suggestion has been received to replace the damaged distribution lines which has been taken<br />

care of in DPR. The details of the meeting are provided in Annexure –II.<br />

ASSESSMENT OF ADVERSE SOCIAL IMPACTS<br />

5. In order to ensure that the project do not harm the livelihood of the people due to the proposed<br />

project interventions, an assessment of adverse impacts was carried out with an objective of proposing<br />

suitable mitigation measures where such impacts envisaged. While formulating the subproject, various<br />

efforts have been made to minimize resettlement. During planning and designing, attempt has been<br />

made to restrict the construction works within the ULB lands and RoW of Government/ ULB land.<br />

Despite these efforts, minor impact on some roadside vendors/ kiosks and two CPRs(compound walls<br />

of temples) could not be avoided.<br />

The impacts are ascertained for each component of the project based on the proposed site of<br />

construction /alignment. Necessity of land acquisition, Impacts on public/ private properties, necessity for<br />

temporary relocation of roadside kiosks and disturbance to business have been ascertained for each<br />

component. The details of proposed investment components and the potential impacts in those<br />

components are described below.<br />

The purpose of this Abbreviated Resettlement Action Plan (ARAP) is to propose the mitigation measures<br />

to those few shopkeepers affected due to the project activities in order to support them during the<br />

transition period. These impacts are of minor in nature and only impact for few days during laying of<br />

distribution lines (which will be done in stretches). All affected people may continue to do their business<br />

activities after completion of pipeline work at their current place of vending/business subject to the local<br />

laws.<br />

Component Wise Impacts:<br />

SNo. Component IR Impact<br />

Land<br />

Requirement<br />

Land<br />

Ownership<br />

Remarks<br />

Package - I<br />

1 Construction of Water<br />

Bound Macadam (WBM)<br />

service road from<br />

Aratlakatta SS Tank to<br />

Kovada railway Crossing<br />

for a length of 3.65 Km.<br />

No Impact 7 Acres of<br />

land required<br />

for this road<br />

The land<br />

belongs to<br />

ULB and is<br />

vacant.<br />

No LA<br />

required.<br />

2 Gravity main from Aratla<br />

katta ss tank to victoria<br />

ww.<br />

Package - II<br />

Squatters-2<br />

Encroachers-7<br />

------ ----- Proposed in<br />

the RoW of<br />

existing<br />

road.