09.05.2015 Views

Proposed - Massachusetts Water Resources Authority

Proposed - Massachusetts Water Resources Authority

Proposed - Massachusetts Water Resources Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

There are still potential projects or required spending increases which are not yet funded as part of<br />

the FY13 <strong>Proposed</strong> CIP which are highlighted below:<br />

<br />

<br />

<br />

<br />

The Cross Harbor Cable may need a deeper installation or protective material as part of<br />

the harbor dredging project; additional costs could be as much as $20 million;<br />

The Chelsea Creek dredging initiative could cost as much as $10 million;<br />

Residual Asset Protection or the funding to rehabilitate or replace the existing Residuals<br />

Plant needs to be determined; and<br />

New regulatory mandates could represent potential risk for increased future spending.<br />

Project Level Budget Summaries and Detail of Changes<br />

Information on individual project budgets and detail of changes is provided in the supplemental<br />

appendices attached to this document.<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!