1000 KL ELSRs (2Nos) at<br />
Dumulpeta.<br />
1600 KL ELSR at<br />
Bhaskaranagar<br />
1600 KL ELSR at<br />
Gaigolupadu.<br />
No impact 1184 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No impact 977 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No impact 712 sq.m. The<br />
proposed<br />
site belongs<br />
to ULB and<br />
is vacant<br />
No LA is<br />
required<br />
No LA is<br />
required<br />
No LA is<br />
required<br />
Total land Requirement = 3.45 Acres.<br />
(All the proposed sites belong to Kakinada <strong>Municipal</strong> Corporation and hence no land<br />
acquisition is required.)<br />
6. In order to assess the impacts of the sub- project, a social impact assessment was carried out by the<br />
DPR consultants which include the census and socio-economic survey among those potentially affected<br />
population. The assessment indicated that some vendors/Kiosks will be affected in the form of temporary<br />
shifting during laying of pipe lines for few days. They need to shift their kiosks temporarily during laying of<br />
distribution lines to a nearby place. They may continue their business after completion of pipeline work at<br />
the original place of business. The list of affected vendors is provided as Annexure -I.<br />
SOCIO-ECONOMIC PROFILE OF THE ROADSIDE VENDORS /KIOSKS:<br />
7. The census survey of those road side vendors (Kiosks)/CPRs going to be affected while laying the<br />
distribution pipelines was carried out in December, 2011, by consultants (M/s Voyants Solutions). The<br />
details of the census survey are provided in Annexure –I.<br />
POSITIVE BENEFITS DUE TO THE SUB-PROJECT:<br />
8. Not withstanding of the few above mentioned advese imapcts,th prosoed proejct will have<br />
positive impacts in the form of :<br />
<br />
<br />
<br />
reduction in water shortage<br />
increased access to potable water<br />
reduction in waterborne diseases