English - EastPoint Sports
English - EastPoint Sports
English - EastPoint Sports
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table Tennis Table<br />
STEP 10<br />
NOTE: the position of “V” shape on linkage Tubes. Make sure all linkage Tubes are<br />
assembled correctly. V should point skyward and be located closer to the inner legs.<br />
IMPORTANT:<br />
Flat side of all Linkage<br />
Tubes should face all legs<br />
(As Shown Below)<br />
15<br />
14<br />
14<br />
15<br />
11<br />
Player End<br />
63<br />
62<br />
9<br />
FLAT SIDE<br />
FLAT SIDE<br />
14<br />
63<br />
62<br />
FLAT SIDE<br />
61<br />
61<br />
FLAT SIDE<br />
FLAT SIDE<br />
FLAT SIDE<br />
14 Right Linkage Tube x2<br />
15 Left Linkage Tube x2<br />
HARDWARE<br />
QTY.<br />
61 6.5 x 45mm Bolt x8<br />
62 6.5mm Nut x8<br />
There are Right Linkage Tubes & Left Linkage Tubes.<br />
NOTE: The position of “V” shape on Linkage Tubes and make sure all Linkage Tubes are<br />
assembled correctly.<br />
For each Linkage Tube, one end should be connected to inside of front leg and the<br />
other end should be connected to outside of inner legs. (See Diagram Above).<br />
Repeat for all 4 Linkage Tubes.<br />
Player End<br />
63 Bushing x8<br />
9