ABBREVIATED RESETTLEMENT ACTION PLAN<br />

FOR COMPREHENSIVE WATER SUPPLY SERVICE IMPROVEMENTS TO<br />

KAKINADA MUNICIPAL CORPORATION<br />

ANDHRA PRADESH MUNICIPAL DEVELOPMENT PROJECT<br />

Kakinada <strong>Municipal</strong> Corporation<br />

October, 2012.


INTRODUCTION:<br />

1. <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Municipal</strong> <strong>Development</strong> <strong>Project</strong> (APMDP) is a US$ 350 MILLION project being<br />

implemented by Government of <strong>Andhra</strong> <strong>Pradesh</strong> (GoAP) with support from World Bank . The<br />

<strong>Project</strong> is aimed at improving urban services in select ULBs mainly in water supply and<br />

sewerage sectors. The project will also support improvements in the financial, technical, and<br />

management capacities of all ULBs of <strong>Andhra</strong> <strong>Pradesh</strong> through technical assistance to sustain<br />

the infrastructures being created. This sub-project for Kakinada <strong>Municipal</strong> Corporation is one of<br />

the water supply service improvement projects taken up under <strong>Andhra</strong> <strong>Pradesh</strong> municipal<br />

<strong>Development</strong> <strong>Project</strong> (APMDP).<br />

2. This Sub-project is divided in to the following 4 Packages.<br />

Package I: Strengthening of Aratlakatta system.<br />

Salient components of this Package are:<br />

<br />

<br />

<br />

<br />

<br />

500 KL ELBR at Aratlakatta SS Tank.<br />

1000 mm Dia MS Gravity Main from ELBR to Victoria Water Works.<br />

1500 Kl CW Sump at Victoria Water Works.<br />

Replacement of Pump sets at Aratlakatta SS Tank.<br />

Construction of pump house at Aratlakatta SS Tank<br />

Package II: New system with Samalkot High Level Canal as source and Filtration Plant at<br />

Shashikantnagar.<br />

1500mm diameter MS gravity main of 8.3 Km length from Intake chamber at<br />

<br />

<br />

<br />

<br />

<br />

<br />

Samalkot to raw water sump at AU campus.<br />

1500mm diameter MS gravity main of 5.0 Km length from AU campus to Sarpavaram<br />

Junction<br />

1000mm dia MS gravity main of 2.3Km length from Sarpavaram Junction to raw<br />

water sump at Sashikanth Nagar WTP<br />

Construction of 40.00 MLD Rapid Gravity Filtration plant at Sashikanth Nagar<br />

Construction of 9 Elevated Service Reservoirs.<br />

DI Clear Water Rising Mains to various ELSRs 200 to - 800 mm dia. - 14.85 Km.<br />

MS clear Water Rising Main from Sasikanth nagar to VWW 600 mm dia.- 5.4 Km.<br />

Replacement/ Erection of new pump sets of sets - 23 No.s at various pumping<br />

<br />

stations.<br />

Construction of pump houses , Construction of Watchman Quarters and construction<br />

of Compound walls to Service Reservoirs.


Package III: Construction of Summer Storage Tank at A. U. Campus.<br />

This package comprises of construction of Summer Storage tank for 45 days storage<br />

requirements (3800 ML approximately ) and other appurtenant components like raw water<br />

sumps, 500 KL ELBR, pump houses etc. The bund section of the SS Tank need to be approved by<br />

Chief Engineer, CDO, I&CAD Dept. Soil Investigations are in progress. The estimate for SS Tank<br />

can be prepared only after finalization of bund section by CE, CDO. Administrative sanction for<br />

this package will be obtained once the estimates are finalized. Land for the proposed SS tank<br />

with an area of 197 acres has been indentified at A. U. Campus.<br />

Package IV: Remodeling of Distribution System in the Town.<br />

This package comprises remodeling of Distribution System in all the zones i.e; Zone I,<br />

Zone II, Zone III, Zone IV, Zone V, Zone VI A and Zone VI B which mainly involves laying of DI<br />

And HDPE pipe lines.<br />

SCOPE OF THIS RAP:<br />

3. Out of the above four packages, Administrative Sanction was accorded only for Packages I, II<br />

and IV . Package III i.e; Construction of Summer Storage Tank involves land<br />

acquisition/alienation of 197 Acres out of which about 32 Acres is private land and the<br />

remaining is Government Land which was leased to some farmers for cultivation. The lease<br />

period has also expired. Since finalization of designs for SS Tank by CE, CDO and administrative<br />

sanction by Government after finalization of estimates will take some time, this package is<br />

not taken up at present. Hence, the scope of this RAP is limited to Packages I,II and IV only.<br />

An exclusive RAP for Package III will be prepared before issue of Bid Documents for the same.<br />

STAKEHOLDERS’ CONSULTATION:<br />

4. In order to ensure participation of citizens in project preparation, to improve public awareness<br />

of development objectives of the projects and to promote project acceptability and<br />

transparency, Stake holders meeting was held on 27-11-2010 at <strong>Municipal</strong> Council hall,<br />

Kakinada. The meeting was chaired by Joint Collector& Special Officer. Relevant information<br />

was shared with the stakeholders in order to assess their perceptions about the project and also<br />

to seek their suggestions. Most of the suggestions were to supply clean drinking water. One


suggestion has been received to replace the damaged distribution lines which has been taken<br />

care of in DPR. The details of the meeting are provided in Annexure –II.<br />

ASSESSMENT OF ADVERSE SOCIAL IMPACTS<br />

5. In order to ensure that the project do not harm the livelihood of the people due to the proposed<br />

project interventions, an assessment of adverse impacts was carried out with an objective of proposing<br />

suitable mitigation measures where such impacts envisaged. While formulating the subproject, various<br />

efforts have been made to minimize resettlement. During planning and designing, attempt has been<br />

made to restrict the construction works within the ULB lands and RoW of Government/ ULB land.<br />

Despite these efforts, minor impact on some roadside vendors/ kiosks and two CPRs(compound walls<br />

of temples) could not be avoided.<br />

The impacts are ascertained for each component of the project based on the proposed site of<br />

construction /alignment. Necessity of land acquisition, Impacts on public/ private properties, necessity for<br />

temporary relocation of roadside kiosks and disturbance to business have been ascertained for each<br />

component. The details of proposed investment components and the potential impacts in those<br />

components are described below.<br />

The purpose of this Abbreviated Resettlement Action Plan (ARAP) is to propose the mitigation measures<br />

to those few shopkeepers affected due to the project activities in order to support them during the<br />

transition period. These impacts are of minor in nature and only impact for few days during laying of<br />

distribution lines (which will be done in stretches). All affected people may continue to do their business<br />

activities after completion of pipeline work at their current place of vending/business subject to the local<br />

laws.<br />

Component Wise Impacts:<br />

SNo. Component IR Impact<br />

Land<br />

Requirement<br />

Land<br />

Ownership<br />

Remarks<br />

Package - I<br />

1 Construction of Water<br />

Bound Macadam (WBM)<br />

service road from<br />

Aratlakatta SS Tank to<br />

Kovada railway Crossing<br />

for a length of 3.65 Km.<br />

No Impact 7 Acres of<br />

land required<br />

for this road<br />

The land<br />

belongs to<br />

ULB and is<br />

vacant.<br />

No LA<br />

required.<br />

2 Gravity main from Aratla<br />

katta ss tank to victoria<br />

ww.<br />

Package - II<br />

Squatters-2<br />

Encroachers-7<br />

------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.


3 Gravity main from AU<br />

Campus to Srpavaram Jn.<br />

4 Raw water main from<br />

Sarpavaram Jn to<br />

Sashikanthnagar<br />

5 Pumping main from<br />

sashikanth nagar to<br />

Victoria ww<br />

6 CW PM from Victoria ww<br />

to jagannaikpur<br />

7 CW PM from<br />

Sashikantnagar to<br />

Gaigolpadu<br />

Kiosks/Squatters-<br />

6<br />

Encroachers-1<br />

CPR -1 ( Temple<br />

Flatform -6 sq.m)<br />

Squatters-4<br />

Encroachers-1<br />

Encroacher-1<br />

Squatters -4<br />

CPR -1 Temple<br />

Flatform(3x2m)<br />

------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.<br />

------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.<br />

------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.<br />

Squatters -3 ------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.<br />

Squatters- 8 ------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.<br />

8 40 mld Water Treatment<br />

Plant at Sashikant Nagar.<br />

9 ELSRs.<br />

1000 KL and 1600 KL<br />

ELSRs at Jagannaikpur.<br />

1000 Kl ELSR at<br />

Budampeta<br />

No impact 8556 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant.<br />

No impact 1190 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No impact 503 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No LA is<br />

required.<br />

No LA is<br />

required<br />

No LA is<br />

required<br />

1600 KL ELSR at VWW No impact 841 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No LA is<br />

required


1000 KL ELSRs (2Nos) at<br />

Dumulpeta.<br />

1600 KL ELSR at<br />

Bhaskaranagar<br />

1600 KL ELSR at<br />

Gaigolupadu.<br />

No impact 1184 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No impact 977 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No impact 712 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No LA is<br />

required<br />

No LA is<br />

required<br />

No LA is<br />

required<br />

Total land Requirement = 3.45 Acres.<br />

(All the proposed sites belong to Kakinada <strong>Municipal</strong> Corporation and hence no land<br />

acquisition is required.)<br />

6. In order to assess the impacts of the sub- project, a social impact assessment was carried out by the<br />

DPR consultants which include the census and socio-economic survey among those potentially affected<br />

population. The assessment indicated that some vendors/Kiosks will be affected in the form of temporary<br />

shifting during laying of pipe lines for few days. They need to shift their kiosks temporarily during laying of<br />

distribution lines to a nearby place. They may continue their business after completion of pipeline work at<br />

the original place of business. The list of affected vendors is provided as Annexure -I.<br />

SOCIO-ECONOMIC PROFILE OF THE ROADSIDE VENDORS /KIOSKS:<br />

7. The census survey of those road side vendors (Kiosks)/CPRs going to be affected while laying the<br />

distribution pipelines was carried out in December, 2011, by consultants (M/s Voyants Solutions). The<br />

details of the census survey are provided in Annexure –I.<br />

POSITIVE BENEFITS DUE TO THE SUB-PROJECT:<br />

8. Not withstanding of the few above mentioned advese imapcts,th prosoed proejct will have<br />

positive impacts in the form of :<br />

<br />

<br />

<br />

reduction in water shortage<br />

increased access to potable water<br />

reduction in waterborne diseases


time saving for the residents<br />

job opportunity in the <strong>Project</strong><br />

scope for improving quality of life<br />

exposure to awareness programmes and hence updating knowledge.<br />

POLICY LEGAL AND ADMINISTRATIVE FRAMEWORK:<br />

9. <strong>Project</strong> will be governed by,<br />

Social Enviroemntl Assessment Mangment Fraemworek for Urabn Reforms and Munciplal<br />

Services in AP.<br />

R&R Policy of <strong>Andhra</strong> <strong>Pradesh</strong> (Irrigation Sector), 2005 ( applicable for all projects in the state)<br />

National R&R Policy 2007<br />

World Bank Operational Policy 4.12 on Involuntary Resettlement<br />

The applicable provisions of the above policies will be proposed for mitigating the impacts depending<br />

upon on the type of impacts triggered in this sub-project.<br />

ENTITLEMENTS<br />

10. The impacts of the sub-project are limited to roadside vendors on RoW. The assistance for these<br />

roadside vendors is as follows.<br />

Category<br />

Kiosk/ Roadside Vendor on RoW.<br />

Temporary Disturbance to<br />

Business/ Restriction of access<br />

for Shops.<br />

CPR (Compound wall )<br />

Assistance<br />

.<br />

Shifting Allowance of<br />

Rs.2000 and Transitional<br />

Allowance of Rs.3000 # .<br />

Disturbance allowance of<br />

Rs 3000 # .<br />

Estimated value of the<br />

affected portion.<br />

No. of affected Units.<br />

33<br />

4<br />

2<br />

# These amounts shall be adjusted @ 10% at the beginning of each financial year.<br />

TENTATIVE BUDGET ESTIMATE FOR RAP:<br />

11. The Budget is indicative of outlays for different expenditure categories. The costs may be<br />

updated due to change in the project designs/alignment and additional impacts..


Assistance Type Entitlement Number (as per the<br />

previous survey- to be<br />

updated by S&E<br />

Officer/consultant)<br />

Assistance to<br />

Vendors/Kiosks on<br />

RoW..<br />

Temporary Disturbance<br />

to Business/ Restriction<br />

of access for Shops<br />

Amount (in Rs.)<br />

Shifting Allowance of<br />

Rs.2000 and Transitional<br />

Allowance of Rs.3000<br />

33 1,65,000.00<br />

Disturbance allowance of<br />

5 15,000.00<br />

Rs 3000 .<br />

CPR (Compound wall ) Rs.2000 per sq.m. 2(6sq.m.each) 24,000.00<br />

Contingencies 46,,000.00<br />

TOTAL 2,50,000.00<br />

IMPLEMENTATION OF RAP:<br />

Payment of Assistance:<br />

12. List of the affected Roadside Vendors/ Kiosks will be prepared jointly by S&E Officer of the ULB<br />

(appointed vide Roc No.5256/10/E3. Dt.07.06.2010 of the <strong>Municipal</strong> Commissioner, Kakinada) and the<br />

consultant which will be endorsed by the <strong>Municipal</strong> Commissioner before award of contract. A video of<br />

the affected shops and proposed sites for ELSRs and WTP will be taken for cut-off data.<br />

<br />

<br />

Based on the list, the Budget as per the above entitlements will be approved by the <strong>Municipal</strong><br />

Commissioner.<br />

The assistance will be paid through cheques to the eligible people before execution of work is<br />

taken up. The <strong>Municipal</strong> Commissioner will certify to this effect.<br />

ADDITIONAL IMPACTS DURING THE IMPLEMENTATION OF SUB-PROJECT:<br />

13. During the implementation, if any additional impacts are encountered in addition to those<br />

described in this RAP, they will be promptly addressed through additional measures in line with the policy<br />

provisions. The contractor will communicate promptly to bring to the notice of S&E officer about any<br />

additional impacts that he may encounter during the execution of works and these will be mitigated<br />

promptly. The S&E Officer of the ULB is responsible for initiating the process for addressing the additional<br />

impacts and the supplementary plans will be processed in a similar manner by which this RAP is<br />

prepared and approved. The S&E officer will provide a confirmation to MSU , APMDP once in quarter<br />

during the construction period about the details of new impacts encounter and measures taken to deal<br />

with those impacts or confirm that no impacts were encountered.


14. SYNCHRONIZATION OF R&R AND CONSTRUCTION SCHEDULE:<br />

Sl.No. Construction Schedule R&R Activities Tentative Time Table<br />

1 Issuance of Bids for<br />

the Sub-project<br />

Approval<br />

Disclosure of RAP<br />

and<br />

15 th October,2012.<br />

2 Award of / signing the<br />

contract<br />

Setting up of Grievance<br />

Redressal Mechanism.<br />

Joint Enumeration of<br />

affected kiosks and<br />

CPRs on RoW with<br />

video recording.<br />

15th December,2012.<br />

3 Execution of pipe lines. Payment of assistance<br />

to the affected people<br />

and Certification on<br />

payments<br />

One month before<br />

execution of work in<br />

respective lines.<br />

GRIEVANCE REDRESSAL MECHANISM:<br />

15. The grievances can be registered at the complaint cell established at the ULB. The Complaint<br />

Cell would forward the grievance to the S&E officer who will forward the grievance to the Revenue<br />

Officer and the NGO/ Community representative in the ESMC( Environmental and Social Management<br />

Committee)for redressing. The Complaint Cell will also act as a Public Information Centre, where the<br />

grievances of the community will be registered and other information with regard to the project, the<br />

sub-projects, social and environmental safeguards will be provided. The grievances can pertain to any<br />

social and/or environmental issues triggered by sub-projects under the APMD <strong>Project</strong>. A District Urban<br />

Grievance Redress Body will be established for redressing the grievances that couldnot be solved by<br />

Grievance Redress Officerat ULB level This body will consist of 4 to 5 eminent citizens in the District and<br />

are from diverse backgrounds such as, education, health and sanitation, urban infrastructure, civic<br />

affairs, etc. In an advisory capacity, it will facilitate and suggest suitable action to redress the grievances


of the community/public. At the State level a State Urban Grievance Redressal Body will be established<br />

along similar lines. If the grivance redress officer cannot redress the grievance within a specified time<br />

period, the grievance would be forwarded to the ESMC and further to the District Urban Grievance<br />

Redressal Body constituted at the District level. The grievances that cannot be redressed at the District<br />

level would be referred to the State Urban Grievance Redressal Body. Each of these authorities can be<br />

approached directly for grievance redress by the aggrieved person/party.<br />

PUBLIC DISCLOSURE:<br />

16. The RAP in English and Telugu will be placed at public places and the web sites of Munciplaity<br />

and CDMA for the benefit of all concerned . The public disclosure places, at the minimum, include the<br />

following:<br />

<br />

<br />

<br />

Offices and libraries of the project area (Commissioner office and <strong>Municipal</strong> libraries)<br />

District Collectorate<br />

Departmental websites.<br />

MONITORING AND REPORTING<br />

17. A report on payment of assistance will be sent to MSU- APMDP once the payments are<br />

completed along with the certification of payments. . In addition, quarterly Confirmation Note will be<br />

sent indicating the details of additional impacts or otherwise, throughout the construction period


ANNEXURE - I<br />

List of affected Kiosks Owners.<br />

S.No<br />

Name<br />

Categor<br />

y<br />

Business Stretch Location Impact Caste<br />

Wheth<br />

er BPL<br />

1<br />

Sekkatla Narayna<br />

Rao<br />

Kiosk<br />

Pan shop<br />

Opp.Tata<br />

motors<br />

Business<br />

B.C.<br />

B.P.L.<br />

2 Ellamili Simadhri Kiosk<br />

Sugar<br />

cane<br />

Penumarthi<br />

Business<br />

B.C.<br />

B.P.L.<br />

3 Shetti Babu Kiosk<br />

Mutton<br />

shop<br />

Penumarthi<br />

Business<br />

B.C.<br />

B.P.L.<br />

4 Reyadu Appa rao Squatter hotel Penumarthi Business B.C. B.P.L.<br />

5<br />

Kaisala<br />

Nageswara rao<br />

Kiosk<br />

6 Appala Raju Squatter<br />

Cycle<br />

shop<br />

Cycle<br />

shop<br />

AU Campus<br />

to<br />

Sarpavaram<br />

Jn<br />

Rameneya<br />

pet<br />

Business<br />

Business<br />

B.C.<br />

B.C.<br />

B.P.L.<br />

B.P.L.<br />

7<br />

L.Ventaramma<br />

Rao (DurgaDevi<br />

amman)<br />

CPR<br />

Pvt<br />

temple<br />

Iswarya<br />

Ambika<br />

Platform<br />

6mt*1mt<br />

Iron Grill<br />

---- NO<br />

B.C.<br />

NO<br />

8 Y.Srinivasan<br />

Encroac<br />

her<br />

Resident<br />

5mt*1mt<br />

9<br />

Kambala<br />

Bantiyya<br />

Squatter<br />

Pan shop<br />

Rameneya<br />

pet<br />

Business<br />

B.C.<br />

B.P.L.<br />

10 Not known Kiosk<br />

11 Sharavam Kiosk<br />

12 Tatayulu Kiosk<br />

Mutton<br />

shop<br />

Sweet<br />

shop<br />

cycle<br />

shop<br />

Sarpavaram<br />

Jn to<br />

Sasikanth<br />

Nagar<br />

Gangaraj<br />

nagar<br />

Rameneya<br />

pet<br />

Iswarya<br />

Business<br />

Business<br />

Business<br />

B.C.<br />

B.C.<br />

B.C.<br />

B.P.L.<br />

B.P.L.<br />

B.P.L.<br />

13 TSR Prasad<br />

Encroac<br />

her<br />

Hardware<br />

Sarpavaram<br />

Jn<br />

platform<br />

B.C.<br />

NO


14<br />

Ahmaad Ali<br />

Shaw(Alisha Auto<br />

works)<br />

Encroac<br />

her<br />

Auto<br />

works<br />

Ramarao pet<br />

Thatched<br />

roof<br />

B.C.<br />

B.P.L.<br />

15 Chetli Krishna Kiosk<br />

cycle<br />

shop<br />

Ramarao pet<br />

business<br />

B.C.<br />

B.P.L.<br />

16<br />

Srinivas tiffin/pan<br />

shop<br />

Kiosk<br />

tiffin<br />

centre<br />

Ramarao pet<br />

Business<br />

B.C.<br />

B.P.L.<br />

17<br />

Vasmnachetti<br />

Sathibabu<br />

18 Pithani Gowni Kiosk<br />

Kiosk Pan shop VWW to<br />

Sasikanth<br />

Kondiyapalu Structure B.C.<br />

Sugar nagar<br />

cane<br />

Sarpavaram Business B.C.<br />

Platform<br />

B.P.L.<br />

B.P.L.<br />

NO<br />

19<br />

Venkata Rao<br />

(Kangadurga<br />

temple)<br />

CPR<br />

Pvt.templ<br />

e<br />

Sarpavaram<br />

3x2 m<br />

------<br />

20 Easiala Raj rao Squatter Eatery<br />

Sarpavaram<br />

Jn<br />

Business<br />

B.C.<br />

B.P.L.<br />

21 Raidu Sathibabu Squatter tea shop<br />

Sarpavaram<br />

Jn<br />

Business<br />

B.C.<br />

B.P.L.<br />

22<br />

Janappa Reddi<br />

Eswara rao<br />

Squatter<br />

fruit<br />

vendor<br />

Sarpavaram<br />

Jn<br />

Business<br />

B.C.<br />

B.P.L.<br />

23<br />

24<br />

Eaisala<br />

Govindarajulu<br />

Udhayagiri<br />

Moahan rao<br />

Squatter<br />

Squatter<br />

Eatery<br />

Eatery<br />

Sasikanth<br />

Nagar to<br />

Goigalupatu<br />

Sarpavaram<br />

Jn<br />

Sarpavaram<br />

Jn<br />

Business<br />

Business<br />

B.C.<br />

B.C.<br />

B.P.L.<br />

B.P.L.<br />

25<br />

Bethani<br />

Nagaratham<br />

Squatter<br />

Eatery<br />

Sarpavaram<br />

Jn<br />

Business<br />

B.C.<br />

B.P.L.<br />

26 Datta Pothirajulu Squatter<br />

Iron<br />

works<br />

Sarpavaram<br />

Jn<br />

Business<br />

B.C.<br />

B.P.L.<br />

27 Maltadu Baburai Squatter<br />

Cycle<br />

shop<br />

GoigalupaduJ<br />

n<br />

Business<br />

B.C.<br />

B.P.L.


28<br />

Vanragi<br />

Sathyanarayan<br />

Squatter<br />

Pan<br />

Artlakatta to<br />

VWW<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

29<br />

Jainu Narasimha<br />

murthi<br />

Squatter<br />

Residence<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

30<br />

Anasuri<br />

Subbalaxmi<br />

Encroch<br />

er<br />

Veg<br />

Indrapalam<br />

Market<br />

Structure<br />

B.C.<br />

B.P.L.<br />

31<br />

Yelamangali<br />

Jairaju<br />

Encroch<br />

er<br />

hotel<br />

Indrapalam<br />

Market<br />

Thatched<br />

roof<br />

B.C.<br />

B.P.L.<br />

32<br />

Vakkapalli<br />

Sathyanarayan<br />

Encroac<br />

her<br />

Pan<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

33 Rayudu Raman<br />

Encroac<br />

her<br />

cycle<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

34<br />

Qurranna Jogga<br />

rao<br />

Encroac<br />

her<br />

Dhobi<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

35<br />

Vijaykumar<br />

Rokkali<br />

Encroac<br />

her<br />

hotel<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

36<br />

Panchibelu Subba<br />

rao<br />

Encroac<br />

her<br />

pan<br />

Indrapalam<br />

Market<br />

Business<br />

B.C.<br />

B.P.L.<br />

38 Nageswar rao kiosk<br />

STD<br />

booth<br />

VWW to<br />

Jagnaikanpu<br />

r<br />

PR College<br />

Rd<br />

Business<br />

B.C.<br />

B.P.L.<br />

39<br />

Morra<br />

Ranganathan<br />

kiosk<br />

Cycle<br />

shop<br />

PR College<br />

Rd<br />

Business<br />

B.C.<br />

B.P.L.<br />

40<br />

Koppala<br />

Rajeswari<br />

kiosk<br />

Pan<br />

PR College<br />

Rd<br />

Business<br />

B.C.<br />

B.P.L.


ANNEXURE – II<br />

Details of the Stakeholders Meeting held on 27-11-2010.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!