Table 2<br />

FY13 <strong>Proposed</strong><br />

FY09 FY10 FY11 FY12 FY13<br />

Total<br />

FY09-13<br />

Projected Expenditures $182.2 $211.4 $139.3 $164.3 $191.4 $888.7<br />

Contingency 0.0 0.0 0.0 7.2 9.7 16.8<br />

Inflation on Unawarded Construction 0.0 0.0 0.0 0.0 1.5 1.5<br />

Less: Chicopee Valley Aqueduct Projects (0.6) (0.5) (0.9) (0.8) (5.4) (8.2)<br />

FY13 <strong>Proposed</strong> FY09-13 Cap $181.6 $210.9 $138.4 $170.7 $197.2 $898.8<br />

FY13 <strong>Proposed</strong> - Base-<br />

Line Cap<br />

FY09 FY10 FY11 FY12 FY13<br />

Total<br />

FY09-13<br />

Projected Expenditures ($47.8) ($40.2) ($85.0) ($32.5) $12.7 ($192.7)<br />

Contingency (15.6) (13.8) (12.0) (4.9) (1.7) (48.0)<br />

Inflation on Unawarded Construction 0.0 (0.5) (2.8) (7.8) (9.7) (20.8)<br />

Less: Chicopee Valley Aqueduct Projects 0.6 1.4 8.3 8.8 (2.5) 16.6<br />

FY09-13 Cap ($ Change) ($62.8) ($53.2) ($91.6) ($36.3) ($1.2) ($245.0)<br />

FY09-13 Cap (% Change) -25.7% -20.1% -39.8% -17.6% -0.6% -21.4%<br />

FY13 <strong>Proposed</strong> Cap Cash Flow Comparison to the FY12 Final CIP<br />

The FY13 <strong>Proposed</strong> CIP FY09-13 Cap cash flow decreased $55.9 million or 5.9% from the FY12<br />

Final budget reflecting decreases of $48.0 million, $3.4 million, and $4.6 million for projected<br />

spending, contingency, and inflation on unawarded construction, respectively offset by a slight<br />

increase for Chicopee Valley Aqueduct projects of $0.2 million.<br />

Table 3<br />

FY13 <strong>Proposed</strong><br />

FY09 FY10 FY11 FY12 FY13<br />

Total<br />

FY09-13<br />

Projected Expenditures $182.2 $211.4 $139.3 $164.3 $191.4 $888.7<br />

Contingency 0.0 0.0 0.0 7.2 9.7 16.8<br />

Inflation on Unawarded Construction 0.0 0.0 0.0 0.0 1.5 1.5<br />

Less: Chicopee Valley Aqueduct Projects (0.6) (0.5) (0.9) (0.8) (5.4) (8.2)<br />

FY13 <strong>Proposed</strong> FY09-13 Cap $181.6 $210.9 $138.4 $170.7 $197.2 $898.8<br />

FY12 Final<br />

FY09 FY10 FY11 FY12 FY13<br />

Total<br />

FY09-13<br />

Projected Expenditures $182.2 $211.4 $151.9 $165.5 $225.6 $936.7<br />

Contingency 0.0 0.0 0.0 8.4 11.9 20.3<br />

Inflation on Unawarded Construction 0.0 0.0 0.0 1.0 5.1 6.2<br />

Less: Chicopee Valley Aqueduct Projects (0.6) (0.5) (0.6) (0.4) (6.2) (8.4)<br />

FY12 Final FY09-13 Cap $181.6 $210.9 $151.3 $174.5 $236.4 $954.7<br />

FY13 <strong>Proposed</strong> -<br />

FY12 Final<br />

FY09 FY10 FY11 FY12 FY13<br />

Total<br />

FY09-13<br />

Projected Expenditures $0.0 $0.0 ($12.6) ($1.2) ($34.2) ($48.0)<br />

Contingency 0.0 0.0 0.0 (1.2) (2.2) (3.4)<br />

Inflation on Unawarded Construction 0.0 0.0 0.0 (1.0) (3.6) (4.6)<br />

Less: Chicopee Valley Aqueduct Projects 0.0 0.0 (0.3) (0.3) 0.8 0.2<br />

FY09-13 Cap ($ Change) $0.0 $0.0 ($12.9) ($3.8) ($39.2) ($55.9)<br />

FY09-13 Cap (% Change) 0.0% 0.0% -8.5% -2.2% -16.6% -5.9%<br />