<br />
This will maintain a continuous buffer strip <strong>and</strong> provide a corridor for the<br />
passage of wildlife <strong>and</strong> reduce the risk of pollution from run-off <strong>and</strong> flood<br />
risk with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4.<br />
24. The internal widths of the garaging hereby approved shall be no less than 2.7<br />
metres along their width, with garage doors not less than 2.3 metres wide.<br />
Reason:<br />
In order that the development should not prejudice highway safety nor cause<br />
inconvenience to other highway users with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />
<strong>Borough</strong> Local Plan 2005 policy Mo7.<br />
25. Notwithst<strong>and</strong>ing the drawings hereby approved, the proposed external<br />
finishing materials <strong>and</strong> details shall be carried out using those specified<br />
below <strong>and</strong> there shall be no variation without the prior approval in writing<br />
of the Local Planning Authority:<br />
(a) All casements shall have casements in each opening <strong>and</strong> glazing bars of<br />
traditional profile;<br />
(b) All horizontally divided windows with public elevations shall be<br />
vertically sliding sashes with glazing bars of traditional profile, set back<br />
behind the reveal at one brick depth;<br />
(c) All box ends shall be omitted; <strong>and</strong><br />
(d) All windows in brickwork shall have gauged brick arches.<br />
Reason:<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
In order that the development achieves a suitable appearance in line with<br />
policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />
accordance with the Horley Design Guide.<br />
26. Units 302-309 shall have wooden, vertically sliding sash windows with<br />
glazing bars of traditional profile, set back behind the reveal at one brick<br />
depth on their public elevations.<br />
Reason:<br />
In order to aid in defining these dwellings as l<strong>and</strong>mark buildings at a focal<br />
point within the development <strong>and</strong> increase legibility of the neighbourhood,<br />
in accordance with policies Ho9 <strong>and</strong> Ho13 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />
<strong>Borough</strong> Local Plan 2005, <strong>and</strong> the Horley Design Guide.<br />
27. The development hereby permitted shall be finished utilising the materials<br />
palette permitted under reference 04/01778/DET09, discharged by letter<br />
dated 27 November 2008.<br />
Reason:<br />
To ensure that a satisfactory external appearance is achieved of the<br />
development with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local 2005<br />
policies Ho9 <strong>and</strong> Ho13.<br />
28. Notwithst<strong>and</strong>ing the drawings hereby permitted, the bollards <strong>and</strong><br />
l<strong>and</strong>scaping shown on the Masterplan to the front of plots 322, 362 <strong>and</strong> 387<br />
shall be omitted to allow the through flow of vehicular traffic.<br />
Reason:<br />
To improve the permeability of the site for both residents <strong>and</strong> service<br />
vehicles, in accordance with policy Ho9 <strong>and</strong> the Surrey Design Guide.<br />
29. Notwithst<strong>and</strong>ing the plans hereby approved, the garden boundary treatment<br />
for units 300 <strong>and</strong> 302 where they border the swale shall be 1.8 metre brick<br />
screen wall.<br />
Reason:<br />
In order that the development achieves a suitable appearance in line with<br />
policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />
30. The shop units hereby permitted shall only be open between 08.00hrs-<br />
23.00hrs unless otherwise approved in writing by the Local Planning<br />
Authority.<br />
Reason:<br />
To control activity in the interests of neighbouring residential amenities<br />
with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Sh2.<br />
Pre-Occupation Conditions<br />
32. No dwelling shall be occupied until a waste strategy has been submitted to<br />
<strong>and</strong> approved by the Local Planning Authority. This strategy will be<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
implemented as approved, subject to any amendments agreed with the Local<br />
Planning Authority. The strategy shall include the incorporation of recycling<br />
facilities at the neighbourhood centre <strong>and</strong> measures to promote recycling <strong>and</strong><br />
waste minimisation throughout the development.<br />
Reason:<br />
To encourage waste reduction <strong>and</strong> recycling wherever possible in accord<br />
with policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />
order that the impacts of the development are mitigated in accordance with<br />
the Environmental Statement.<br />
33. Before the first <strong>and</strong> each subsequent occupation of the school the subject of<br />
the application, a Travel Plan, in accordance with the aims <strong>and</strong> objectives of<br />
PPG13, shall be submitted to <strong>and</strong> approved in writing by the Local Planning<br />
Authority. This shall be implemented in accordance with the details to be<br />
submitted <strong>and</strong> thereafter retained <strong>and</strong>/or amended to the satisfaction of the<br />
Local Planning Authority.<br />
Reason:<br />
In recognition of <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> 2005 policy Mo7 <strong>and</strong><br />
Planning Policy Guidance Note 13 – Transport.<br />
34. Prior to the occupation of any dwelling within the specific phase of<br />
development hereby permitted a l<strong>and</strong>scape, drainage <strong>and</strong> ecology<br />
management plan for the development shall be submitted to <strong>and</strong> be<br />
approved in writing by the Local Planning Authority. The submitted details<br />
of the management plan shall include long term design objectives,<br />
management responsibilities <strong>and</strong> maintenance schedules for all l<strong>and</strong>scape<br />
areas, drainage areas, the scheduled ancient monument at Scotchman's<br />
Copse, the community hall <strong>and</strong> any other spaces which are to remain in joint<br />
private ownership, (other than small, privately owned, domestic gardens).<br />
The l<strong>and</strong>scape, drainage <strong>and</strong> ecology management plan shall be carried out<br />
<strong>and</strong> implemented in full accordance with the approved details.<br />
Reason:<br />
To preserve <strong>and</strong> enhance the visual amenities of the locality with regard to<br />
<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Ut2 <strong>and</strong> in<br />
order that the impacts of the development are mitigated in accordance with<br />
the Environmental Statement.<br />
35. Prior to 50% occupation of the dwellings within the specific phase of<br />
development hereby permitted, a detailed design shall be submitted to the<br />
Local Planning Authority for a local network of pedestrian <strong>and</strong> cycle routes<br />
which shall include the following:<br />
(a) Provision of appropriate signage <strong>and</strong> directional indicators; <strong>and</strong><br />
(b) The provision of safe crossings between the spine network <strong>and</strong> new<br />
access roads within the development, into the existing urban area, <strong>and</strong><br />
the areas identified in the Local Plan.<br />
Reason:<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
To ensure the provision of a local network of pedestrian <strong>and</strong> cycle routes <strong>and</strong><br />
encourage a modal shift away from private car usage as an integral part of<br />
comprehensive development proposals in Horley with regard to <strong>Reigate</strong> <strong>and</strong><br />
<strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> Local Plan 2005 policy Hr23.<br />
INFORMATIVES<br />
1. Your attention is drawn to the safety benefits of installing sprinkler systems<br />
as an integral part of new development. Further information is available at<br />
www.firesprinklers.info.<br />
2. The applicant is advised that prior to the initial occupation of any communal<br />
dwellings or flats, wheeled refuse bins conforming to British St<strong>and</strong>ard<br />
BSEN840, separate recycling bins for paper/card <strong>and</strong> mixed cans, <strong>and</strong><br />
storage facilities for the bins should be installed by the developer prior to the<br />
initial occupation of any dwelling hereby permitted. Further details on the<br />
required number <strong>and</strong> specification of wheeled bins <strong>and</strong> recycling boxes is<br />
available from the <strong>Council</strong>’s Neighbourhood Services on 01737 276501 or<br />
01737 276097, or on the <strong>Council</strong>’s website at www.reigate-banstead.gov.uk.<br />
Bins <strong>and</strong> boxes meeting the specification may be purchased from any<br />
appropriate source, including the <strong>Council</strong>’s Neighbourhood Services Unit on<br />
01737 276775.<br />
3. You are advised that the <strong>Council</strong> will expect the following measures to be<br />
taken during any building operations to control noise, pollution <strong>and</strong> parking:<br />
(a) Work that is audible beyond the site boundary should only be carried out<br />
between 08:00hrs to 18:00hrs Monday to Friday, 08:00hrs to 13:00hrs<br />
Saturday <strong>and</strong> not at all on Sundays or any Public <strong>and</strong>/or Bank Holidays;<br />
(b) The quietest available <strong>item</strong>s of plant <strong>and</strong> machinery should be used on<br />
site. Where permanently sited equipment such as generators are<br />
necessary, they should be enclosed to reduce noise levels;<br />
(c) Deliveries should only be received within the hours detailed in (a) above;<br />
(d) Adequate steps should be taken to prevent dust-causing nuisance beyond<br />
the site boundary. Such uses include the use of hoses to damp down<br />
stockpiles of materials, which are likely to generate airborne dust, to<br />
damp down during stone/slab cutting; <strong>and</strong> the use of bowsers <strong>and</strong> wheel<br />
washes;<br />
(e) There should be no burning on site;<br />
(f) Only minimal security lighting should be used outside the hours stated<br />
above; <strong>and</strong><br />
(g) Building materials <strong>and</strong> machinery should not be stored on the highway<br />
<strong>and</strong> contractors’ vehicles should be parked with care so as not to cause an<br />
obstruction or block visibility on the highway.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
Further details of these noise <strong>and</strong> pollution measures can be obtained from<br />
the <strong>Council</strong>’s Environmental Health Services Unit.<br />
In order to meet these requirements <strong>and</strong> to promote good neighbourliness,<br />
the <strong>Council</strong> recommends that this site is registered with the Considerate<br />
Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration.<br />
4. The permission hereby granted shall not be construed as authority to carry<br />
out works on the highway. The applicant is advised that a licence must be<br />
obtained from the Highway Authority Local Transportation Service before<br />
any works are carried out on any footway, footpath, carriageway, verge or<br />
other l<strong>and</strong> forming part of the highway.<br />
5. Refuse areas should be no further than 9 metres from the highway on a level<br />
hard st<strong>and</strong>ing with a drop down kerb in order to be collected by<br />
Neighbourhood Services.<br />
6. There is an Ordinary Watercourse crossing the site, near the eastern<br />
boundary. Any proposal to alter, stop up, culvert, or connect to any<br />
watercourse, or building within 9 metres of the said watercourse, requires<br />
prior written consent from both the Local L<strong>and</strong> Drainage Authority<br />
(<strong>Reigate</strong> & <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> - Contact: Peter Russell, 01737<br />
276606), <strong>and</strong> the Environment Agency (01276 454300).<br />
7. The applicant should be aware of the British St<strong>and</strong>ard Code of Practice for<br />
the safe use of cranes, which requires crane operators to consult the<br />
aerodrome (in this case Gatwick) before erecting a crane in close proximity to<br />
it.<br />
8. The development is close to the Gatwick aerodrome <strong>and</strong> the approach to the<br />
runway. On this basis the applicant should be aware of the need to<br />
carefully design lighting proposals which is further explained in Advice<br />
Note 2, “Lighting near Aerodromes”. Please note that the Air Navigation<br />
Order 2005, Article 135 grants the Civil Aviation Authority power to serve<br />
notice to extinguish or screen lighting which may cause aircraft danger.<br />
9. The applicant is advised of the benefit of installing strengthened corners<br />
within the site where there are tight turning heads in order that refuse <strong>and</strong><br />
other large vehicles may enter <strong>and</strong> leave the site without causing damage to<br />
verges. Please contact Neighbourhood Services on 01737 276097 to discuss<br />
the matter.<br />
10. The applicant is advised that future residents of the development should be<br />
informed that bin collection shall take place to the front of dwellings by the<br />
kerbside <strong>and</strong> not within parking courts.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
Planning Committee <strong>Agenda</strong> Item 8<br />
13 April 2011 11/00126/F<br />
REASON FOR PERMISSION<br />
The development hereby permitted has been assessed against development plan<br />
policies SP3, CC4, CC6, H1, H2, H4, H5, NRM10, NRM11, GAT1, GAT2, GAT3,<br />
Pc2G, Pc4, Pc5, Pc8, Pc9, Ho2, Ho3, Ho9, Ho9A, Ho10, Ho13, Ho20, Re2, Re3, Re4,<br />
Re5, Re6, Re8, Ut1, Ut3, Ut4, Mo4, Mo5, Mo6, Mo7, Mo9, Mo11, Mo12, Mo13, Hr1,<br />
Hr2, Hr2A, Hr2B, Hr3, Hr16, Hr17, Hr19, Hr20, Hr21, Hr23, Hr24, Hr33, Hr36, Hr37,<br />
Hr38, Sh1, Sh2, Sh5, Sh10, Em1, Em2, Em3 <strong>and</strong> material considerations, including<br />
third party representations. It has been concluded that the development is in<br />
accordance with the development plan <strong>and</strong> there are no material considerations that<br />
justify refusal in the public interest.<br />
M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx
04/01778/RM13 - HORLEY NE SECTOR PHASE 2, ORCHARD DRIVE,<br />
HORLEY<br />
Crown Copyright Reserved. <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong>.<br />
Licence No - 100019405-2006<br />
Scale<br />
1:3000
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL
THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL