<strong>Minutes</strong> <strong>of</strong> Pre<strong>bid</strong> Meeting held on 11 th December, 2012 at 11.00 Hrs in <strong>the</strong> Chambers <strong>of</strong> Commissioner,Anantapur Municipal Corporation, Anantapur.The following Officers attended <strong>the</strong> <strong>meeting</strong>:1. Sri. K. Neelakanta Reddy Municipal Commissioner2. Sri. J. Sreenivasulu Superintending Engineer,Anantapur Municipal Corporation3. Sri. N. Sivarami Reddy Executive Engineer,Anantapur Municipal Corporation4. Sri. S. Sateesh Chandra Deputy Executive Engineer,Anantapur Municipal Corporation5. Sri. K. Dushyant Deputy Executive Engineer,Anantapur Municipal CorporationNo Re<strong>pre</strong>sentatives <strong>of</strong> <strong>the</strong> Firms/ Bidders have attended <strong>the</strong> <strong>meeting</strong>.However M/S NCC Limited, Hyderabad have submitted certain queries by telefax vide Lr. No.NCC/HO/WED/1/ APMDP/ATP/2012-13/Atp CWSS/PKG-I/2012-13 Dated:10-12-2012. Replies/clarifications to <strong>the</strong>se queries will be uploaded athttp://eprocure.gov.in duly obtaining no objection from <strong>the</strong> World Bank.Sd/-CommissionerAnantapur Municipal CorporationAnantapur


Clarifications to <strong>pre</strong>-<strong>bid</strong> queries for Ananthapur ICB BidRef. to Clause Description in <strong>the</strong> <strong>bid</strong> document Suggestions/Clarifications/Modifications/queries by <strong>bid</strong>derThickness <strong>of</strong> BT RoadPlease provide <strong>the</strong> thickness <strong>of</strong> Bituminoustar roadSl.No.1 Bill <strong>of</strong>Quantities ItemNo. 204Drawing HSC APMDP/STP/17 & APMDP/STP/17/1, twodrawings are enclosed along with tenderdocument, Please confirm which drawingto be considered for House serviceconnection3 Bill <strong>of</strong>Quantities ItemNo. 2124 Bill <strong>of</strong>Quantities ItemNo. 2185 Bill <strong>of</strong>Quantities ItemNo. 2186 Bill <strong>of</strong>Quantities ItemNo. 2187 Bill <strong>of</strong>Quantities ItemNo. 304Transfering <strong>of</strong> existing <strong>of</strong> HSCPressure ratingIt is mentioned that “Transferring <strong>of</strong>existing House Service Connections to newmain including cost <strong>of</strong> MDPE pipes,specials, etc. all Complete”, please provide<strong>the</strong> detailed Specifications and drawings<strong>bid</strong>ders scope <strong>of</strong> work for this component.Please provide Pressure rating <strong>of</strong> 100 mdia. Single Chamber DI air valve.Soil bore log date Please provide Soil bore log data for all 10Nos. ELSR’s.DrawingPressure ratingPlease provide General arrangement andsectional drawing for ELSRSPlease provide Pressure rating <strong>of</strong> Dl DIFButterfly valves.ReplyThickness <strong>of</strong> BT road is 75 mm.Corrigendum will be issued.Both drawings correspond tomaking connection on DI pipe. Thedrawing in APMDP/STP/17/1 isdetailing <strong>of</strong> ferrule. The drawingpertaining to DI connection shall beadopted.The drawings and specs <strong>of</strong> newhouse service connection areapplicable for transferring <strong>of</strong>existing connection also.Pressure rating for 100 mm dia. DIair valves is PN 16. Corrigendum willbe issued.The available Bore log particularswill be uploaded as additionaldocument. Corrigendum will beissued.The <strong>bid</strong>der may visit <strong>the</strong> locationsand obtain necessary information.Pressure rating for DI BF valves is PN16. Corrigendum will be issued.


8 Bill <strong>of</strong>Quantities ItemNo. 4269 Bill <strong>of</strong>Quantities ItemNo. 504, 603,703, 719,804,807 etc10 Bill <strong>of</strong>Quantities ItemNo. 1101Capacity <strong>of</strong> Chlorine tonnerCentering & shutteringRailway CrossingIt is mentioned that “Chlorine tonner <strong>of</strong>capacity- 0-10 kg/hr”, we <strong>pre</strong>sume thatcapacity <strong>of</strong> chlorine tonner to be providedis 1000 Kgs each, please confirm.It is mentioned that “excluding centering,shuttering”, but <strong>the</strong>re is no provision forcentering & shuttering in particular BOQitems, we <strong>pre</strong>sume that centering &shuttering are extra items, please confirm.Quantity is not given for this item, we<strong>pre</strong>sume that <strong>the</strong>re is no need <strong>of</strong> railwaycrossing for this project, please confirm.11 General Autocad drawings Please provide tender drawings in autocadformat.12 Division IIIEarthworkClause No. 3.0General13 BDS Clause ITB14.7 Page No.29Shifting <strong>of</strong> public utilities. It ismentioned that “Prior to earthworkexcavations contractor shall identifyall <strong>the</strong> common property utilities(such as community taps,telephone/ Electric cables, StreetLighting etc) that will be affectedand provide advance notice to <strong>the</strong>affected parties with dates <strong>of</strong>restoration.”Excise Duty exemption:It is mentioned that “Bidders maylike to ascertain availability <strong>of</strong>excise/custom duty exemptionbenefits available in India to <strong>the</strong>contracts financed under WorldWe <strong>pre</strong>sume that common propertyutilities such as community taps,telephone/Electric cables, Street, Lighting,existing drains, cutting/ restoration <strong>of</strong>roads, etc that affects <strong>the</strong> pipelinealignment shall be informed to <strong>the</strong> Clientand advanced notices shall be issued by<strong>the</strong> Client. Also, payment/deposits if anyto be paid to o<strong>the</strong>r departments shall beborne by <strong>the</strong> Client, please confirm.Since this tender is funded by IBRD (Worldbank), and called for on “InternationalCompetitive Bidding” basis, we <strong>pre</strong>sumethat excise duty exemption is available forcement, steel, pipes, specials, valves,house service connection material, etc.,YesRate in corresponding BoQs shall beinclusive <strong>of</strong> centering andshuttering. Corrigendum will beissued.The quantity for item no. 1101 is100 Rmt. Corrigendum will beissued.S<strong>of</strong>t copy <strong>of</strong> <strong>the</strong> Auto CAD drawings canbe collected from <strong>the</strong> Employer or fromAPMDP Office.Please refer Division -2 (Section VII)The shifting charges for utilities will beborne by <strong>the</strong> Employer. However, if <strong>the</strong>utilities are damaged by <strong>the</strong> Contractorat <strong>the</strong> time <strong>of</strong> execution <strong>of</strong> work <strong>the</strong>damages and rectification costs will beborne by <strong>the</strong> Contractor only.Excise duty exemption will be providedfor pipes, specials and valves. The ULBwill help <strong>bid</strong>der in obtaining <strong>the</strong>excise/custom duty exemptioncertificate from <strong>the</strong> competentAuthority. No excise duty exemption isprovided for cement and steel.


14 Appendix to BidSchedule <strong>of</strong>AdjustmentDataTable A - LocalCurrency15 Appendix to BidSchedule <strong>of</strong>AdjustmentDataTable A - LocalCurrencyBank loan/credits. They are solelyresponsible for obtaining suchbenefits which <strong>the</strong>y haveconsidered in <strong>the</strong>ir <strong>bid</strong> and in case<strong>of</strong> failure to receive such benefitsfor reasons whatsoever, <strong>the</strong>employer will not compensate <strong>the</strong><strong>bid</strong>der (contractor). The <strong>bid</strong>der shallfurnish along with his <strong>bid</strong> adeclaration to this effect in <strong>the</strong>Declaration Format provided inSection IV <strong>of</strong> <strong>the</strong> <strong>bid</strong>dingdocuments.”Bidder’s proposed weighting:Weightings percentages for Labour,Steel, Cement, Pig Iron, HDPE,Machinery, Fuel & O<strong>the</strong>rs (b 1 to il)are not given in <strong>the</strong> table.Source <strong>of</strong> index*, Base value anddate* lt is mentioned that “[*These details will be entered by <strong>the</strong>employer at <strong>the</strong> time <strong>of</strong> signing <strong>of</strong>agreement based on values as on 28days prior to <strong>the</strong> deadline forsubmission <strong>of</strong> <strong>bid</strong>.]” It is also givenin document vide GeneralConditions Clause No. 1.1.3.1 that“Base Date” means <strong>the</strong> date 28 daysprior to <strong>the</strong> latest date forsubmission <strong>of</strong> <strong>the</strong> Tender"including <strong>the</strong>ir raw material and <strong>the</strong> sameshall be mentioned by <strong>the</strong> Bidder in <strong>the</strong>form attached to <strong>the</strong> Qualificationinformation in <strong>the</strong> <strong>bid</strong>, please confirm.Also, required Project Authority Certificateshall be issued by <strong>the</strong> Client to avail exciseduty exemption, please confirm.Kindly clarify whe<strong>the</strong>r <strong>the</strong> Bidder shall fillup <strong>the</strong> Weightings percentages during Bidsubmission or it shall be given by <strong>the</strong>Client.We <strong>pre</strong>sume that ‘Base date’ means <strong>the</strong>date 28 days prior to <strong>the</strong> latest date forsubmission <strong>of</strong> <strong>the</strong> Tender and ‘source <strong>of</strong>index’ shall be finalized and entered by <strong>the</strong>employer at <strong>the</strong> time <strong>of</strong> signing <strong>of</strong>agreement, please confirm.The weightings shall be specified by<strong>the</strong> <strong>bid</strong>der within a range <strong>of</strong> valuesgiven such that <strong>the</strong> total weighting is 1Yes. The weightings will be finalized by<strong>the</strong> Employer at <strong>the</strong> time <strong>of</strong> Agreementbased on values 28 days prior todeadline for submission <strong>of</strong> <strong>bid</strong>s.


16 Appendix to BidSchedule <strong>of</strong>AdjustmentData Table A -LocalCurrencySource <strong>of</strong> Index for Steel, Cement,Pig Iron & HDPE is mentioned as “AllIndia Whole sale price index (allcommodities) as published by <strong>the</strong>Economic Advisor to <strong>the</strong> Govt. <strong>of</strong>India, Ministry <strong>of</strong> Commerce andIndustry”17 General Price Adjustment forHouse Service ConnectionsEven though <strong>the</strong> source <strong>of</strong> Index for Steel,Cement, Pig Iron & HDPE is mentioned as‘all commodities’ in <strong>the</strong> given table, it ismentioned in foot note that <strong>the</strong> source <strong>of</strong>Index shall be finalized and entered by <strong>the</strong>employer at <strong>the</strong> time <strong>of</strong> signing <strong>of</strong>agreement. Kindly confirm <strong>the</strong> source <strong>of</strong>index for Steel, Cement, Pig Iron & HDPE,whe<strong>the</strong>r <strong>the</strong>y shall be considered as ‘allcommodities’ or steel rods for steel, greycement for cement, pig iron for pig iron &syn<strong>the</strong>tic resin for HDPE.Since price adjustment clauses are notsignificantly mentioned for house serviceconnections and <strong>the</strong>y are havingconsiderable value in <strong>the</strong> Tender, we<strong>pre</strong>sume that <strong>the</strong>y shall be claimed in costelement “o<strong>the</strong>rs” and concern indicesShall be “Wholesale Price Index (WPI) forall commodities”, please confirm.The source <strong>of</strong> index is given in Tableseparately to steel, cement and pigiron and <strong>the</strong> same will be applicable.There is no HDPE item in <strong>the</strong> BoQand hence no index is provided.YesSd/-CommissionerAnanthapur Municipal Corporation