ABBREVIATED RESETTLEMENT ACTION PLAN<br />
FOR COMPREHENSIVE WATER SUPPLY SERVICE IMPROVEMENTS TO<br />
KAKINADA MUNICIPAL CORPORATION<br />
ANDHRA PRADESH MUNICIPAL DEVELOPMENT PROJECT<br />
Kakinada <strong>Municipal</strong> Corporation<br />
October, 2012.
INTRODUCTION:<br />
1. <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Municipal</strong> <strong>Development</strong> <strong>Project</strong> (APMDP) is a US$ 350 MILLION project being<br />
implemented by Government of <strong>Andhra</strong> <strong>Pradesh</strong> (GoAP) with support from World Bank . The<br />
<strong>Project</strong> is aimed at improving urban services in select ULBs mainly in water supply and<br />
sewerage sectors. The project will also support improvements in the financial, technical, and<br />
management capacities of all ULBs of <strong>Andhra</strong> <strong>Pradesh</strong> through technical assistance to sustain<br />
the infrastructures being created. This sub-project for Kakinada <strong>Municipal</strong> Corporation is one of<br />
the water supply service improvement projects taken up under <strong>Andhra</strong> <strong>Pradesh</strong> municipal<br />
<strong>Development</strong> <strong>Project</strong> (APMDP).<br />
2. This Sub-project is divided in to the following 4 Packages.<br />
Package I: Strengthening of Aratlakatta system.<br />
Salient components of this Package are:<br />
<br />
<br />
<br />
<br />
<br />
500 KL ELBR at Aratlakatta SS Tank.<br />
1000 mm Dia MS Gravity Main from ELBR to Victoria Water Works.<br />
1500 Kl CW Sump at Victoria Water Works.<br />
Replacement of Pump sets at Aratlakatta SS Tank.<br />
Construction of pump house at Aratlakatta SS Tank<br />
Package II: New system with Samalkot High Level Canal as source and Filtration Plant at<br />
Shashikantnagar.<br />
1500mm diameter MS gravity main of 8.3 Km length from Intake chamber at<br />
<br />
<br />
<br />
<br />
<br />
<br />
Samalkot to raw water sump at AU campus.<br />
1500mm diameter MS gravity main of 5.0 Km length from AU campus to Sarpavaram<br />
Junction<br />
1000mm dia MS gravity main of 2.3Km length from Sarpavaram Junction to raw<br />
water sump at Sashikanth Nagar WTP<br />
Construction of 40.00 MLD Rapid Gravity Filtration plant at Sashikanth Nagar<br />
Construction of 9 Elevated Service Reservoirs.<br />
DI Clear Water Rising Mains to various ELSRs 200 to - 800 mm dia. - 14.85 Km.<br />
MS clear Water Rising Main from Sasikanth nagar to VWW 600 mm dia.- 5.4 Km.<br />
Replacement/ Erection of new pump sets of sets - 23 No.s at various pumping<br />
<br />
stations.<br />
Construction of pump houses , Construction of Watchman Quarters and construction<br />
of Compound walls to Service Reservoirs.
Package III: Construction of Summer Storage Tank at A. U. Campus.<br />
This package comprises of construction of Summer Storage tank for 45 days storage<br />
requirements (3800 ML approximately ) and other appurtenant components like raw water<br />
sumps, 500 KL ELBR, pump houses etc. The bund section of the SS Tank need to be approved by<br />
Chief Engineer, CDO, I&CAD Dept. Soil Investigations are in progress. The estimate for SS Tank<br />
can be prepared only after finalization of bund section by CE, CDO. Administrative sanction for<br />
this package will be obtained once the estimates are finalized. Land for the proposed SS tank<br />
with an area of 197 acres has been indentified at A. U. Campus.<br />
Package IV: Remodeling of Distribution System in the Town.<br />
This package comprises remodeling of Distribution System in all the zones i.e; Zone I,<br />
Zone II, Zone III, Zone IV, Zone V, Zone VI A and Zone VI B which mainly involves laying of DI<br />
And HDPE pipe lines.<br />
SCOPE OF THIS RAP:<br />
3. Out of the above four packages, Administrative Sanction was accorded only for Packages I, II<br />
and IV . Package III i.e; Construction of Summer Storage Tank involves land<br />
acquisition/alienation of 197 Acres out of which about 32 Acres is private land and the<br />
remaining is Government Land which was leased to some farmers for cultivation. The lease<br />
period has also expired. Since finalization of designs for SS Tank by CE, CDO and administrative<br />
sanction by Government after finalization of estimates will take some time, this package is<br />
not taken up at present. Hence, the scope of this RAP is limited to Packages I,II and IV only.<br />
An exclusive RAP for Package III will be prepared before issue of Bid Documents for the same.<br />
STAKEHOLDERS’ CONSULTATION:<br />
4. In order to ensure participation of citizens in project preparation, to improve public awareness<br />
of development objectives of the projects and to promote project acceptability and<br />
transparency, Stake holders meeting was held on 27-11-2010 at <strong>Municipal</strong> Council hall,<br />
Kakinada. The meeting was chaired by Joint Collector& Special Officer. Relevant information<br />
was shared with the stakeholders in order to assess their perceptions about the project and also<br />
to seek their suggestions. Most of the suggestions were to supply clean drinking water. One
suggestion has been received to replace the damaged distribution lines which has been taken<br />
care of in DPR. The details of the meeting are provided in Annexure –II.<br />
ASSESSMENT OF ADVERSE SOCIAL IMPACTS<br />
5. In order to ensure that the project do not harm the livelihood of the people due to the proposed<br />
project interventions, an assessment of adverse impacts was carried out with an objective of proposing<br />
suitable mitigation measures where such impacts envisaged. While formulating the subproject, various<br />
efforts have been made to minimize resettlement. During planning and designing, attempt has been<br />
made to restrict the construction works within the ULB lands and RoW of Government/ ULB land.<br />
Despite these efforts, minor impact on some roadside vendors/ kiosks and two CPRs(compound walls<br />
of temples) could not be avoided.<br />
The impacts are ascertained for each component of the project based on the proposed site of<br />
construction /alignment. Necessity of land acquisition, Impacts on public/ private properties, necessity for<br />
temporary relocation of roadside kiosks and disturbance to business have been ascertained for each<br />
component. The details of proposed investment components and the potential impacts in those<br />
components are described below.<br />
The purpose of this Abbreviated Resettlement Action Plan (ARAP) is to propose the mitigation measures<br />
to those few shopkeepers affected due to the project activities in order to support them during the<br />
transition period. These impacts are of minor in nature and only impact for few days during laying of<br />
distribution lines (which will be done in stretches). All affected people may continue to do their business<br />
activities after completion of pipeline work at their current place of vending/business subject to the local<br />
laws.<br />
Component Wise Impacts:<br />
SNo. Component IR Impact<br />
Land<br />
Requirement<br />
Land<br />
Ownership<br />
Remarks<br />
Package - I<br />
1 Construction of Water<br />
Bound Macadam (WBM)<br />
service road from<br />
Aratlakatta SS Tank to<br />
Kovada railway Crossing<br />
for a length of 3.65 Km.<br />
No Impact 7 Acres of<br />
land required<br />
for this road<br />
The land<br />
belongs to<br />
ULB and is<br />
vacant.<br />
No LA<br />
required.<br />
2 Gravity main from Aratla<br />
katta ss tank to victoria<br />
ww.<br />
Package - II<br />
Squatters-2<br />
Encroachers-7<br />
------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.
3 Gravity main from AU<br />
Campus to Srpavaram Jn.<br />
4 Raw water main from<br />
Sarpavaram Jn to<br />
Sashikanthnagar<br />
5 Pumping main from<br />
sashikanth nagar to<br />
Victoria ww<br />
6 CW PM from Victoria ww<br />
to jagannaikpur<br />
7 CW PM from<br />
Sashikantnagar to<br />
Gaigolpadu<br />
Kiosks/Squatters-<br />
6<br />
Encroachers-1<br />
CPR -1 ( Temple<br />
Flatform -6 sq.m)<br />
Squatters-4<br />
Encroachers-1<br />
Encroacher-1<br />
Squatters -4<br />
CPR -1 Temple<br />
Flatform(3x2m)<br />
------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.<br />
------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.<br />
------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.<br />
Squatters -3 ------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.<br />
Squatters- 8 ------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.<br />
8 40 mld Water Treatment<br />
Plant at Sashikant Nagar.<br />
9 ELSRs.<br />
1000 KL and 1600 KL<br />
ELSRs at Jagannaikpur.<br />
1000 Kl ELSR at<br />
Budampeta<br />
No impact 8556 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant.<br />
No impact 1190 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No impact 503 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No LA is<br />
required.<br />
No LA is<br />
required<br />
No LA is<br />
required<br />
1600 KL ELSR at VWW No impact 841 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No LA is<br />
required
1000 KL ELSRs (2Nos) at<br />
Dumulpeta.<br />
1600 KL ELSR at<br />
Bhaskaranagar<br />
1600 KL ELSR at<br />
Gaigolupadu.<br />
No impact 1184 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No impact 977 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No impact 712 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No LA is<br />
required<br />
No LA is<br />
required<br />
No LA is<br />
required<br />
Total land Requirement = 3.45 Acres.<br />
(All the proposed sites belong to Kakinada <strong>Municipal</strong> Corporation and hence no land<br />
acquisition is required.)<br />
6. In order to assess the impacts of the sub- project, a social impact assessment was carried out by the<br />
DPR consultants which include the census and socio-economic survey among those potentially affected<br />
population. The assessment indicated that some vendors/Kiosks will be affected in the form of temporary<br />
shifting during laying of pipe lines for few days. They need to shift their kiosks temporarily during laying of<br />
distribution lines to a nearby place. They may continue their business after completion of pipeline work at<br />
the original place of business. The list of affected vendors is provided as Annexure -I.<br />
SOCIO-ECONOMIC PROFILE OF THE ROADSIDE VENDORS /KIOSKS:<br />
7. The census survey of those road side vendors (Kiosks)/CPRs going to be affected while laying the<br />
distribution pipelines was carried out in December, 2011, by consultants (M/s Voyants Solutions). The<br />
details of the census survey are provided in Annexure –I.<br />
POSITIVE BENEFITS DUE TO THE SUB-PROJECT:<br />
8. Not withstanding of the few above mentioned advese imapcts,th prosoed proejct will have<br />
positive impacts in the form of :<br />
<br />
<br />
<br />
reduction in water shortage<br />
increased access to potable water<br />
reduction in waterborne diseases
time saving for the residents<br />
job opportunity in the <strong>Project</strong><br />
scope for improving quality of life<br />
exposure to awareness programmes and hence updating knowledge.<br />
POLICY LEGAL AND ADMINISTRATIVE FRAMEWORK:<br />
9. <strong>Project</strong> will be governed by,<br />
Social Enviroemntl Assessment Mangment Fraemworek for Urabn Reforms and Munciplal<br />
Services in AP.<br />
R&R Policy of <strong>Andhra</strong> <strong>Pradesh</strong> (Irrigation Sector), 2005 ( applicable for all projects in the state)<br />
National R&R Policy 2007<br />
World Bank Operational Policy 4.12 on Involuntary Resettlement<br />
The applicable provisions of the above policies will be proposed for mitigating the impacts depending<br />
upon on the type of impacts triggered in this sub-project.<br />
ENTITLEMENTS<br />
10. The impacts of the sub-project are limited to roadside vendors on RoW. The assistance for these<br />
roadside vendors is as follows.<br />
Category<br />
Kiosk/ Roadside Vendor on RoW.<br />
Temporary Disturbance to<br />
Business/ Restriction of access<br />
for Shops.<br />
CPR (Compound wall )<br />
Assistance<br />
.<br />
Shifting Allowance of<br />
Rs.2000 and Transitional<br />
Allowance of Rs.3000 # .<br />
Disturbance allowance of<br />
Rs 3000 # .<br />
Estimated value of the<br />
affected portion.<br />
No. of affected Units.<br />
33<br />
4<br />
2<br />
# These amounts shall be adjusted @ 10% at the beginning of each financial year.<br />
TENTATIVE BUDGET ESTIMATE FOR RAP:<br />
11. The Budget is indicative of outlays for different expenditure categories. The costs may be<br />
updated due to change in the project designs/alignment and additional impacts..
Assistance Type Entitlement Number (as per the<br />
previous survey- to be<br />
updated by S&E<br />
Officer/consultant)<br />
Assistance to<br />
Vendors/Kiosks on<br />
RoW..<br />
Temporary Disturbance<br />
to Business/ Restriction<br />
of access for Shops<br />
Amount (in Rs.)<br />
Shifting Allowance of<br />
Rs.2000 and Transitional<br />
Allowance of Rs.3000<br />
33 1,65,000.00<br />
Disturbance allowance of<br />
5 15,000.00<br />
Rs 3000 .<br />
CPR (Compound wall ) Rs.2000 per sq.m. 2(6sq.m.each) 24,000.00<br />
Contingencies 46,,000.00<br />
TOTAL 2,50,000.00<br />
IMPLEMENTATION OF RAP:<br />
Payment of Assistance:<br />
12. List of the affected Roadside Vendors/ Kiosks will be prepared jointly by S&E Officer of the ULB<br />
(appointed vide Roc No.5256/10/E3. Dt.07.06.2010 of the <strong>Municipal</strong> Commissioner, Kakinada) and the<br />
consultant which will be endorsed by the <strong>Municipal</strong> Commissioner before award of contract. A video of<br />
the affected shops and proposed sites for ELSRs and WTP will be taken for cut-off data.<br />
<br />
<br />
Based on the list, the Budget as per the above entitlements will be approved by the <strong>Municipal</strong><br />
Commissioner.<br />
The assistance will be paid through cheques to the eligible people before execution of work is<br />
taken up. The <strong>Municipal</strong> Commissioner will certify to this effect.<br />
ADDITIONAL IMPACTS DURING THE IMPLEMENTATION OF SUB-PROJECT:<br />
13. During the implementation, if any additional impacts are encountered in addition to those<br />
described in this RAP, they will be promptly addressed through additional measures in line with the policy<br />
provisions. The contractor will communicate promptly to bring to the notice of S&E officer about any<br />
additional impacts that he may encounter during the execution of works and these will be mitigated<br />
promptly. The S&E Officer of the ULB is responsible for initiating the process for addressing the additional<br />
impacts and the supplementary plans will be processed in a similar manner by which this RAP is<br />
prepared and approved. The S&E officer will provide a confirmation to MSU , APMDP once in quarter<br />
during the construction period about the details of new impacts encounter and measures taken to deal<br />
with those impacts or confirm that no impacts were encountered.
14. SYNCHRONIZATION OF R&R AND CONSTRUCTION SCHEDULE:<br />
Sl.No. Construction Schedule R&R Activities Tentative Time Table<br />
1 Issuance of Bids for<br />
the Sub-project<br />
Approval<br />
Disclosure of RAP<br />
and<br />
15 th October,2012.<br />
2 Award of / signing the<br />
contract<br />
Setting up of Grievance<br />
Redressal Mechanism.<br />
Joint Enumeration of<br />
affected kiosks and<br />
CPRs on RoW with<br />
video recording.<br />
15th December,2012.<br />
3 Execution of pipe lines. Payment of assistance<br />
to the affected people<br />
and Certification on<br />
payments<br />
One month before<br />
execution of work in<br />
respective lines.<br />
GRIEVANCE REDRESSAL MECHANISM:<br />
15. The grievances can be registered at the complaint cell established at the ULB. The Complaint<br />
Cell would forward the grievance to the S&E officer who will forward the grievance to the Revenue<br />
Officer and the NGO/ Community representative in the ESMC( Environmental and Social Management<br />
Committee)for redressing. The Complaint Cell will also act as a Public Information Centre, where the<br />
grievances of the community will be registered and other information with regard to the project, the<br />
sub-projects, social and environmental safeguards will be provided. The grievances can pertain to any<br />
social and/or environmental issues triggered by sub-projects under the APMD <strong>Project</strong>. A District Urban<br />
Grievance Redress Body will be established for redressing the grievances that couldnot be solved by<br />
Grievance Redress Officerat ULB level This body will consist of 4 to 5 eminent citizens in the District and<br />
are from diverse backgrounds such as, education, health and sanitation, urban infrastructure, civic<br />
affairs, etc. In an advisory capacity, it will facilitate and suggest suitable action to redress the grievances
of the community/public. At the State level a State Urban Grievance Redressal Body will be established<br />
along similar lines. If the grivance redress officer cannot redress the grievance within a specified time<br />
period, the grievance would be forwarded to the ESMC and further to the District Urban Grievance<br />
Redressal Body constituted at the District level. The grievances that cannot be redressed at the District<br />
level would be referred to the State Urban Grievance Redressal Body. Each of these authorities can be<br />
approached directly for grievance redress by the aggrieved person/party.<br />
PUBLIC DISCLOSURE:<br />
16. The RAP in English and Telugu will be placed at public places and the web sites of Munciplaity<br />
and CDMA for the benefit of all concerned . The public disclosure places, at the minimum, include the<br />
following:<br />
<br />
<br />
<br />
Offices and libraries of the project area (Commissioner office and <strong>Municipal</strong> libraries)<br />
District Collectorate<br />
Departmental websites.<br />
MONITORING AND REPORTING<br />
17. A report on payment of assistance will be sent to MSU- APMDP once the payments are<br />
completed along with the certification of payments. . In addition, quarterly Confirmation Note will be<br />
sent indicating the details of additional impacts or otherwise, throughout the construction period
ANNEXURE - I<br />
List of affected Kiosks Owners.<br />
S.No<br />
Name<br />
Categor<br />
y<br />
Business Stretch Location Impact Caste<br />
Wheth<br />
er BPL<br />
1<br />
Sekkatla Narayna<br />
Rao<br />
Kiosk<br />
Pan shop<br />
Opp.Tata<br />
motors<br />
Business<br />
B.C.<br />
B.P.L.<br />
2 Ellamili Simadhri Kiosk<br />
Sugar<br />
cane<br />
Penumarthi<br />
Business<br />
B.C.<br />
B.P.L.<br />
3 Shetti Babu Kiosk<br />
Mutton<br />
shop<br />
Penumarthi<br />
Business<br />
B.C.<br />
B.P.L.<br />
4 Reyadu Appa rao Squatter hotel Penumarthi Business B.C. B.P.L.<br />
5<br />
Kaisala<br />
Nageswara rao<br />
Kiosk<br />
6 Appala Raju Squatter<br />
Cycle<br />
shop<br />
Cycle<br />
shop<br />
AU Campus<br />
to<br />
Sarpavaram<br />
Jn<br />
Rameneya<br />
pet<br />
Business<br />
Business<br />
B.C.<br />
B.C.<br />
B.P.L.<br />
B.P.L.<br />
7<br />
L.Ventaramma<br />
Rao (DurgaDevi<br />
amman)<br />
CPR<br />
Pvt<br />
temple<br />
Iswarya<br />
Ambika<br />
Platform<br />
6mt*1mt<br />
Iron Grill<br />
---- NO<br />
B.C.<br />
NO<br />
8 Y.Srinivasan<br />
Encroac<br />
her<br />
Resident<br />
5mt*1mt<br />
9<br />
Kambala<br />
Bantiyya<br />
Squatter<br />
Pan shop<br />
Rameneya<br />
pet<br />
Business<br />
B.C.<br />
B.P.L.<br />
10 Not known Kiosk<br />
11 Sharavam Kiosk<br />
12 Tatayulu Kiosk<br />
Mutton<br />
shop<br />
Sweet<br />
shop<br />
cycle<br />
shop<br />
Sarpavaram<br />
Jn to<br />
Sasikanth<br />
Nagar<br />
Gangaraj<br />
nagar<br />
Rameneya<br />
pet<br />
Iswarya<br />
Business<br />
Business<br />
Business<br />
B.C.<br />
B.C.<br />
B.C.<br />
B.P.L.<br />
B.P.L.<br />
B.P.L.<br />
13 TSR Prasad<br />
Encroac<br />
her<br />
Hardware<br />
Sarpavaram<br />
Jn<br />
platform<br />
B.C.<br />
NO
14<br />
Ahmaad Ali<br />
Shaw(Alisha Auto<br />
works)<br />
Encroac<br />
her<br />
Auto<br />
works<br />
Ramarao pet<br />
Thatched<br />
roof<br />
B.C.<br />
B.P.L.<br />
15 Chetli Krishna Kiosk<br />
cycle<br />
shop<br />
Ramarao pet<br />
business<br />
B.C.<br />
B.P.L.<br />
16<br />
Srinivas tiffin/pan<br />
shop<br />
Kiosk<br />
tiffin<br />
centre<br />
Ramarao pet<br />
Business<br />
B.C.<br />
B.P.L.<br />
17<br />
Vasmnachetti<br />
Sathibabu<br />
18 Pithani Gowni Kiosk<br />
Kiosk Pan shop VWW to<br />
Sasikanth<br />
Kondiyapalu Structure B.C.<br />
Sugar nagar<br />
cane<br />
Sarpavaram Business B.C.<br />
Platform<br />
B.P.L.<br />
B.P.L.<br />
NO<br />
19<br />
Venkata Rao<br />
(Kangadurga<br />
temple)<br />
CPR<br />
Pvt.templ<br />
e<br />
Sarpavaram<br />
3x2 m<br />
------<br />
20 Easiala Raj rao Squatter Eatery<br />
Sarpavaram<br />
Jn<br />
Business<br />
B.C.<br />
B.P.L.<br />
21 Raidu Sathibabu Squatter tea shop<br />
Sarpavaram<br />
Jn<br />
Business<br />
B.C.<br />
B.P.L.<br />
22<br />
Janappa Reddi<br />
Eswara rao<br />
Squatter<br />
fruit<br />
vendor<br />
Sarpavaram<br />
Jn<br />
Business<br />
B.C.<br />
B.P.L.<br />
23<br />
24<br />
Eaisala<br />
Govindarajulu<br />
Udhayagiri<br />
Moahan rao<br />
Squatter<br />
Squatter<br />
Eatery<br />
Eatery<br />
Sasikanth<br />
Nagar to<br />
Goigalupatu<br />
Sarpavaram<br />
Jn<br />
Sarpavaram<br />
Jn<br />
Business<br />
Business<br />
B.C.<br />
B.C.<br />
B.P.L.<br />
B.P.L.<br />
25<br />
Bethani<br />
Nagaratham<br />
Squatter<br />
Eatery<br />
Sarpavaram<br />
Jn<br />
Business<br />
B.C.<br />
B.P.L.<br />
26 Datta Pothirajulu Squatter<br />
Iron<br />
works<br />
Sarpavaram<br />
Jn<br />
Business<br />
B.C.<br />
B.P.L.<br />
27 Maltadu Baburai Squatter<br />
Cycle<br />
shop<br />
GoigalupaduJ<br />
n<br />
Business<br />
B.C.<br />
B.P.L.
28<br />
Vanragi<br />
Sathyanarayan<br />
Squatter<br />
Pan<br />
Artlakatta to<br />
VWW<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
29<br />
Jainu Narasimha<br />
murthi<br />
Squatter<br />
Residence<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
30<br />
Anasuri<br />
Subbalaxmi<br />
Encroch<br />
er<br />
Veg<br />
Indrapalam<br />
Market<br />
Structure<br />
B.C.<br />
B.P.L.<br />
31<br />
Yelamangali<br />
Jairaju<br />
Encroch<br />
er<br />
hotel<br />
Indrapalam<br />
Market<br />
Thatched<br />
roof<br />
B.C.<br />
B.P.L.<br />
32<br />
Vakkapalli<br />
Sathyanarayan<br />
Encroac<br />
her<br />
Pan<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
33 Rayudu Raman<br />
Encroac<br />
her<br />
cycle<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
34<br />
Qurranna Jogga<br />
rao<br />
Encroac<br />
her<br />
Dhobi<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
35<br />
Vijaykumar<br />
Rokkali<br />
Encroac<br />
her<br />
hotel<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
36<br />
Panchibelu Subba<br />
rao<br />
Encroac<br />
her<br />
pan<br />
Indrapalam<br />
Market<br />
Business<br />
B.C.<br />
B.P.L.<br />
38 Nageswar rao kiosk<br />
STD<br />
booth<br />
VWW to<br />
Jagnaikanpu<br />
r<br />
PR College<br />
Rd<br />
Business<br />
B.C.<br />
B.P.L.<br />
39<br />
Morra<br />
Ranganathan<br />
kiosk<br />
Cycle<br />
shop<br />
PR College<br />
Rd<br />
Business<br />
B.C.<br />
B.P.L.<br />
40<br />
Koppala<br />
Rajeswari<br />
kiosk<br />
Pan<br />
PR College<br />
Rd<br />
Business<br />
B.C.<br />
B.P.L.
ANNEXURE – II<br />
Details of the Stakeholders Meeting held on 27-11-2010.