Sub-phase<br />

Fore River Siphons<br />

Construction<br />

B-W Replacement<br />

Pump Station<br />

Rehab Section 624<br />

Mill Cove Siphon<br />

Construction<br />

Construction –Rehab<br />

Community Tech<br />

Assistance<br />

Geotechnical<br />

Consultant<br />

Communication<br />

System<br />

Mill Cove Sluice<br />

Gates Construction<br />

Braintree-Weymouth<br />

Improvements<br />

Scope<br />

Construction of 36-inch, 3,900-feet long twin siphons beneath the Fore River from the<br />

Idlewell section of Weymouth to the southeast corner of the Exelon Energy site in North<br />

Weymouth. Constructing 1,000 linear feet of 36-inch to 54-inch new sewers in Idlewell.<br />

Construction of a new 28-mgd Braintree-Weymouth Pump Station which will handle<br />

flows from Hingham, Weymouth, and portions of Quincy.<br />

Rehabilitation of 2,000 feet of Section 624 in North Weymouth.<br />

Installation of 1,700 linear feet of 42-inch siphon pipe between Newell Playground and<br />

Aspinwall Street in North Weymouth to act as second barrel of existing Mill Cove<br />

Siphon.<br />

Interim rehabilitation of the existing Braintree-Weymouth Pump Station.<br />

Technical assistance for the Town of Weymouth for hydraulic modeling of its sewer<br />

system, leak detection for the water system, and mitigation.<br />

Consulting services related to the tunnel shaft excavation.<br />

Radio systems for the intermediate and replacement pump stations.<br />

Install gates which will allow staff to remotely flush out the site as needed, and will<br />

reduce odors.<br />

Several facility modifications are needed to improve facility safety, reliability, and<br />

performance. Design and construction improvements are required to address deficiencies<br />

in odor control, solids handling, and pumping operations. This project includes a study to<br />

determine deficiencies and corrections for the grinder room odor control, grinder<br />

equipment, and wastewater pumps.<br />

Expenditure Forecast (in $000s) and Project Status<br />

Total<br />

Budget<br />

Payments<br />

thru FY11<br />

Remaining<br />

Balance<br />

FY12 FY13 FY09-13 FY14-18 Beyond<br />

FY18<br />

$233,961 $227,932 $6,029 $1,079 $1,810 $15,789 $3,140 $0<br />

Braintree-Weymouth<br />

Relief Facilities<br />

Annual Spending<br />

$14<br />

$12<br />

$10<br />

$8<br />

$6<br />

$4<br />

$2<br />

$0<br />

$0.5 $0.3<br />

$12.0<br />

$1.1 $1.8 $1.1 $1.0<br />

$250<br />

$245<br />

$240<br />

$235<br />

$230<br />

$225<br />

$220<br />

$215<br />

Cummulative Spending<br />

Interception and Pumping - 18