Download - Andhra Pradesh Municipal Development Project Website
Download - Andhra Pradesh Municipal Development Project Website
Download - Andhra Pradesh Municipal Development Project Website
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INTRODUCTION:<br />
1. <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Municipal</strong> <strong>Development</strong> <strong>Project</strong> (APMDP) is a US$ 350 MILLION project being<br />
implemented by Government of <strong>Andhra</strong> <strong>Pradesh</strong> (GoAP) with support from World Bank . The<br />
<strong>Project</strong> is aimed at improving urban services in select ULBs mainly in water supply and<br />
sewerage sectors. The project will also support improvements in the financial, technical, and<br />
management capacities of all ULBs of <strong>Andhra</strong> <strong>Pradesh</strong> through technical assistance to sustain<br />
the infrastructures being created. This sub-project for Kakinada <strong>Municipal</strong> Corporation is one of<br />
the water supply service improvement projects taken up under <strong>Andhra</strong> <strong>Pradesh</strong> municipal<br />
<strong>Development</strong> <strong>Project</strong> (APMDP).<br />
2. This Sub-project is divided in to the following 4 Packages.<br />
Package I: Strengthening of Aratlakatta system.<br />
Salient components of this Package are:<br />
<br />
<br />
<br />
<br />
<br />
500 KL ELBR at Aratlakatta SS Tank.<br />
1000 mm Dia MS Gravity Main from ELBR to Victoria Water Works.<br />
1500 Kl CW Sump at Victoria Water Works.<br />
Replacement of Pump sets at Aratlakatta SS Tank.<br />
Construction of pump house at Aratlakatta SS Tank<br />
Package II: New system with Samalkot High Level Canal as source and Filtration Plant at<br />
Shashikantnagar.<br />
1500mm diameter MS gravity main of 8.3 Km length from Intake chamber at<br />
<br />
<br />
<br />
<br />
<br />
<br />
Samalkot to raw water sump at AU campus.<br />
1500mm diameter MS gravity main of 5.0 Km length from AU campus to Sarpavaram<br />
Junction<br />
1000mm dia MS gravity main of 2.3Km length from Sarpavaram Junction to raw<br />
water sump at Sashikanth Nagar WTP<br />
Construction of 40.00 MLD Rapid Gravity Filtration plant at Sashikanth Nagar<br />
Construction of 9 Elevated Service Reservoirs.<br />
DI Clear Water Rising Mains to various ELSRs 200 to - 800 mm dia. - 14.85 Km.<br />
MS clear Water Rising Main from Sasikanth nagar to VWW 600 mm dia.- 5.4 Km.<br />
Replacement/ Erection of new pump sets of sets - 23 No.s at various pumping<br />
<br />
stations.<br />
Construction of pump houses , Construction of Watchman Quarters and construction<br />
of Compound walls to Service Reservoirs.