- Page 1 and 2: Capital Improvement Program Propose
- Page 3 and 4: MASSACHUSETTS WATER RESOURCES AUTHO
- Page 5: FY13 Proposed Capital Improvement P
- Page 9 and 10: Highlights of changes from FY12 Fin
- Page 11 and 12: Transmission: ($6.9) million Winso
- Page 13 and 14: $3.4 billion of senior revenue bond
- Page 15 and 16: Please refer to Attachment C for a
- Page 17 and 18: Major Planned Spending for Fiscal Y
- Page 19 and 20: The following graph displays the va
- Page 21 and 22: Capital Improvement Program FISCAL
- Page 23 and 24: Project Budget Summaries and Detail
- Page 25 and 26: S. 104 Braintree-Weymouth Relief Fa
- Page 27 and 28: Project Status 11/11 97.4% Status a
- Page 29 and 30: Expenditure Forecast (in $000s) and
- Page 31 and 32: Project Status 11/11 35.2% Status a
- Page 33 and 34: FES/FERS Biofilters Design & Constr
- Page 35 and 36: Expenditure Forecast (in $000s) and
- Page 37 and 38: Equipment Prepurchase Technical Ass
- Page 39 and 40: Pump Station Feasibility MWRA consi
- Page 41 and 42: Expenditure Forecast (in $000s) and
- Page 43 and 44: Changes to Project Scope, Budget, a
- Page 45 and 46: Sub-phase Interceptor Renewal #4 Ev
- Page 47 and 48: Sub-phase NIH Electrical & Grit/Scr
- Page 49 and 50: Sub-phase Section 156 Design/Build
- Page 51 and 52: S. 146 Inspection of Deer Island Cr
- Page 53 and 54: S. 206 Deer Island Treatment Plant
- Page 55 and 56: Sub-phase Equipment Replacement: Cr
- Page 57 and 58:
Sub-phase Utilities: Heat Loop Pipe
- Page 59 and 60:
Sub-phase Specialties: Clarifier Re
- Page 61 and 62:
S. 210 Clinton Wastewater Treatment
- Page 63 and 64:
S. 211 Laboratory Services Project
- Page 65 and 66:
S. 271 Residuals Asset Protection P
- Page 67 and 68:
Expenditure Forecast (in $000s) and
- Page 69 and 70:
Channel, East Boston, and Alewife B
- Page 71 and 72:
MWRA’s NPDES permit and the varia
- Page 73 and 74:
Project South Dorchester Bay Sewer
- Page 75 and 76:
S. 339 North Dorchester Bay CSO Pro
- Page 77 and 78:
Project Status 11/11 96.9% Status a
- Page 79 and 80:
Expenditure Forecast (in $000s) and
- Page 81 and 82:
Explanation of Changes Revised cos
- Page 83 and 84:
Expenditure Forecast (in $000s) and
- Page 85 and 86:
Changes to Project Scope, Budget, a
- Page 87 and 88:
South Dorchester Bay Sewer Separati
- Page 89 and 90:
Explanation of Changes N/A CEB Imp
- Page 91 and 92:
of 2007, allowing DEP to issue a fi
- Page 93 and 94:
Expenditure Forecast (in $000s) and
- Page 95 and 96:
S. 359 Reserved Channel Sewer Separ
- Page 97 and 98:
S. 360 Brookline Sewer Separation P
- Page 99 and 100:
S. 361 Bulfinch Triangle Sewer Sepa
- Page 101 and 102:
S. 324 CSO Planning and Support Pro
- Page 103 and 104:
Explanation of Changes Project cos
- Page 105 and 106:
Changes to Project Scope, Budget, a
- Page 107 and 108:
Integrated Water Supply Improvement
- Page 109 and 110:
changes to comply with the Stage 2
- Page 111 and 112:
Sub-phase Walnut Hill Ultra Violet
- Page 113 and 114:
S. 543 Quabbin Water Treatment Plan
- Page 115 and 116:
S. 545 Blue Hills Covered Storage P
- Page 117 and 118:
S. 550 Spot Pond Storage Facility P
- Page 119 and 120:
Changes to Project Scope, Budget, a
- Page 121 and 122:
In September 2009 construction bega
- Page 123 and 124:
Sub-phase Owner Controlled Insuranc
- Page 125 and 126:
S. 615 Chicopee Valley Aqueduct Red
- Page 127 and 128:
S. 597 Winsor Station/Pipeline Impr
- Page 129 and 130:
Winsor Station/Pipeline Improvement
- Page 131 and 132:
Ware River Intake Valve Replacement
- Page 133 and 134:
Changes to Project Scope, Budget, a
- Page 135 and 136:
the impacted facilities. The first
- Page 137 and 138:
Watershed Land Annual Spending $4 $
- Page 139 and 140:
Expenditure Forecast (in $000s) and
- Page 141 and 142:
permitting, design and construction
- Page 143 and 144:
S. 677 Valve Replacement Project Pu
- Page 145 and 146:
S. 712 Cathodic Protection of Distr
- Page 147 and 148:
S. 730 Weston Aqueduct Supply Mains
- Page 149 and 150:
Sub-phase Construction - Boston WAS
- Page 151 and 152:
Explanation of Changes Project c
- Page 153 and 154:
Sub-phase Section 107 Phase 1 Const
- Page 155 and 156:
Sub-phase Redundancy Pipeline/Stora
- Page 157 and 158:
S. 719 Chestnut Hill Connecting Mai
- Page 159 and 160:
Project Status 11/11 58.5% Status a
- Page 161 and 162:
Sub-phase Pump Station Rehabilitati
- Page 163 and 164:
Sub-phase Section 89/29 Rehab Desig
- Page 165 and 166:
Completion of this project will fac
- Page 167 and 168:
S. 723 Northern Low Service Rehabil
- Page 169 and 170:
S. 702 New Connecting Mains - Shaft
- Page 171 and 172:
Project Status 11/11 33.5% Status a
- Page 173 and 174:
S. 693 Northern High Service - Reve
- Page 175 and 176:
Changes to Project Scope, Budget, a
- Page 177 and 178:
Project Status 11/11 39.1% Status a
- Page 179 and 180:
S.708 Northern Extra High Service -
- Page 181 and 182:
S. 735 Section 80 Rehabilitation Pr
- Page 183 and 184:
Sub-phase Communications Structures
- Page 185 and 186:
S. 763 Distribution Systems Facilit
- Page 187 and 188:
S. 765 Local Water Pipeline Assista
- Page 189 and 190:
S. 766 Waterworks Facility Asset Pr
- Page 191 and 192:
S. 933 Capital Maintenance Planning
- Page 193 and 194:
S. 881 Equipment Purchase Project P
- Page 195 and 196:
S.925 Technical Assistance Project
- Page 197 and 198:
Center and OCC infrastructure equip
- Page 199 and 200:
Sub-phase Phase VI (FY04-12) Scope
- Page 201 and 202:
Sub-phase DITP/OMS GIS/TV Inspectio
- Page 203 and 204:
S. 932 Environmental Remediation Pr
- Page 205 and 206:
S. 934 MWRA Facilities Management a
- Page 207 and 208:
S. 935 Alternative Energy Initiativ
- Page 209 and 210:
CEB Impacts Deer Island Wind Phase
- Page 211 and 212:
Understanding the Expenditure Forec
- Page 213 and 214:
Massachusetts Water Resources Autho
- Page 215 and 216:
Massachusetts Water Resources Autho
- Page 217 and 218:
Massachusetts Water Resources Autho
- Page 219 and 220:
Massachusetts Water Resources Autho
- Page 221 and 222:
Massachusetts Water Resources Autho
- Page 223 and 224:
Massachusetts Water Resources Autho
- Page 225 and 226:
Massachusetts Water Resources Autho
- Page 227 and 228:
Program / Project Contract No. Noti
- Page 229 and 230:
Program / Project Contract No. Noti
- Page 231 and 232:
Program / Project Contract No. Noti
- Page 233 and 234:
Program / Project Contract No. Noti
- Page 235 and 236:
Massachusetts Water Resources Autho
- Page 237 and 238:
Massachusetts Water Resources Autho
- Page 239 and 240:
Program / Project Contract No. Noti
- Page 241 and 242:
APPENDIX 3 New Capital Projects Add
- Page 243 and 244:
APPENDIX 4 Overview of the FY13 Pro
- Page 245 and 246:
Program and Project Total Budget Am
- Page 247 and 248:
APPENDIX 5 Master Plan/CIP Status
- Page 249 and 250:
Priority Four Important Projects Ri
- Page 251 and 252:
Monitor system needs and plan appro
- Page 253 and 254:
Appendix 5 Master Plan/CIP Status (
- Page 255 and 256:
Appendix 5 Master Plan/CIP Status (
- Page 257 and 258:
Appendix 5 Master Plan/CIP Status (
- Page 259 and 260:
Subphase/Project Appendix 6 Project
- Page 261 and 262:
Subphase/Project Total Contract Amo
- Page 263 and 264:
Subphase/Project Total Contract Amo
- Page 265 and 266:
Subphase/Project Total Contract Amo
- Page 267 and 268:
Subphase/Project Total Contract Amo
- Page 269 and 270:
Subphase/Project Total Contract Amo
- Page 271 and 272:
Subphase/Project Total Contract Amo
- Page 273 and 274:
Subphase/Project Total Contract Amo
- Page 275 and 276:
Subphase/Project Total Contract Amo
- Page 277 and 278:
Subphase/Project Total Contract Amo
- Page 279 and 280:
APPENDIX 7 Municipality and Project
- Page 281 and 282:
APPENDIX 7 PROJECT/MUNICIPALITY(s)
- Page 283 and 284:
Municipality Project Number/Project
- Page 285 and 286:
APPENDIX 8 MUNICIPALITY/PROJECT(s)
- Page 287 and 288:
APPENDIX 9 MWRA Completed Projects
- Page 289 and 290:
Appendix 9 S.117 Slade’s Siphon $
- Page 291 and 292:
Appendix 9 S.350 Union Park Detenti
- Page 293 and 294:
Appendix 9 S.615 Chicopee Valley Aq
- Page 295 and 296:
Appendix 9 S.714 Southern Extra Hig
- Page 297 and 298:
APPENDIX 10 Expected Useful Life of