1000 KL ELSRs (2Nos) at<br />

Dumulpeta.<br />

1600 KL ELSR at<br />

Bhaskaranagar<br />

1600 KL ELSR at<br />

Gaigolupadu.<br />

No impact 1184 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No impact 977 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No impact 712 sq.m. The<br />

proposed<br />

site belongs<br />

to ULB and<br />

is vacant<br />

No LA is<br />

required<br />

No LA is<br />

required<br />

No LA is<br />

required<br />

Total land Requirement = 3.45 Acres.<br />

(All the proposed sites belong to Kakinada <strong>Municipal</strong> Corporation and hence no land<br />

acquisition is required.)<br />

6. In order to assess the impacts of the sub- project, a social impact assessment was carried out by the<br />

DPR consultants which include the census and socio-economic survey among those potentially affected<br />

population. The assessment indicated that some vendors/Kiosks will be affected in the form of temporary<br />

shifting during laying of pipe lines for few days. They need to shift their kiosks temporarily during laying of<br />

distribution lines to a nearby place. They may continue their business after completion of pipeline work at<br />

the original place of business. The list of affected vendors is provided as Annexure -I.<br />

SOCIO-ECONOMIC PROFILE OF THE ROADSIDE VENDORS /KIOSKS:<br />

7. The census survey of those road side vendors (Kiosks)/CPRs going to be affected while laying the<br />

distribution pipelines was carried out in December, 2011, by consultants (M/s Voyants Solutions). The<br />

details of the census survey are provided in Annexure –I.<br />

POSITIVE BENEFITS DUE TO THE SUB-PROJECT:<br />

8. Not withstanding of the few above mentioned advese imapcts,th prosoed proejct will have<br />

positive impacts in the form of :<br />

<br />

<br />

<br />

reduction in water shortage<br />

increased access to potable water<br />

reduction in waterborne diseases