Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

TO:<br />

PLANNING COMMITTEE<br />

DATE: 13 April 2011<br />

REPORT OF:<br />

AUTHOR:<br />

HEAD OF BUILDING & DEVELOPMENT<br />

SERVICES<br />

Alan Ward<br />

TELEPHONE: 01737 276 216<br />

EMAIL:<br />

AGENDA ITEM: 8 WARD: Horley East<br />

alan.ward@reigate-banstead.gov.uk<br />

APPLICATION NUMBER: 04/01778/RM13 VALID: 7 September 2010<br />

APPLICANT: Barratt Southern Counties AGENT: Gerry Lytle Associates<br />

LOCATION:<br />

HORLEY DEVELOPMENT NORTH EAST SECTOR, HORLEY<br />

DESCRIPTION: Details of access, appearance, l<strong>and</strong>scaping, layout <strong>and</strong> scale for 308<br />

dwellings (including 60 bed extra care home) <strong>and</strong> neighbourhood<br />

centre<br />

DRAWING NUMBERS: See Condition 13<br />

SUMMARY<br />

Outline planning permission was granted following a resolution of the Planning<br />

Committee made in March 2005 <strong>and</strong> the subsequent completion of a legal<br />

agreement in September 2006. This was for 600 of the allocated 710 dwellings<br />

within the new neighbourhood, a neighbourhood centre, a primary school <strong>and</strong> a<br />

community hall, comprising phases one <strong>and</strong> two.<br />

This reserved matters application progresses the development of the new<br />

neighbourhood of 710 homes in Horley East, commonly known as the North East<br />

Sector. Construction of the site is well underway, with phase one, comprising 252<br />

homes <strong>and</strong> two additional pockets to the west by the London to Brighton railway<br />

(known as phases 1A <strong>and</strong> 1B <strong>and</strong> accounting for 40 dwellings) nearing completion.<br />

This application relates to phase two of the site, as indicated within the outline<br />

application, <strong>and</strong> is the parcel of l<strong>and</strong> immediately to the east of Lake Lane.<br />

Permission has been granted for the spine road that will run through phase two <strong>and</strong><br />

serve the housing now proposed, this is under construction.<br />

The development would incorporate 308 dwellings <strong>and</strong> a neighbourhood centre. 60<br />

of the dwellings would be provided within an extra care facility, which would<br />

consist of self-contained one <strong>and</strong> two-bedroom flats with communal areas <strong>and</strong><br />

twenty four hour care available. This would be operated by a Registered Social<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

L<strong>and</strong>lord. Overall 25% of the dwellings within phase two would be affordable<br />

housing in line with <strong>Council</strong> policy <strong>and</strong> what was agreed at the outline stage.<br />

The school site is located within this phase <strong>and</strong> is shown on the plans. This parcel of<br />

l<strong>and</strong> is to be h<strong>and</strong>ed over to the County <strong>Council</strong> in September <strong>and</strong> its layout <strong>and</strong><br />

design have yet to be determined, as it would be subject to a separate application<br />

which the County <strong>Council</strong> may process themselves. However, it is envisaged that<br />

they will do so in consultation with the <strong>Borough</strong>.<br />

The neighbourhood centre would include three shop units, two office units <strong>and</strong><br />

conversion of the grade II listed Tanyard Barn into a community centre.<br />

The proposed layout of the scheme follows guidance set out in Surrey Design, the<br />

Horley Design Guide <strong>and</strong> the <strong>Council</strong>’s Local Distinctiveness Design Guide. It<br />

would continue the main themes of phase one with a hierarchy of roads to serve the<br />

dwellings, comprising a main distributor road through the centre with smaller<br />

roads radiating to the outer boundaries of the site. There would be pedestrian links<br />

throughout the site to provide internal circulation <strong>and</strong> access to the surrounding<br />

area. Development would be laid out in informal blocks defined by roads or public<br />

<strong>and</strong> private spaces within the scheme. The dwellings themselves would comprise a<br />

mix of sizes <strong>and</strong> heights, generally being higher <strong>and</strong> denser along the spine road<br />

<strong>and</strong> at other focal points, decreasing in scale towards the edges to achieve a<br />

successful transition to the countryside beyond.<br />

The proposal includes an appropriate mix of private <strong>and</strong> affordable housing to<br />

accord with the requirements of the outline permission <strong>and</strong> the legal agreement.<br />

There would be a number of associated areas of open play space of various forms to<br />

serve the dwellings<br />

The detailed designs vary between building types, but a more traditional design is<br />

proposed for those houses sited towards the outer boundaries, particularly with the<br />

countryside, with a more urban feel to buildings located at the focal points of the<br />

site. In addition, with much of phase one completed <strong>and</strong> occupied it has been<br />

possible to see aspects that could be improved upon, <strong>and</strong> the applicant has agreed<br />

to the following:<br />

<br />

<br />

<br />

<br />

<br />

An increase in width of garage doors to allow easier parking of vehicles;<br />

The introduction of chimneys on many dwellings <strong>and</strong> greater articulation on<br />

buildings;<br />

Wooden-frame windows <strong>and</strong> sash windows where design requires it;<br />

Variations in road surface throughout the development; <strong>and</strong><br />

Details of a small open area by the neighbourhood centre being reserved by<br />

condition, allowing further consideration to increase parking <strong>and</strong> recycling<br />

provision.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

In addition, the development includes more off-road parking than was the norm for<br />

phase one, in order to minimise on-street parking.<br />

The development would continue to use the palette of materials agreed for phase<br />

one to be sympathetic to the overall design approach. This would include, for<br />

example, facing brickwork, tile hanging, render <strong>and</strong> weatherboarding to external<br />

elevations, <strong>and</strong> a mix of tiles <strong>and</strong> slate effect roofs. Such a mix would add visual<br />

interest <strong>and</strong> variety to the development without preventing a wider design<br />

consistency being achieved across the neighbourhood as a whole.<br />

Open space within the development would be provided by way of a large Local<br />

Area for Play (‘Super LAP’) by the community centre, <strong>and</strong> a Local Equipped Area<br />

for Play (LEAP) at the northern part of the site. Beyond this is the Riverside Green<br />

Chain, which will provide formal <strong>and</strong> informal recreational space, which received<br />

approval under a separate permission. Trees along the western <strong>and</strong> eastern<br />

boundaries will be retained <strong>and</strong> incorporated into the development.<br />

The development is also to incorporate a Sustainable urban Drainage System (SuDS)<br />

to provide surface water attenuation <strong>and</strong> flood protection measures. This will be in<br />

the form of swales, rills <strong>and</strong> permeable paving <strong>and</strong> can be controlled by condition.<br />

The applicant is currently finalising the design detail in consultation with the<br />

<strong>Council</strong>.<br />

10% of the energy requirements of the dwellings would be met from renewable<br />

sources such as solar panels <strong>and</strong> air source heat pumps.<br />

Flats within the extra care facility are classified as a normal dwelling type, for<br />

people over 55 with varying levels of care requirements. A Registered Social<br />

L<strong>and</strong>lord would run the facility, as affordable housing with a mix of social rented<br />

<strong>and</strong> affordable leasehold units. The Housing Manager has confirmed that there is a<br />

need for this type of facility within the <strong>Borough</strong> <strong>and</strong> it was envisaged that it would<br />

be built within the North West Sector, which has yet to gain planning approval (the<br />

<strong>Council</strong> has resolved to grant outline permission but the necessary planning<br />

obligation has not yet been completed). The early introduction of this facility is<br />

welcomed, but as the applicant has not yet secured an end user for the facility it will<br />

be necessary to reserve other parts of the site for affordable housing in case it does<br />

not go ahead. This can be secured by a deed of variation to the original planning<br />

obligation for phases one <strong>and</strong> two, which is currently being drafted.<br />

The reserved matters accord with the outline planning permission <strong>and</strong> the<br />

requirements of the legal agreement, <strong>and</strong> would help to create a high quality new<br />

neighbourhood that follows good practice in its layout <strong>and</strong> design.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

RECOMMENDATION<br />

Subject to the completion of all documentation required to create a deed of variation<br />

to the planning obligation under Section 106 of the Town <strong>and</strong> Country Planning Act<br />

1990 (as amended) attached to application 04/018778/OUT to:<br />

(i)<br />

(ii)<br />

Provide the option to develop a 60 unit extra care housing scheme; <strong>and</strong><br />

Reserve development of part of the site until the extra care scheme has been<br />

secured, in order to ensure that the appropriate amount of affordable housing<br />

is provided.<br />

Reserved matters are APPROVED subject to conditions.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Consultations:<br />

Highway Authority: no objection.<br />

Gatwick Airport: no objection.<br />

EDF Energy: no objection<br />

Surrey Police Crime Prevention Officer: no objection.<br />

Horley Town <strong>Council</strong>: no objection<br />

NATS Safeguarding: no objection.<br />

Environment Agency: objection. (Note: this is expected to be withdrawn.)<br />

SCC Archaeology: no objection subject to a suggested condition.<br />

Representations:<br />

Letters were sent to neighbouring properties on 16 September 2010 <strong>and</strong> 15 March<br />

2011, site notices were posted 27 September 2010 <strong>and</strong> 22 March 2011, <strong>and</strong> an<br />

advertisement was placed in the local press on 22 September 2010. Six responses<br />

have been received raising the following issues:<br />

Issue Number Response<br />

Increase in traffic <strong>and</strong> congestion 2 See paragraphs 6.30-6.35<br />

Over-development 1 See paragraphs 6.13-6.16<br />

General objection 1 See paragraph 6.1<br />

No need for the development<br />

Deviation from masterplan<br />

Lack of infrastructure<br />

Noise <strong>and</strong> disturbance<br />

1.0 Site <strong>and</strong> Character Appraisal<br />

1<br />

2<br />

1<br />

1<br />

See paragraph 6.1<br />

See paragraph 6.23<br />

See paragraph 6.1<br />

See paragraph 6.29<br />

1.1 The North East Sector amounts to a 55-hectare site located on the northern<br />

side of Langshott. This application relates to phase two of this overall site, as<br />

per the legal agreement accompanying the outline permission, which is<br />

approximately 11.2 hectares. The site currently comprises open fields with an<br />

existing hedgerow on the western side, on the boundary with Lake Lane (part<br />

of the National Cycle Route), <strong>and</strong> a tree belt toward the eastern side,<br />

beyond which is a smaller parcel of l<strong>and</strong> contained by tree lines that also<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

constitutes the application site. The application site includes Tanyard Farm<br />

on the southern boundary, which is a grade II listed barn with outbuildings<br />

<strong>and</strong> a yard area.<br />

1.2 Phase one of the sector is on the other side of Lake Lane to the west, the<br />

Langshott Estate is beyond Langshott to the south, <strong>and</strong> to the east are fields<br />

<strong>and</strong> another parcel of l<strong>and</strong> that has outline planning permission for 110 units<br />

which, constitutes the third <strong>and</strong> final phase of the North East Sector<br />

development.<br />

2.0 Added Value<br />

2.1 At the pre-application stage the applicant was advised to provide a logical<br />

continuation of phase one in design <strong>and</strong> layout.<br />

2.2 Improvements secured during the course of the application include:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Additional parking spaces secured with l<strong>and</strong>scaping;<br />

An increase in width of garaging;<br />

A reduction in the size <strong>and</strong> bulk of the extra care home;<br />

An increase in the scale of buildings about the care home to create an<br />

appropriate townscape;<br />

Continuous higher density frontage where it is appropriate along the<br />

spine road;<br />

More variation in dwelling types along the spine road;<br />

The introduction of chimneys <strong>and</strong> re-introduction of extended porch<br />

canopies, full bay windows, gable elements, wooden-frame windows<br />

(including sash) <strong>and</strong> tile hanging where necessary;<br />

Variation in surfacing used on the spine road;<br />

Alterations to the design of swales to increase visual appeal (the final<br />

design is to be confirmed);<br />

An increase in height of dwellings facing onto the neighbourhood centre<br />

to provide a clearer <strong>and</strong> appropriate sense of place;<br />

The introduction of a footpath to the rear of the extra care scheme;<br />

The introduction of an additional road to increase permeability <strong>and</strong><br />

create perimeter blocks; <strong>and</strong><br />

An increase in the depth of the l<strong>and</strong>scape buffer between the<br />

development <strong>and</strong> Langshott.<br />

2.3 Further improvements could be secured through the use of conditions<br />

including one to reserve the final detail of the open area in the<br />

neighbourhood centre so that parking levels <strong>and</strong> recycling facilities may be<br />

improved.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

3.0 Relevant Planning <strong>and</strong> Enforcement History<br />

3.1 04/01778/OUT A new neighbourhood of 600<br />

dwellings with associated facilities<br />

<strong>and</strong> infrastructure works<br />

Resolution to grant<br />

23 March 2005<br />

Granted with S106<br />

22 September 2006<br />

3.2<br />

04/01778/RM1<br />

Construction of the Spine Road <strong>and</strong><br />

Swales to facilitate residential<br />

development for phase one of the<br />

NE Sector new neighbourhood<br />

development<br />

Granted<br />

2 October 2007<br />

3.3<br />

04/01778/RM2<br />

Reserved matters application for 252<br />

new homes<br />

Granted<br />

4 December 2007<br />

3.4<br />

04/01778/RM12<br />

Reserved matters application<br />

pertaining to the spine road for<br />

phase two of 04/01778/OUT<br />

Granted<br />

25 January 2011<br />

4.0 Proposal <strong>and</strong> Design Approach<br />

4.1 This reserved matters application follows outline permission 04/01778/OUT<br />

granted in September 2006. The reserved matters for which approval are<br />

sought are access, appearance, l<strong>and</strong>scaping, layout <strong>and</strong> scale of 308 dwellings<br />

<strong>and</strong> the neighbourhood centre. The principle of development, the means of<br />

access <strong>and</strong> the impact of the development on the wider environment were<br />

determined at the outline application stage.<br />

4.2 The school site is located within this phase, <strong>and</strong> this parcel of l<strong>and</strong> is to be<br />

h<strong>and</strong>ed over to the County <strong>Council</strong> in September. Its layout <strong>and</strong> design<br />

has yet to be determined, as it will be subject to a separate application. It is<br />

envisaged that the County <strong>Council</strong> will progress this in consultation with the<br />

<strong>Borough</strong> <strong>Council</strong>.<br />

4.3 The design approach for the development continues the themes of phase one,<br />

which has been informed by the advice in the Horley Design Guide <strong>and</strong><br />

Surrey Design. This has included creating a variety of sub-characters within<br />

the phase to encourage a sense of place <strong>and</strong> identity for residents <strong>and</strong> visitors<br />

alike, <strong>and</strong> a layout containing distinctive features such as urban squares to<br />

create a legible form of development. The applicant has taken account of the<br />

constraints of the site, namely the flood plain, existing tree belts <strong>and</strong><br />

l<strong>and</strong>scaping, which have played a major part in defining <strong>and</strong> influencing the<br />

final layout.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

4.4 The flood plain defines the developable area in this respect <strong>and</strong> therefore<br />

creates open areas at the edge of development that will be utilised as visual<br />

breaks, areas of l<strong>and</strong>scaping or for outdoor recreational uses. The tree belts<br />

form strong features running north-south through the site, which again allow<br />

significant spacing between built form, <strong>and</strong> create l<strong>and</strong>scaped avenues<br />

that would complement internal areas of open space.<br />

4.5 The Fastway bus route would pass through the development <strong>and</strong> leave the<br />

site onto Langshott by the neighbourhood centre. Only buses would be<br />

allowed to exit the site in this manner, ensured by the presence of an<br />

automatic bus gate.<br />

4.6 Housing would be laid out in the form of perimeter blocks of appropriate<br />

sizes on either side of the main spine road. These blocks would vary in<br />

character to reflect their position within the hierarchy of areas that make up<br />

the phase, <strong>and</strong> ultimately part of the overall neighbourhood. This approach<br />

is encouraged in both the Horley Design Guide <strong>and</strong> Surrey Design, which<br />

refers to the importance of distinct character areas such as:<br />

The neighbourhood core: to include formal spaces; close-knit development;<br />

doors fronting streets with short front gardens; a mix of dwelling sizes;<br />

l<strong>and</strong>mark buildings; a range of dwelling heights; traditional materials; <strong>and</strong><br />

secure rear courtyards for parking with some on street designated bays.<br />

Transitional area: to include a more regular road pattern; roads incorporating<br />

a number of character areas; dwellings fronting roads <strong>and</strong> main footpaths or<br />

cycle routes; shorter terraces of dwellings; a lower density; larger gardens<br />

with space to park behind building lines; <strong>and</strong> terraced parking in rear<br />

courtyards.<br />

Countryside edge: to include as above but more spacious development;<br />

lower densities; larger buildings of more individual design fronting onto the<br />

countryside; high quality design; less regular building lines; <strong>and</strong> limited on<br />

street parking.<br />

4.7 The use of air source heat pumps <strong>and</strong> solar panels would be utilised to<br />

ensure that a minimum of 10% of the development’s energy needs are met<br />

from renewable sources. It is expected that the detailed design of the new<br />

school will add to this.<br />

4.8 Further details of the development are as follows:<br />

Site area<br />

Proposed parking spaces<br />

Parking st<strong>and</strong>ard<br />

11.2 hectares<br />

447 (including 49 visitor spaces)*<br />

462 (maximum)<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Number of affordable units 71<br />

Proposed site density<br />

Density north of Langshott<br />

Density of Langshott Estate<br />

Density of Phase 1<br />

27.5 dwellings per hectare<br />

3-15 dwellings per hectare<br />

20-50 dwellings per hectare<br />

31 dwellings per hectare<br />

*The level of designated parking is likely to increase with the re-design of the<br />

open space by the neighbourhood centre.<br />

4.9 Details of the mix <strong>and</strong> affordability of dwellings are as follows:<br />

Unit Type Open Market Affordable Overall<br />

One <strong>and</strong> two-bedroom flats<br />

(extra care facility)<br />

0 60 60<br />

Two bedroom houses 4 4 8<br />

Two bedroom coach houses 16 0 16<br />

Three bedroom houses 88 5 93<br />

Four bedroom houses 87 2 89<br />

Five bedroom houses 42 0 42<br />

Total: 237 71 308<br />

5.0 Policy Context<br />

5.1 Designation<br />

Allocated Housing Site – policy Hr16<br />

Countryside beyond the Green Belt (Riverside Green Chain)<br />

Grade II listed building<br />

5.2 The South East Plan 2009<br />

Spatial Strategy<br />

Cross-Cutting Policies<br />

Housing<br />

Natural Resource Management<br />

Gatwick<br />

SP3<br />

CC4, CC6<br />

H1, H2, H4, H5<br />

NRM10, NRM11<br />

GAT1, GAT2, GAT3<br />

5.3 <strong>Reigate</strong> & <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005<br />

L<strong>and</strong>scape & Nature Conservation<br />

Heritage Sites<br />

Pc2G, Pc4, Pc5<br />

Pc8, Pc9<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Housing<br />

Recreation<br />

Utilities<br />

Movement<br />

Shopping<br />

Employment<br />

Horley Master Plan<br />

Ho2, Ho3, Ho9, Ho9A, Ho10, Ho13,<br />

Ho20<br />

Re2, Re3, Re4, Re5, Re6, Re8<br />

Ut1, Ut3, Ut4<br />

Mo4, Mo5, Mo6, Mo7, Mo9, Mo11,<br />

Mo12, Mo13<br />

Sh1, Sh2, Sh5, Sh10<br />

Em1, Em2, Em3<br />

Hr1, Hr2, Hr2A, Hr2B, Hr3, Hr16,<br />

Hr17, Hr19, Hr20, Hr21, Hr23, Hr24,<br />

Hr33, Hr36, Hr37, Hr38<br />

5.4 Other Material Considerations<br />

Planning Policy Statements/Guidance<br />

Supplementary Planning Guidance<br />

Other<br />

PPS1, PPS3, PPS5, PPS7, PPS9,<br />

PPG13, PPS23, PPS25<br />

Horley Design Guide<br />

Surrey Design<br />

Local Distinctiveness Design Guide<br />

A Parking Strategy for Surrey<br />

Parking St<strong>and</strong>ards for Development<br />

Affordable Housing<br />

Outdoor Playing Space Provision<br />

By Design<br />

The Manual for Streets<br />

Design Bulletin 32<br />

Places Streets <strong>and</strong> Movements<br />

Human Rights Act 1998<br />

6.0 Assessment<br />

6.1 The principle of the development of a new neighbourhood in this location<br />

was set with the adoption of the 2005 <strong>Borough</strong> Local Plan. The impact of the<br />

neighbourhood on the wider environment was assessed further in the context<br />

of the outline application, 04/01778/OUT, approved in September 2006 with<br />

an accompanying legal agreement that secured a package of planning<br />

benefits totalling some £30 million.<br />

6.2 This application seeks approval for the layout, scale, appearance <strong>and</strong><br />

l<strong>and</strong>scaping of the second phase of the development. The outline planning<br />

permission was accompanied by 56 planning conditions, many of which had<br />

several sub-sections requiring separate submissions. The majority have now<br />

been satisfied although their audit has proved onerous for both the applicant<br />

<strong>and</strong> the <strong>Council</strong>. In order to reduce the administrative burden it is proposed<br />

to re-impose relevant conditions on this permission, but with simpler<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

wording that requires compliance rather than submissions where possible.<br />

This would allow the <strong>Council</strong> better management of the site, including<br />

enforcement where necessary, whilst removing unnecessary constraints for<br />

the development. The main issues to consider are therefore:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Siting <strong>and</strong> layout - design appraisal<br />

Scale <strong>and</strong> appearance of buildings<br />

Open space <strong>and</strong> l<strong>and</strong>scaping<br />

Affordable Housing<br />

Neighbour amenity<br />

Transport <strong>and</strong> parking issues<br />

Flood risk<br />

Renewable energy<br />

Contamination<br />

Siting <strong>and</strong> layout<br />

6.3 The proposed siting <strong>and</strong> layout of the development follows current good<br />

practice on appropriate design principles as set out in a range of design<br />

guidance documents including national guidance in By Design <strong>and</strong> The<br />

Manual for Streets; the County-wide guidance in Surrey Design; <strong>and</strong> the<br />

<strong>Borough</strong> <strong>Council</strong>’s own design documents - the Horley Design Guide <strong>and</strong> the<br />

Local Distinctiveness Design Guide.<br />

6.4 The road network encompasses a hierarchy of roads, from the main<br />

distributor road where pedestrians <strong>and</strong> vehicles are separated, through to<br />

mews courtyards <strong>and</strong> private drives where they are not. This hierarchy<br />

presents a flexible choice of routes for users.<br />

6.5 The three recommended areas of the “neighbourhood core”, the “transitional<br />

area” <strong>and</strong> the “countryside edge” are clearly evident with changes in<br />

densities, building heights, types <strong>and</strong> spacings that define these areas, as<br />

encouraged in the guidance documents.<br />

6.6 The creation of smaller areas within the character areas has been achieved in<br />

particular with two main squares <strong>and</strong> the neighbourhood centre. The use of<br />

three-storey buildings, large grassed verges <strong>and</strong> raised tables with varying<br />

surface paving help to punctuate <strong>and</strong> provide legibility within the<br />

development. The extra care home would be the largest building within the<br />

development <strong>and</strong> buildings around it have been designed to provide a<br />

transition to the more domestic form, again creating a townscape with<br />

reference points that would help future users find their way.<br />

6.7 Parking provision on a development of this size could detract from the<br />

overall quality <strong>and</strong> character of a scheme if not carefully positioned. The<br />

design guidance encourages various methods to prevent parking dominated<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

developments. This scheme is considered to be successful for the most part<br />

in achieving this. Parking spaces would be hidden from main street<br />

frontages wherever possible, either to the side of properties, in rear<br />

courtyards, or in buildings with flats over. These methods follow the<br />

recognised principles in both Surrey Design <strong>and</strong> the Horley Design Guide.<br />

There are instances where a number of spaces are situated to the front of<br />

dwellings, but these would be either tucked away within the development or<br />

surrounded by good levels of l<strong>and</strong>scaping, <strong>and</strong> this arrangement would not<br />

therefore have such an impact to the visual amenities of the wider area as to<br />

be detrimental.<br />

6.8 In response to concerns over a potential shortfall in visitor parking,<br />

additional on-street bays have been added <strong>and</strong> the open space in the<br />

neighbourhood centre could be re-designed to provide further parking.<br />

These aspects would help discourage inappropriate on-street parking that<br />

might obstruct the main road. It is likely that visitor parking will still occur<br />

on the roads at certain points, but the road widths have been designed for<br />

this <strong>and</strong> for space to still be available for other vehicles to pass.<br />

6.9 The buildings about the neighbourhood centre would fit in well with the<br />

character of the converted barn <strong>and</strong> would provide an attractive facility for<br />

residents. The current arrangement is for two office units <strong>and</strong> three retail<br />

units with flats above. During the course of the application central chimneys<br />

have been added to allow for ducting/ventilation equipment to be<br />

sympathetically incorporated into the building.<br />

6.10 The conversion of the barn appears externally to generally be acceptable.<br />

However further details of the final external <strong>and</strong> internal appearance are<br />

required, so a condition can require a method statement with further detail.<br />

However, it should also be noted that more detailed control will be exercised<br />

through the necessary application for listed building consent for these works.<br />

6.11 The school is to be h<strong>and</strong>ed to Surrey County <strong>Council</strong> toward the end of the<br />

year (in or after September), <strong>and</strong> no details of its layout or elevations are<br />

established. The master plan however does show a main vehicular entrance<br />

from the spine road <strong>and</strong> also a pedestrian entrance from the neighbourhood<br />

centre into the school site. This should spread the congestion associated with<br />

dropping off/picking up children <strong>and</strong> help the vitality of the neighbourhood<br />

centre.<br />

6.12 All these elements of the layout are in accordance with the design principles<br />

set out in the guidance documents.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Scale <strong>and</strong> Appearance of Buildings<br />

6.13 Subsequent to amendments by the applicants the appearance of the buildings<br />

are now consistent with phase one. Proposed dwellings are of a traditional<br />

form in an attempt to echo positive characteristics elsewhere in Horley.<br />

These range from two to three storeys in height, some with rooms in the roof<br />

<strong>and</strong> would be set in rows of terraces, semi-detached pairs or larger detached<br />

plots. Variation in the street scene would be achieved by the presence of<br />

rows of dwellings rounding corners, the inclusion of gables <strong>and</strong> carriageway<br />

arches, <strong>and</strong> changing ridge heights to provide a visual break in the expanses<br />

of built form. External finishes would display a range of combinations<br />

throughout the dwellings but the palette includes brickwork, tile hanging or<br />

weatherboarding <strong>and</strong> render, with detailing to certain features on the<br />

dwellings to add interest. Roof materials would be either tile or slate. The<br />

windows <strong>and</strong> doors would have a vertical emphasis <strong>and</strong> either white sash or<br />

casement form, <strong>and</strong> some properties would have chimneys. Again all of<br />

these materials <strong>and</strong> styles are in line with the advice in the Horley Design<br />

Guide <strong>and</strong> are characteristic of properties within the local area. The use of a<br />

condition can ensure the use of sliding sash on the front elevations of<br />

dwellings where this style is shown, <strong>and</strong> the use of wooden frame windows<br />

in sensitive locations.<br />

6.14 The extra care home would be appropriately articulated with recessed areas,<br />

gables <strong>and</strong> barn hip roofs <strong>and</strong> be finished in brick <strong>and</strong> tile hanging. It has<br />

been reduced in scale from the original submission so that there is spacing<br />

about it for some soft l<strong>and</strong>scaping. Although a large building that would be<br />

visible in longer views, it is well designed <strong>and</strong> would sit well in its location,<br />

relatively central within the overall phase one/phase two development.<br />

6.15 Other affordable housing is also designed to the same specification <strong>and</strong><br />

appearance as the market housing. This would ensure no obvious distinction<br />

between affordable or market units.<br />

6.16 It is clear that the quality of materials will play a key role in the success of the<br />

finished character <strong>and</strong> appearance of the development. The materials palette<br />

has been established <strong>and</strong> is ensured by condition to ensure the highest<br />

quality is achieved.<br />

Open Space <strong>and</strong> L<strong>and</strong>scaping<br />

6.17 The layout of the scheme has been designed to ensure that a number of<br />

mature tree belts intersecting the site will be retained. To ensure their<br />

protection <strong>and</strong> make the most of their l<strong>and</strong>scape value, a five-metre buffer<br />

zone is proposed around each tree belt, which is considered appropriate.<br />

These retained tree belts would contribute to the character <strong>and</strong> appearance of<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

the development in the form of green avenues <strong>and</strong> wildlife corridors. This is<br />

a principle that is again encouraged in the design documents.<br />

6.18 Another l<strong>and</strong>scape feature that would make an important contribution to the<br />

character <strong>and</strong> sense of identity of the development is the swales that would<br />

be created as part of the SuDS system. Their final design is yet to be<br />

approved but their general location is shown on the master plan <strong>and</strong> final<br />

details are progressing in consultation with the <strong>Council</strong>. The layout of the<br />

scheme integrates with the location of the swales, which follow the northsouth<br />

line of the tree belts in “green corridors” as part of the drainage<br />

strategy for the neighbourhood. The illustrative details on the submitted<br />

plans indicate that the l<strong>and</strong>scaping proposals will include new tree planting<br />

along the swales.<br />

6.19 The l<strong>and</strong>scaping plans show consistency with a framework plan for the site<br />

as a whole, so that planting in both phases one <strong>and</strong> two appears as one<br />

logical scheme throughout that complements the housing. This would<br />

include structural planting of trees <strong>and</strong> hedging within the development <strong>and</strong><br />

also in an area between housing <strong>and</strong> the southern boundary that is a<br />

minimum of five metres in depth. This would provide a buffer zone to<br />

alleviate the appearance of the development <strong>and</strong> which, over time, would<br />

establish <strong>and</strong> maintain the characteristics of Langshott.<br />

6.20 The Riverside Green Chain is a b<strong>and</strong> of informal open space curving round<br />

the northern boundaries of the whole sector, which will provide accessible<br />

public open space, including a spine path suitable for cyclists <strong>and</strong><br />

pedestrians. It formed an integral part of the master plan within the outline<br />

application <strong>and</strong> its details were approved under 04/01778/RM1. The more<br />

localised play space provision would be by way of one large Local Area for<br />

Play (super LAP), sited close to the southern boundary by the community<br />

centre <strong>and</strong> a normal Local Equipped Area for Play (LEAP) to the north, close<br />

to the Green Chain. Both would have some overlooking from properties to<br />

provide natural surveillance <strong>and</strong> they would incorporate a range of play<br />

equipment, although the one by the community centre would only have<br />

features such as stepping stones or logs for children to play on. This is to aid<br />

the setting of the listed barn. This level of provision would ensure that the<br />

community is no more than 10 to 15 minutes walk from such facilities.<br />

Affordable Housing<br />

6.21 The proposed layout includes 71 affordable units, which equates to<br />

approximately a 25% provision as required by the legal agreement attached<br />

to the outline permission. Sixty units would be within the extra care scheme<br />

<strong>and</strong> consist of social rented <strong>and</strong> affordable leasehold properties, while the<br />

eleven units about the neighbourhood centre (plots 448-458) would be<br />

allocated as social rented housing <strong>and</strong> range from two-bed to four-bed<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

properties. Having taken advice from the <strong>Council</strong>’s Housing Development<br />

Manager, I am satisfied that this would be a satisfactory arrangement in<br />

terms of tenure split <strong>and</strong> their location.<br />

6.22 The Housing Manager has confirmed that there is a need for an extra care<br />

facility within the <strong>Borough</strong> <strong>and</strong> it was envisaged that it would be built within<br />

the North West Sector, which has yet to gain detailed planning approval. The<br />

early introduction of this is welcomed, but as the applicant has not yet<br />

secured an end user for the facility it will be necessary to reserve other parts<br />

of the site for affordable housing in case it does not go ahead. This shall be<br />

secured by a deed of variation to the original Section 106 on the site,<br />

which is currently being drafted.<br />

6.23 Concern has been raised over the layout of the extra care scheme <strong>and</strong> the<br />

internal arrangements of some of the three-bed units, which would be<br />

identical to the four-bed units but with a study in lieu of a bedroom. The<br />

reason for this is that the applicant needs to provide dwellings of appropriate<br />

scale about the neighbourhood centre, resulting in larger units. They are<br />

firmly of the view that these dwellings will be acceptable to a Registered<br />

Social L<strong>and</strong>lord <strong>and</strong> so have not altered the layouts, but the Housing<br />

Manager maintains that this may be an issue. The development must<br />

provide 25% affordable units, ensured by legal agreement, so it is in the<br />

applicant’s interest to design appropriate units. With this in mind I am<br />

inclined to accept the layouts provided. If they were found to be<br />

unacceptable for an end user then an amendment to the permission would be<br />

needed, which could occur at a later date.<br />

Neighbour Amenity<br />

6.24 The proposed layout has been designed so as to afford acceptable levels of<br />

amenity for all future occupants. All dwellings would be of sufficient size<br />

with adequately sized gardens. The majority of dwellings would benefit<br />

from a separate rear access to their gardens. The layout has been assessed by<br />

the Architectural Liaison Officer for Surrey Police in terms of crime<br />

prevention, <strong>and</strong> he is satisfied that there are no obvious areas that might<br />

encourage crime.<br />

6.25 The flats <strong>and</strong> flats over garages have little or no private amenity space.<br />

However this is acceptable given the scale <strong>and</strong> type of units <strong>and</strong> the provision<br />

of various forms of public open space available for use within close<br />

proximity.<br />

6.26 The overall layout <strong>and</strong> siting of dwellings has been designed to avoid any<br />

unacceptable overlooking between new dwellings. Where windows would<br />

face one another, or neighbouring gardens, they would be to rooms that<br />

could be obscure glazed to prevent loss of privacy. Dwellings would be sited<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

to avoid any unacceptable level of overshadowing or overbearing impact to<br />

the detriment of future occupants’ amenities. The resulting relationship<br />

between dwellings is one that is to be expected on a residential development<br />

of this scale. The design concept of a number of perimeter blocks of<br />

development <strong>and</strong> the moderate density of dwellings would combine to<br />

ensure a neighbourly relationship is maintained for new residents. Permitted<br />

development rights for extensions were removed by condition 10 of the<br />

outline permission.<br />

6.27 In some instances retained trees would overhang rear gardens or be in close<br />

proximity to dwellings. However any impact is not felt to be so great as to<br />

significantly detract from the amenity <strong>and</strong> enjoyment of these properties.<br />

6.28 The neighbourhood centre <strong>and</strong> school site would be near to some dwellings<br />

on Langshott. The neighbourhood centre is a sufficient distance from these<br />

properties to prevent any significant impact <strong>and</strong> a right of way has been<br />

retained for Tanyard Farm Cottage. The final layout of the school shall<br />

require a future application <strong>and</strong> such issues will be taken into account then.<br />

6.29 The construction phase is an inevitable part of any development. Other<br />

legislation exists to ensure that neighbours do not endure excessive levels of<br />

disturbance. The introduction of housing within the urban area is also not<br />

something that would lead to unusual levels of noise or disturbance.<br />

Transport <strong>and</strong> Parking<br />

6.30 The provision of the Fastway bus link through the neighbourhood is a major<br />

factor in encouraging a shift away from the private car to more sustainable<br />

forms of transport. The Fastway bus will enter the site from Langshott <strong>and</strong><br />

will curve through the middle of phases one <strong>and</strong> two, ending at the<br />

neighbourhood centre where it will then exit onto Langshott again. There<br />

will be no access or egress point for other vehicles onto or from Langshott at<br />

this point, a matter that was determined at the outline stage. The traffic<br />

implications of this development are consistent with the wider assessment<br />

made as part of the Local Plan process <strong>and</strong> through the outline application.<br />

6.31 A legible <strong>and</strong> direct network of pedestrian <strong>and</strong> cycle routes is planned as part<br />

of the development, the details of which are to be approved by way of<br />

conditions. This network will provide links both within the development<br />

<strong>and</strong> to the town centre <strong>and</strong> surrounding areas. The neighbourhood has been<br />

designed to encourage pedestrian <strong>and</strong> cycle flows by ensuring that motor<br />

vehicle routes do not dominate the layout or permeability of the site. The<br />

occupants of the dwellings would have the opportunity for cycle storage<br />

either by way of garage provision or private amenity space in which to create<br />

storage.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

6.32 The Head of Neighbourhood Services has expressed concern over the lack of<br />

turning head to some roads, <strong>and</strong> requested that bollards or l<strong>and</strong>scaped areas<br />

proposed to prevent through-flow of traffic (such as to the front of units 322<br />

<strong>and</strong> 367) should be removed to allow a through route for refuse lorries. This<br />

is a reasonable request that would also improve permeability so the use of<br />

condition can require this. Refuse lorries may reverse down other small culde-sacs<br />

<strong>and</strong> a bin collection point to units 313 <strong>and</strong> 314 is too far for collection.<br />

As it only serves two units it is reasonable to expect the owners to bring<br />

their bins to the kerbside. In addition a request for strengthened corners was<br />

made <strong>and</strong> clarification as to where bins will be put out. Although this cannot<br />

be required by condition, an informative shall relay this information to the<br />

applicant.<br />

6.33 The road system has been designed in line with highway advice <strong>and</strong> design<br />

principles in the guidance documents. The main internal distributor road<br />

(the spine road) would include a footpath on both sides <strong>and</strong> raised tables as<br />

traffic calming measures. The road hierarchy meets the required st<strong>and</strong>ards of<br />

the technical annex to Surrey Design <strong>and</strong> is therefore acceptable.<br />

6.34 The proposal incorporates a total of 447 parking spaces, including 49 visitor<br />

spaces. The visitor spaces would discourage on street parking, particularly<br />

on the spine road. The allocated parking spaces would be provided in<br />

either garages or hard st<strong>and</strong>ing spaces, many in a t<strong>and</strong>em arrangement, <strong>and</strong><br />

would achieve two spaces per unit for the majority of the development. The<br />

smaller/affordable units would achieve one space per dwelling <strong>and</strong> many of<br />

the larger units would have an allocation of four spaces per dwelling. The<br />

applicants have learned from issues within phase one with many of the<br />

parking spaces actually wider than the common st<strong>and</strong>ard so as to<br />

accommodate modern, larger vehicles, <strong>and</strong> garage doors would also be wider<br />

(ensured by condition) to make their use more common.<br />

6.35 Although the parking provision is below the maximum st<strong>and</strong>ard, it must be<br />

recognised that 60 of the dwellings will be contained within the extra care<br />

scheme, which generally requires less parking provision, so overall the<br />

parking allocation per unit is much improved on that within phase one. The<br />

level of parking is also expected to increase with the re-design of the<br />

central green, which is to be reserved by condition, <strong>and</strong> the applicant<br />

has indicated that they are seeking to provide a further 10 visitor spaces<br />

along the spine road. It is expected that some on-street parking shall still<br />

occur, but road widths have been designed to take this into account <strong>and</strong> still<br />

allow for the free flow of traffic.<br />

Flood Risk<br />

6.36 The residential development is sited beyond the identified 1:100 year <strong>and</strong><br />

1:100 year +20% flood plains, an issue that was addressed prior to the outline<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

permission being granted. In addition to this, the slab level of all dwellings is<br />

to be built at least to the 1:100 year + 20% level to account for any uncertainty<br />

associated with climate change. The proposed SuDS as discussed earlier are<br />

intended to manage <strong>and</strong> discharge any flood water generated from<br />

impermeable areas. Accordingly the <strong>Council</strong>’s Drainage Engineer has no<br />

objection to this application.<br />

6.37 Although the SuDS system does not form part of this application, they are<br />

shown on the master plan <strong>and</strong> it is expected that their layout will not alter<br />

significantly from this. In order to ensure that the completed SuDS system<br />

has been built in accordance with the approved plans, the appropriate<br />

drainage condition can require a final survey of the system to be submitted<br />

to <strong>and</strong> approved in writing by the Local Planning Authority.<br />

6.38 The Environment Agency has expressed objection to the scheme because the<br />

final detail of the drainage strategy was not included within the application<br />

<strong>and</strong> there are some issues with the submitted flood risk assessment. It is,<br />

however, satisfied that a sustainable drainage strategy may be achieved <strong>and</strong><br />

that this can be controlled by condition. It is expected that the Agency<br />

will shortly withdraw its objection <strong>and</strong> an update on this will be reported to<br />

the meeting.<br />

Renewable energy<br />

6.39 The application includes the positions of solar panels to provide water<br />

heating <strong>and</strong> air source heat pumps that would generate 10% of the energy<br />

requirements of the development by renewable sources.<br />

6.40 The outline permission was granted with condition 18 requiring either details<br />

of a combined heat <strong>and</strong> power (CHP) plant or a statement indicating why<br />

such a facility cannot be provided. Throughout pre-application discussions<br />

officers repeatedly stated the need for this to be given serious consideration.<br />

However, the applicant has chosen the latter requirement of condition 18 <strong>and</strong><br />

is preparing an energy report indicating why a CHP plant is not practical in<br />

this instance, which will be considered carefully <strong>and</strong> critically, taking account<br />

of opportunities to serve development within phase one also. The applicant’s<br />

initial comments dismiss combined heat <strong>and</strong> power for the following reasons:<br />

<br />

<br />

<br />

The density of development is low to medium;<br />

Residential accommodation does not provide a constant energy dem<strong>and</strong>;<br />

<strong>and</strong><br />

The build out of residential units would be linked entirely to market<br />

dem<strong>and</strong>, increasing technical <strong>and</strong> financial risk to energy service<br />

investors <strong>and</strong> rendering efficiencies extremely low during early phases of<br />

development.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

6.41 As the planning condition provides the option not to provide a CHP plant,<br />

<strong>and</strong> the development will still provide renewable energy that is in line with<br />

the South East Plan, this will need to be the subject of further detailed<br />

consideration.<br />

Contaminated L<strong>and</strong><br />

6.42 A desk study, site investigation report <strong>and</strong> remedial action plan for phase<br />

two of the Horley North East Sector were produced in November 2006. The<br />

site investigation report identified the presence of ground gases <strong>and</strong> material<br />

impacted by contamination in the Tanyard Farm area of the site. Details<br />

presented in the remediation action plan to address the contamination<br />

that was identified were vague <strong>and</strong> did not take into account the proposed<br />

layout of the site.<br />

6.43 In order to maintain control of works to address the contamination identified<br />

in the area of Tanyard Barn, it is necessary that future investigation <strong>and</strong>/or<br />

remediation works are agreed with the Local Planning Authority prior to<br />

such works being undertaken <strong>and</strong> development commencing in this area. A<br />

validation/closure report to record the works undertaken to ensure that the<br />

site was suitable for its proposed use will also be required prior to the<br />

development being occupied.<br />

CONDITIONS<br />

Pre-Commencement Conditions<br />

1. No development shall take place until a Construction Method Statement has<br />

been submitted to <strong>and</strong> approved in writing by the Local Planning Authority.<br />

Development shall be carried out only in accordance with the approved<br />

Construction Method Statement, which shall include details of:<br />

Highway Matters<br />

(a) Parking for vehicles of site personnel, operatives <strong>and</strong> visitors;<br />

(b) A programme of works (including measures for traffic management);<br />

(c) The provision of boundary hoarding in accordance with the details<br />

contained within the Construction Method Statement, Phase 1<br />

document prepared by Terry Ship on behalf of Barratt Wates <strong>and</strong> dated<br />

20 May 2008, Version 1;<br />

Flora <strong>and</strong> Fauna<br />

(d) Protection of existing fauna identified for retention, as detailed within<br />

the Environmental Statement;<br />

Environmental Health<br />

(e)<br />

Measures to prevent ground water contamination pollution; <strong>and</strong><br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

(f)<br />

Construction related pollution prevention measures<br />

Reason:<br />

In order that the development should not prejudice highway safety nor cause<br />

inconvenience to other highway users <strong>and</strong> to preserve <strong>and</strong> enhance the visual<br />

amenities of the locality, whilst ensuring that the development will not cause<br />

harm to human health or pollution of controlled waters, with regard to <strong>Reigate</strong><br />

<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9, Mo7 <strong>and</strong> PPS23, <strong>and</strong> in<br />

order that the impacts of the development are mitigated in accordance with<br />

the Environmental Statement.<br />

2. No development shall take place until a Quality Assurance Protocol <strong>and</strong><br />

Methodology has been submitted to <strong>and</strong> been approved in writing by the<br />

Local Planning Authority. The Protocol <strong>and</strong> Methodology shall include<br />

details of <strong>and</strong> provide for the following matters:<br />

(a) The measures to be put in place by the developers to ensure that the<br />

development is carried out <strong>and</strong> constructed <strong>and</strong> the permission<br />

implemented in accordance with the approved plans <strong>and</strong> details <strong>and</strong><br />

in accord with the imposed conditions,<br />

(b) Arrangements for the holding of regular bi-monthly liaison meetings<br />

between representatives of the developer, their contractors as<br />

necessary, <strong>and</strong> the Local Planning Authority to review progress <strong>and</strong><br />

compliance with this permission <strong>and</strong> subsequently approved details,<br />

(c) The procedure to be followed by the developer as regards notification<br />

to the Local Planning Authority in the event that changes become<br />

necessary to the approved development or details or become known to<br />

(d)<br />

have been carried out,<br />

Contact details for those representatives of the developer who have<br />

responsibility for the monitoring <strong>and</strong> implementation of the<br />

development, including ongoing construction works on site <strong>and</strong><br />

quality assurance, as well as contact details in the event of an<br />

emergency or need for out of hours contact.<br />

Reason:<br />

To ensure that appropriate measures are taken to ensure that the<br />

development is carried out in accordance with the approved plans, details<br />

<strong>and</strong> conditions, <strong>and</strong> to the quality <strong>and</strong> design set out in the application<br />

documents with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005<br />

policies Ho9, Ho13, Pc4, Pc8, <strong>and</strong> National Planning Policy PPS1 <strong>and</strong> PPS3,<br />

<strong>and</strong> in order that the impacts of the development are mitigated in accordance<br />

with the Environmental Statement.<br />

3. No development shall take place until details of a Sustainable urban<br />

Drainage Scheme (SuDS) have been submitted to <strong>and</strong> been approved in<br />

writing by the Local Planning Authority. The development works shall be<br />

carried out in accordance with the approved SuDS details <strong>and</strong> a final<br />

verification survey <strong>and</strong> inspection report shall be submitted to <strong>and</strong> agreed in<br />

writing by the Local Planning Authority, prior to 50% occupation of the<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

dwelling units comprising the development the subject of this specific<br />

consent.<br />

Reason:<br />

To ensure that the site is satisfactorily drained in accordance with <strong>Reigate</strong><br />

<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4 <strong>and</strong> PPS25.<br />

4. The drainage scheme referred to in condition 2 shall include details of both<br />

existing ground levels, proposed ground levels <strong>and</strong> the proposed finished<br />

ground floor levels of the buildings. The development shall be carried out in<br />

accordance with the approved levels. All finished floor levels shall be set at<br />

no lower than 500mm above the 1 in 100 + 20% flood level.<br />

Reason:<br />

To ensure the Local Planning Authority is satisfied that the proposal would<br />

not exacerbate flood risk to existing <strong>and</strong> proposed dwellings, to ensure that it<br />

has an appropriate relationship with adjoining development <strong>and</strong> to<br />

safeguard the visual amenities of the locality with regard to <strong>Reigate</strong> <strong>and</strong><br />

<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ho9 <strong>and</strong> Ut3.<br />

5. No development shall take place until:<br />

(a)<br />

(b)<br />

An archaeological evaluation has been carried out in accordance with a<br />

methodology submitted to <strong>and</strong> approved by the Local Planning<br />

Authority, in writing, prior to the commencement of the evalution itself;<br />

<strong>and</strong><br />

The applicant has secured the implementation of a programme of<br />

archaeological work in accordance with the recommendations of the<br />

archaeological evaluation referred to in (a) above <strong>and</strong> submitted to <strong>and</strong><br />

approved by the Local Planning Authority, in writing, prior to the<br />

commencement of the works themselves.<br />

Reason:<br />

To minimise the likelihood that any unidentified archaeology is destroyed<br />

during the construction of the development with regard to <strong>Reigate</strong> <strong>and</strong><br />

<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Pc8.<br />

6. No development shall take place until protective fencing, details of which<br />

shall be submitted to <strong>and</strong> be approved in writing by the Local Planning<br />

Authority prior to erection, has been erected around areas of identified<br />

archaeological importance to secure an area where no works shall take place.<br />

Reason:<br />

To minimise the likelihood that any unidentified archaeology is destroyed<br />

during the construction of the development with regard to <strong>Reigate</strong> <strong>and</strong><br />

<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Pc8 <strong>and</strong> in order that the impacts of<br />

the development are mitigated in accordance with the Environmental<br />

Statement.<br />

7. No development works shall take place in respect of ‘Block B’, as indicated<br />

on the plans, a specification for the full repair <strong>and</strong> restoration of Tanyard<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Barn <strong>and</strong> its setting shall be submitted to <strong>and</strong> approved in writing by the<br />

Local Planning Authority. These works shall be carried out in accordance<br />

with the agreed specification <strong>and</strong> completed in full to the satisfaction of the<br />

Local Planning Authority prior to the occupation of the final dwelling of this<br />

specific complete phase of the development. Emergency repairs to ensure the<br />

barn is wind, weather tight <strong>and</strong> stable shall be carried out within two months<br />

of this consent in accordance with details approved in writing, in advance, by<br />

the Local Planning Authority.<br />

Reason:<br />

In order to preserve the listed building in accordance with policy Pc9 of the<br />

<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />

8. Notwithst<strong>and</strong>ing the drawings hereby approved, the final detail of the<br />

‘Central Green’ shall be submitted to <strong>and</strong> approved in writing by the Local<br />

Planning Authority, prior to the commencement of the Neighbourhood<br />

Centre. The submitted details should include full specification of the<br />

recycling area (achieved in consultation with the <strong>Council</strong>’s Neighbourhood<br />

Services) <strong>and</strong> also the provision of increased visitor parking. The ‘Central<br />

Green’ area shall be completed in accordance with the approved details.<br />

Reason:<br />

In order that waste reduction <strong>and</strong> recycling is appropriately accommodated<br />

<strong>and</strong> to ensure that the development should not prejudice highway safety nor<br />

cause inconvenience to highway users, with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />

<strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Mo5.<br />

9. No development works shall take place in respect of the construction of the<br />

neighbourhood centre, until details of the fenestration <strong>and</strong> materials to be<br />

used in the facades of the shop <strong>and</strong> office units have been submitted to <strong>and</strong><br />

approved in writing by the Local Planning Authority. The development shall<br />

be completed in accordance with the approved details.<br />

Reason:<br />

In order that the development achieves a suitable appearance in line with<br />

policy Sh2 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />

accordance with the Horley Design Guide.<br />

10. Unless otherwise agreed in writing by the Local Planning Authority, no<br />

development in respect of the Tanyard Farm area of the site shall take place<br />

until parts (a) to (e) of this condition have been complied with.<br />

Site Characterisation<br />

(a)<br />

A site investigation proposal, detailing the extent <strong>and</strong> methodologies<br />

of sampling <strong>and</strong> analyses required to enable the characterisation of the<br />

plausible pollutant linkages identified in the preliminary conceptual<br />

model, shall be submitted to the Local Planning Authority <strong>and</strong> is<br />

subject to the written approval in writing of the Local Planning<br />

Authority, <strong>and</strong> any additional requirements that it may specify, prior<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

(b)<br />

to any site investigation being commenced on site. Following<br />

approval, the Local Planning Authority shall be given a minimum of<br />

two weeks written notice of the commencement of site investigation<br />

works;<br />

A site investigation <strong>and</strong> risk assessment, undertaken in accordance<br />

with the site investigation proposal as approved that determines the<br />

extent <strong>and</strong> nature of contamination on site <strong>and</strong> is reported in<br />

accordance with the st<strong>and</strong>ards of DEFRA’s <strong>and</strong> the Environment<br />

Agency’s Model Procedures for the Management of Contaminated<br />

L<strong>and</strong> (CLR 11), shall be submitted to the Local Planning Authority <strong>and</strong><br />

is subject to the approval in writing of the Local Planning Authority<br />

<strong>and</strong> any additional requirements that it may specify;<br />

Remediation<br />

(c)<br />

(d)<br />

A remediation method statement, detailing the extent <strong>and</strong> method(s)<br />

by which the site is to be remediated, to ensure that unacceptable risks<br />

are not posed to identified receptors at the site <strong>and</strong> details of the<br />

information to be included in a validation report, has been submitted<br />

to <strong>and</strong> approved in writing by the Local Planning Authority, <strong>and</strong> any<br />

additional requirements that it may specify, prior to the remediation<br />

being commenced on site. The Local Planning Authority shall then be<br />

given a minimum of two weeks written notice of the commencement<br />

of remediation works;<br />

Prior to the occupation of the development remediation works at the<br />

site shall have been completed in accordance with the approved<br />

remediation method statement <strong>and</strong> any post remediation monitoring<br />

identified in the remediation method statement shall be installed by<br />

the developer <strong>and</strong> maintained <strong>and</strong> operated for as long as identified by<br />

the remediation method statement;<br />

Submission of Validation Information<br />

(e)<br />

A comprehensive validation report for the site shall be submitted prior<br />

to occupation. The report shall detail evidence of the remediation, the<br />

effectiveness of the remediation carried out <strong>and</strong> the results of post<br />

remediation monitoring, in accordance with the approved remediation<br />

method statement <strong>and</strong> any addenda thereto, so as to enable future<br />

interested parties, including regulators, to have a single record of the<br />

remediation undertaken at the site. The validation report is subject to<br />

the approval, in writing of the Local Planning Authority <strong>and</strong> any<br />

additional requirements that it may specify;<br />

Action for Unexpected Contamination<br />

(f)<br />

Contamination not previously identified by the site investigation, but<br />

subsequently found to be present at the site, shall result in all<br />

development ceasing on site until an addendum to the remediation<br />

method statement, detailing how the unsuspected contamination is to<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

be dealt with, has been submitted in writing to the Local Planning<br />

Authority. The remediation method statement is subject to the written<br />

approval of the Local Planning Authority <strong>and</strong> any additional<br />

requirements that it may specify.<br />

Reason:<br />

To ensure that the proposed development <strong>and</strong> any site investigations<br />

<strong>and</strong> remediation will not cause harm to human health or pollution of<br />

controlled waters, with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong><br />

Local Plan 2005 Policy Ho9 <strong>and</strong> PPS23.<br />

11. No development works, including ground preparation <strong>and</strong> all construction<br />

activities, shall take place until all related arboricultural matters have been<br />

undertaken <strong>and</strong> completed in strict accordance with the approved details.<br />

This pertains to the pre-commencement site meeting <strong>and</strong> tree protection<br />

measures contained on the Tree Protection Plan (TPP) BLC110107 REV B,<br />

dated 17 February 2011 <strong>and</strong> Arboricultural Method Statement (AMS),<br />

compiled by Bourne L<strong>and</strong>scape Consultants, dated February 2011.<br />

Reason:<br />

To ensure good arboricultural practice in the interests of the maintenance of<br />

the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with policies Pc4 <strong>and</strong><br />

Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> the<br />

recommendations within British St<strong>and</strong>ard: 5837.<br />

12. No development works, including ground preparation <strong>and</strong> any<br />

construction activity, shall take place until a scheme for the arboricultural<br />

supervision <strong>and</strong> monitoring of the arboricultural method statement<br />

<strong>and</strong> tree protection measures approved <strong>and</strong> required in Condition 11 has<br />

been submitted <strong>and</strong> approved in writing by the local planning authority.<br />

The scheme shall provide timings <strong>and</strong> methods of site visits <strong>and</strong> reporting<br />

procedures.<br />

Reason:<br />

To ensure good arboricultural practice in the interests of the maintenance of<br />

the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with policies Pc4,<br />

Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> the<br />

recommendations within British St<strong>and</strong>ard 5837.<br />

Prescriptive Conditions<br />

13. All hard <strong>and</strong> soft l<strong>and</strong>scaping shall be carried out in strict accordance with<br />

the approved documents <strong>and</strong> drawings complied by Bourne L<strong>and</strong>scape<br />

Consultants, reference BLC100179-1 REV G, BLC100179-2 REV G,<br />

BLC100179-3 REV G, BLC100180-1 REV F, BLC100180-2 REV F, BLC100180-3<br />

REV F, BLC100180-4 REV F. The l<strong>and</strong>scaping work shall be completed in<br />

full accordance with the approved scheme, prior to occupation or in<br />

accordance with an implementation programme to be agreed in writing with<br />

the local planning authority.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Any trees shrubs or plants planted in accordance with this condition which<br />

are removed, die or become damaged or diseased within five years of<br />

planting shall be replaced within the next planting season by trees/shrubs of<br />

the same size <strong>and</strong> species in the same location.<br />

Reason:<br />

To ensure good arboricultural <strong>and</strong> l<strong>and</strong>scape practice in the interests of the<br />

maintenance of the character <strong>and</strong> appearance of the area <strong>and</strong> to comply with<br />

policies Pc4, Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />

14. The development hereby permitted shall be carried out in accordance with<br />

the following approved plans:<br />

Drawing No:<br />

Rev:<br />

H5117/LP/01 -<br />

H5117/PS/008 -<br />

H5117/MPL/01<br />

H<br />

H5117/PL/01<br />

H<br />

H5117/MDL/01<br />

G<br />

H5117/ML/01<br />

G<br />

H5117/CRP/01<br />

F<br />

H5117/PP/01<br />

A<br />

H5117/SHL/01<br />

D<br />

H5117/TR/01<br />

B<br />

H5117/TR/02<br />

B<br />

BLC-1101-07<br />

B<br />

110228/DWH/BSC -<br />

BLC100179-1<br />

G<br />

BLC100179-2<br />

G<br />

BLC100179-3<br />

G<br />

BLC100180-1<br />

F<br />

BLC100180-2<br />

F<br />

BLC100180-3<br />

F<br />

BLC100180-4<br />

F<br />

S2811/01 -<br />

BLC100165 -<br />

BLC100165 #1 -<br />

BLC100165 #2 -<br />

BLC100165 #3 -<br />

BLC100165 #4 -<br />

BLC100165 #5 -<br />

BLC100165 #6 -<br />

H5117/CB/01 -<br />

H5117/SW/01 -<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

H5117/LSW/01 -<br />

H5117/GG/01 -<br />

H5117/PF/01 -<br />

H5117/PR/01 -<br />

Garages G1D -<br />

Garages G1H -<br />

Garages G2P -<br />

Garages G2H -<br />

Garages G4H -<br />

Pergola -<br />

Roof Link (Between Plots 316 & 317) -<br />

H5117/SS/01<br />

C<br />

H5117/SS/02<br />

B<br />

S2BFNTB5 Floor Plans & Elevations AS<br />

A<br />

S2BFNTH5 Floor Plans & Elevations AS<br />

A<br />

S2BFNTE5 Floor Plans & Elevations OPP<br />

A<br />

S2BFNTH5 Floor Plans & Elevations OPP<br />

A<br />

R231NTH5 Floor Plans & Elevations AS<br />

B<br />

R382NBI5 Floor Plans & Elevations AS<br />

B<br />

R382NBE5 Floor Plans & Elevations AS<br />

B<br />

R382NRE5 Floor Plans & Elevations OPP<br />

B<br />

R382NBI5 Floor Plans & Elevations OPP<br />

B<br />

R382NBE5 Floor Plans & Elevations OPP<br />

B<br />

T306NBE5 Floor Plans & Elevations AS<br />

B<br />

T306NBE5 Floor Plans & Elevations OPP<br />

B<br />

S341NRE5 Floor Plans & Elevations AS<br />

A<br />

S341NRE5 Floor Plans & Elevations OPP<br />

A<br />

R332NBE5 Floor Plans & Elevations AS<br />

B<br />

R360RHE4 Floor Plans & Elevations AS<br />

C<br />

R360BHE4 Floor Plans & Elevations OPP<br />

B<br />

R360THE4 Floor Plans & Elevations OPP<br />

C<br />

S375NBE4 Floor Plans & Elevations AS<br />

B<br />

S375NBI4 Floor Plans & Elevations AS<br />

B<br />

S375RHE4 Floor Plans & Elevations AS<br />

B<br />

S375NRI4 Floor Plans & Elevations AS<br />

B<br />

S375THI4 Floor Plans & Elevations AS<br />

B<br />

S375NBE4 Floor Plans & Elevations OPP<br />

B<br />

S375THE4 Floor Plans & Elevations OPP<br />

B<br />

R406NB-5 Floor Plans & Elevations AS<br />

B<br />

R406NB-5 Floor Plans & Elevations OPP<br />

B<br />

S433NTB5 Floor Plans & Elevations AS<br />

C<br />

S433NTB5 Floor Plans & Elevations OPP<br />

C<br />

S469NTH5 Elevations AS<br />

A<br />

S469NR-5 Elevations AS<br />

A<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

S469NTH5 / NB-5 / NR-5 / NTB5 Floor Plans AS C<br />

S469NTH5 Elevations OPP<br />

B<br />

S469NTH5 / NB-5 / NR-5 / NTB5 Floor Plans OPP C<br />

S436NT25 Elevations AS<br />

B<br />

S436NT25 Floor Plans AS<br />

B<br />

S436NT25 Elevations OPP<br />

B<br />

S436NT25 Floor Plans OPP<br />

B<br />

S436NT16 Elevations AS<br />

B<br />

S436NT16 Floor Plans AS<br />

B<br />

S436NT16 Elevations OPP<br />

B<br />

S436NT16 / NB-5 Floor Plans OPP<br />

C<br />

S436NB-5 Elevations OPP<br />

A<br />

S042NB-5 Elevations AS<br />

C<br />

S042NB-5 Floor Plans AS<br />

C<br />

S042NB-5 Elevations OPP<br />

B<br />

S042NTH5 Elevations OPP<br />

B<br />

S042NB-5 / S0421NTH5 Floor Plans OPP<br />

B<br />

S577NR-4 Elevations AS<br />

A<br />

S577NR-4 Floor Plans AS<br />

A<br />

S577NR-4 Elevations OPP<br />

A<br />

S577NR-4 Floor Plans OPP<br />

A<br />

S5BDNTH5 Elevations AS<br />

B<br />

S5BDNTB5 Elevations AS<br />

B<br />

S5BDNTB5 / S5BDNTH5 Floor Plans AS<br />

B<br />

R579NEH4 Elevations AS<br />

B<br />

R579NEH4 Plans AS<br />

B<br />

R579NEH4 Elevations OP<br />

B<br />

R579NEH4 Plans OP<br />

B<br />

S375BHE4 Floor Plans & Elevs Shown OPP<br />

B<br />

S2BFNTB5 Floor Plans & Elevs Shown OPP<br />

A<br />

BLC 110115 - 1<br />

A<br />

600, 601 A<br />

602, 603 A<br />

604, 605 C<br />

606, 607 A<br />

608, 609, 610 A<br />

611, 612 A<br />

613, 614, 615 A<br />

616, 617 A<br />

620, 621 A<br />

622, 623 A<br />

624, 625, 626 A<br />

627, 628 A<br />

629, 630 A<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

631, 632, 633 A<br />

634, 635 A<br />

636, 637 A<br />

638, 639, 640 A<br />

641, 642 A<br />

643 Rev B, 644 A<br />

645, 646 A<br />

647, 648 A<br />

651, 652 A<br />

655, 656 A<br />

659, 660 A<br />

662, 663, 664 A<br />

666, 667, 668 A<br />

671, 672 A<br />

673, 674 A<br />

675, 676 A<br />

677, 678, 679 A<br />

680, 681 A<br />

682, 683, 684, 685, 686, 687 A<br />

688, 689, 690 A<br />

691, 692, 693 A<br />

694, 695, 696 A<br />

530, 531 B<br />

532, 533, 534 B<br />

535, 536, 537 B<br />

400, 401 C<br />

Reason:<br />

In accordance with “Greater Flexibility for Planning Permissions Guidance”<br />

(DCLG) 2010.<br />

15. The development hereby permitted shall be carried out in accordance with<br />

the approved Phase 1 L<strong>and</strong>scape <strong>and</strong> Ecology Management Plan report<br />

M1273_18d, produced by Waterman CPM, dated 8 December 2008, prior to<br />

the occupation of any dwelling within the development.<br />

Reason:<br />

In order that the impacts of the development are mitigated in accordance<br />

with the Environmental Statement, <strong>and</strong> to ensure that the interests of nature<br />

conservation are preserved, in accordance with policy Pc2G of the <strong>Reigate</strong><br />

<strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />

16. Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country Planning (General<br />

Permitted Development) Order 1995 (or any order revoking <strong>and</strong> re-enacting<br />

that Order, with or without modification) no domestic extensions shall be<br />

erected without the prior written approval of the Local Planning Authority.<br />

Reason:<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

To control any subsequent enlargements of dwellings in the interests of the<br />

visual <strong>and</strong> residential amenities of the locality with regard to <strong>Reigate</strong> <strong>and</strong><br />

<strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Ho16.<br />

17. The integrated duct <strong>and</strong> chimney system within ‘Block A’ of the development<br />

hereby approved shall be installed in accordance with the approved details<br />

<strong>and</strong> thereafter retained.<br />

Reason:<br />

In the interests preserving <strong>and</strong> the visual amenities of the locality with regard<br />

to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Sh2.<br />

18. The shop units within the neighbourhood centre shall be restricted to Class<br />

A1 as defined by the Town <strong>and</strong> Country Planning Use Classes Order 1987 (as<br />

amended), <strong>and</strong> the office units shall not be used for Classes B2 or B8 of that<br />

order.<br />

Reason:<br />

To ensure that an appropriate mix of units is achieved for residents <strong>and</strong> that<br />

the units are not detrimental to the amenities of adjoining residents, with<br />

regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong><br />

Hr20.<br />

19. During the construction phase all liquid hydrocarbon based fuels <strong>and</strong><br />

lubricants shall be bunded to 110% of the volume of the container in which<br />

they are stored. Any container of liquid or hydrocarbon based fuels <strong>and</strong><br />

lubricants shall be stored in a secure location. All operations involving the<br />

transfer from container to vehicle or machinery (or visa versa) shall be on<br />

hard st<strong>and</strong>ing laid to a fall to a three stage interceptor.<br />

Reason:<br />

To prevent the contamination that would result in unacceptable degradation<br />

of soil quality with regard to the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan<br />

2005 policy Ho9 <strong>and</strong> in order that the impacts of the development are<br />

mitigated in accordance with the Environmental Statement.<br />

20. No spoil or materials shall be deposited or stored on that part of the site lying<br />

within the 1 in 100 year floodplain unless otherwise agreed by the Local<br />

Planning Authority.<br />

Reason:<br />

To prevent the increased risk of flooding due to impedance of flood flows<br />

<strong>and</strong> reduction of flood storage capacity with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />

<strong>Borough</strong> Local Plan 2005 policy Ut3.<br />

21. The buildings shall be constructed with finished floor levels set at no lower<br />

than 500mm above the 1 in 100 + 20% flood level.<br />

Reason:<br />

To ensure that the development is subject to minimum risk of flooding with<br />

regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut3.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

22. Unless otherwise agreed by the Local Planning Authority, there shall be no<br />

storage of materials within 8 metres of the Burstow Stream <strong>and</strong> 5 metres of all<br />

other watercourses <strong>and</strong> waterbodies on the site; these must be suitably<br />

marked <strong>and</strong> protected during development, with fencing erected on the<br />

l<strong>and</strong>ward side of the buffer zone, <strong>and</strong> there shall be no access during<br />

development within this area. There shall be no fires, dumping or tracking of<br />

machinery within this area.<br />

Reason:<br />

To reduce the impact of the proposed development on wildlife habitats<br />

upstream <strong>and</strong> downstream, including bankside habitats with regard to<br />

<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4.<br />

Note: Any proposed works within 8m of the Burstow Stream should gain<br />

permission from the Environment Agency regardless of any Local Authority<br />

permissions.<br />

23. Unless otherwise agreed by the Local Planning Authority, all water crossings<br />

shall be by clear spanning structures (from banktop to banktop) that will not<br />

impede the river corridor <strong>and</strong> allow the migration of both channel <strong>and</strong> bank<br />

species. The design should include the provision of passes for wildlife.<br />

Reason:<br />

This will maintain a continuous buffer strip <strong>and</strong> provide a corridor for the<br />

passage of wildlife <strong>and</strong> reduce the risk of pollution from run-off <strong>and</strong> flood<br />

risk with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Ut4.<br />

24. The internal widths of the garaging hereby approved shall be no less than 2.7<br />

metres along their width, with garage doors not less than 2.3 metres wide.<br />

Reason:<br />

In order that the development should not prejudice highway safety nor cause<br />

inconvenience to other highway users with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />

<strong>Borough</strong> Local Plan 2005 policy Mo7.<br />

25. Notwithst<strong>and</strong>ing the drawings hereby approved, the proposed external<br />

finishing materials <strong>and</strong> details shall be carried out using those specified<br />

below <strong>and</strong> there shall be no variation without the prior approval in writing<br />

of the Local Planning Authority:<br />

(a) All casements shall have casements in each opening <strong>and</strong> glazing bars of<br />

traditional profile;<br />

(b) All horizontally divided windows with public elevations shall be<br />

vertically sliding sashes with glazing bars of traditional profile, set back<br />

behind the reveal at one brick depth;<br />

(c) All box ends shall be omitted; <strong>and</strong><br />

(d) All windows in brickwork shall have gauged brick arches.<br />

Reason:<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

In order that the development achieves a suitable appearance in line with<br />

policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />

accordance with the Horley Design Guide.<br />

26. Units 302-309 shall have wooden, vertically sliding sash windows with<br />

glazing bars of traditional profile, set back behind the reveal at one brick<br />

depth on their public elevations.<br />

Reason:<br />

In order to aid in defining these dwellings as l<strong>and</strong>mark buildings at a focal<br />

point within the development <strong>and</strong> increase legibility of the neighbourhood,<br />

in accordance with policies Ho9 <strong>and</strong> Ho13 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong><br />

<strong>Borough</strong> Local Plan 2005, <strong>and</strong> the Horley Design Guide.<br />

27. The development hereby permitted shall be finished utilising the materials<br />

palette permitted under reference 04/01778/DET09, discharged by letter<br />

dated 27 November 2008.<br />

Reason:<br />

To ensure that a satisfactory external appearance is achieved of the<br />

development with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local 2005<br />

policies Ho9 <strong>and</strong> Ho13.<br />

28. Notwithst<strong>and</strong>ing the drawings hereby permitted, the bollards <strong>and</strong><br />

l<strong>and</strong>scaping shown on the Masterplan to the front of plots 322, 362 <strong>and</strong> 387<br />

shall be omitted to allow the through flow of vehicular traffic.<br />

Reason:<br />

To improve the permeability of the site for both residents <strong>and</strong> service<br />

vehicles, in accordance with policy Ho9 <strong>and</strong> the Surrey Design Guide.<br />

29. Notwithst<strong>and</strong>ing the plans hereby approved, the garden boundary treatment<br />

for units 300 <strong>and</strong> 302 where they border the swale shall be 1.8 metre brick<br />

screen wall.<br />

Reason:<br />

In order that the development achieves a suitable appearance in line with<br />

policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005.<br />

30. The shop units hereby permitted shall only be open between 08.00hrs-<br />

23.00hrs unless otherwise approved in writing by the Local Planning<br />

Authority.<br />

Reason:<br />

To control activity in the interests of neighbouring residential amenities<br />

with regard to <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policy Sh2.<br />

Pre-Occupation Conditions<br />

32. No dwelling shall be occupied until a waste strategy has been submitted to<br />

<strong>and</strong> approved by the Local Planning Authority. This strategy will be<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

implemented as approved, subject to any amendments agreed with the Local<br />

Planning Authority. The strategy shall include the incorporation of recycling<br />

facilities at the neighbourhood centre <strong>and</strong> measures to promote recycling <strong>and</strong><br />

waste minimisation throughout the development.<br />

Reason:<br />

To encourage waste reduction <strong>and</strong> recycling wherever possible in accord<br />

with policy Ho9 of the <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 <strong>and</strong> in<br />

order that the impacts of the development are mitigated in accordance with<br />

the Environmental Statement.<br />

33. Before the first <strong>and</strong> each subsequent occupation of the school the subject of<br />

the application, a Travel Plan, in accordance with the aims <strong>and</strong> objectives of<br />

PPG13, shall be submitted to <strong>and</strong> approved in writing by the Local Planning<br />

Authority. This shall be implemented in accordance with the details to be<br />

submitted <strong>and</strong> thereafter retained <strong>and</strong>/or amended to the satisfaction of the<br />

Local Planning Authority.<br />

Reason:<br />

In recognition of <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> 2005 policy Mo7 <strong>and</strong><br />

Planning Policy Guidance Note 13 – Transport.<br />

34. Prior to the occupation of any dwelling within the specific phase of<br />

development hereby permitted a l<strong>and</strong>scape, drainage <strong>and</strong> ecology<br />

management plan for the development shall be submitted to <strong>and</strong> be<br />

approved in writing by the Local Planning Authority. The submitted details<br />

of the management plan shall include long term design objectives,<br />

management responsibilities <strong>and</strong> maintenance schedules for all l<strong>and</strong>scape<br />

areas, drainage areas, the scheduled ancient monument at Scotchman's<br />

Copse, the community hall <strong>and</strong> any other spaces which are to remain in joint<br />

private ownership, (other than small, privately owned, domestic gardens).<br />

The l<strong>and</strong>scape, drainage <strong>and</strong> ecology management plan shall be carried out<br />

<strong>and</strong> implemented in full accordance with the approved details.<br />

Reason:<br />

To preserve <strong>and</strong> enhance the visual amenities of the locality with regard to<br />

<strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> Local Plan 2005 policies Ho9 <strong>and</strong> Ut2 <strong>and</strong> in<br />

order that the impacts of the development are mitigated in accordance with<br />

the Environmental Statement.<br />

35. Prior to 50% occupation of the dwellings within the specific phase of<br />

development hereby permitted, a detailed design shall be submitted to the<br />

Local Planning Authority for a local network of pedestrian <strong>and</strong> cycle routes<br />

which shall include the following:<br />

(a) Provision of appropriate signage <strong>and</strong> directional indicators; <strong>and</strong><br />

(b) The provision of safe crossings between the spine network <strong>and</strong> new<br />

access roads within the development, into the existing urban area, <strong>and</strong><br />

the areas identified in the Local Plan.<br />

Reason:<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

To ensure the provision of a local network of pedestrian <strong>and</strong> cycle routes <strong>and</strong><br />

encourage a modal shift away from private car usage as an integral part of<br />

comprehensive development proposals in Horley with regard to <strong>Reigate</strong> <strong>and</strong><br />

<strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> Local Plan 2005 policy Hr23.<br />

INFORMATIVES<br />

1. Your attention is drawn to the safety benefits of installing sprinkler systems<br />

as an integral part of new development. Further information is available at<br />

www.firesprinklers.info.<br />

2. The applicant is advised that prior to the initial occupation of any communal<br />

dwellings or flats, wheeled refuse bins conforming to British St<strong>and</strong>ard<br />

BSEN840, separate recycling bins for paper/card <strong>and</strong> mixed cans, <strong>and</strong><br />

storage facilities for the bins should be installed by the developer prior to the<br />

initial occupation of any dwelling hereby permitted. Further details on the<br />

required number <strong>and</strong> specification of wheeled bins <strong>and</strong> recycling boxes is<br />

available from the <strong>Council</strong>’s Neighbourhood Services on 01737 276501 or<br />

01737 276097, or on the <strong>Council</strong>’s website at www.reigate-banstead.gov.uk.<br />

Bins <strong>and</strong> boxes meeting the specification may be purchased from any<br />

appropriate source, including the <strong>Council</strong>’s Neighbourhood Services Unit on<br />

01737 276775.<br />

3. You are advised that the <strong>Council</strong> will expect the following measures to be<br />

taken during any building operations to control noise, pollution <strong>and</strong> parking:<br />

(a) Work that is audible beyond the site boundary should only be carried out<br />

between 08:00hrs to 18:00hrs Monday to Friday, 08:00hrs to 13:00hrs<br />

Saturday <strong>and</strong> not at all on Sundays or any Public <strong>and</strong>/or Bank Holidays;<br />

(b) The quietest available <strong>item</strong>s of plant <strong>and</strong> machinery should be used on<br />

site. Where permanently sited equipment such as generators are<br />

necessary, they should be enclosed to reduce noise levels;<br />

(c) Deliveries should only be received within the hours detailed in (a) above;<br />

(d) Adequate steps should be taken to prevent dust-causing nuisance beyond<br />

the site boundary. Such uses include the use of hoses to damp down<br />

stockpiles of materials, which are likely to generate airborne dust, to<br />

damp down during stone/slab cutting; <strong>and</strong> the use of bowsers <strong>and</strong> wheel<br />

washes;<br />

(e) There should be no burning on site;<br />

(f) Only minimal security lighting should be used outside the hours stated<br />

above; <strong>and</strong><br />

(g) Building materials <strong>and</strong> machinery should not be stored on the highway<br />

<strong>and</strong> contractors’ vehicles should be parked with care so as not to cause an<br />

obstruction or block visibility on the highway.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

Further details of these noise <strong>and</strong> pollution measures can be obtained from<br />

the <strong>Council</strong>’s Environmental Health Services Unit.<br />

In order to meet these requirements <strong>and</strong> to promote good neighbourliness,<br />

the <strong>Council</strong> recommends that this site is registered with the Considerate<br />

Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration.<br />

4. The permission hereby granted shall not be construed as authority to carry<br />

out works on the highway. The applicant is advised that a licence must be<br />

obtained from the Highway Authority Local Transportation Service before<br />

any works are carried out on any footway, footpath, carriageway, verge or<br />

other l<strong>and</strong> forming part of the highway.<br />

5. Refuse areas should be no further than 9 metres from the highway on a level<br />

hard st<strong>and</strong>ing with a drop down kerb in order to be collected by<br />

Neighbourhood Services.<br />

6. There is an Ordinary Watercourse crossing the site, near the eastern<br />

boundary. Any proposal to alter, stop up, culvert, or connect to any<br />

watercourse, or building within 9 metres of the said watercourse, requires<br />

prior written consent from both the Local L<strong>and</strong> Drainage Authority<br />

(<strong>Reigate</strong> & <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong> - Contact: Peter Russell, 01737<br />

276606), <strong>and</strong> the Environment Agency (01276 454300).<br />

7. The applicant should be aware of the British St<strong>and</strong>ard Code of Practice for<br />

the safe use of cranes, which requires crane operators to consult the<br />

aerodrome (in this case Gatwick) before erecting a crane in close proximity to<br />

it.<br />

8. The development is close to the Gatwick aerodrome <strong>and</strong> the approach to the<br />

runway. On this basis the applicant should be aware of the need to<br />

carefully design lighting proposals which is further explained in Advice<br />

Note 2, “Lighting near Aerodromes”. Please note that the Air Navigation<br />

Order 2005, Article 135 grants the Civil Aviation Authority power to serve<br />

notice to extinguish or screen lighting which may cause aircraft danger.<br />

9. The applicant is advised of the benefit of installing strengthened corners<br />

within the site where there are tight turning heads in order that refuse <strong>and</strong><br />

other large vehicles may enter <strong>and</strong> leave the site without causing damage to<br />

verges. Please contact Neighbourhood Services on 01737 276097 to discuss<br />

the matter.<br />

10. The applicant is advised that future residents of the development should be<br />

informed that bin collection shall take place to the front of dwellings by the<br />

kerbside <strong>and</strong> not within parking courts.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

REASON FOR PERMISSION<br />

The development hereby permitted has been assessed against development plan<br />

policies SP3, CC4, CC6, H1, H2, H4, H5, NRM10, NRM11, GAT1, GAT2, GAT3,<br />

Pc2G, Pc4, Pc5, Pc8, Pc9, Ho2, Ho3, Ho9, Ho9A, Ho10, Ho13, Ho20, Re2, Re3, Re4,<br />

Re5, Re6, Re8, Ut1, Ut3, Ut4, Mo4, Mo5, Mo6, Mo7, Mo9, Mo11, Mo12, Mo13, Hr1,<br />

Hr2, Hr2A, Hr2B, Hr3, Hr16, Hr17, Hr19, Hr20, Hr21, Hr23, Hr24, Hr33, Hr36, Hr37,<br />

Hr38, Sh1, Sh2, Sh5, Sh10, Em1, Em2, Em3 <strong>and</strong> material considerations, including<br />

third party representations. It has been concluded that the development is in<br />

accordance with the development plan <strong>and</strong> there are no material considerations that<br />

justify refusal in the public interest.<br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx


04/01778/RM13 - HORLEY NE SECTOR PHASE 2, ORCHARD DRIVE,<br />

HORLEY<br />

Crown Copyright Reserved. <strong>Reigate</strong> <strong>and</strong> <strong>Banstead</strong> <strong>Borough</strong> <strong>Council</strong>.<br />

Licence No - 100019405-2006<br />

Scale<br />

1:3000


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL


THIS DOCUMENT HAS BEEN COPIED AND REDUCED - REFER TO ORIGINAL FOR DETAIL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!