suggestion has been received to replace the damaged distribution lines which has been taken<br />
care of in DPR. The details of the meeting are provided in Annexure –II.<br />
ASSESSMENT OF ADVERSE SOCIAL IMPACTS<br />
5. In order to ensure that the project do not harm the livelihood of the people due to the proposed<br />
project interventions, an assessment of adverse impacts was carried out with an objective of proposing<br />
suitable mitigation measures where such impacts envisaged. While formulating the subproject, various<br />
efforts have been made to minimize resettlement. During planning and designing, attempt has been<br />
made to restrict the construction works within the ULB lands and RoW of Government/ ULB land.<br />
Despite these efforts, minor impact on some roadside vendors/ kiosks and two CPRs(compound walls<br />
of temples) could not be avoided.<br />
The impacts are ascertained for each component of the project based on the proposed site of<br />
construction /alignment. Necessity of land acquisition, Impacts on public/ private properties, necessity for<br />
temporary relocation of roadside kiosks and disturbance to business have been ascertained for each<br />
component. The details of proposed investment components and the potential impacts in those<br />
components are described below.<br />
The purpose of this Abbreviated Resettlement Action Plan (ARAP) is to propose the mitigation measures<br />
to those few shopkeepers affected due to the project activities in order to support them during the<br />
transition period. These impacts are of minor in nature and only impact for few days during laying of<br />
distribution lines (which will be done in stretches). All affected people may continue to do their business<br />
activities after completion of pipeline work at their current place of vending/business subject to the local<br />
laws.<br />
Component Wise Impacts:<br />
SNo. Component IR Impact<br />
Land<br />
Requirement<br />
Land<br />
Ownership<br />
Remarks<br />
Package - I<br />
1 Construction of Water<br />
Bound Macadam (WBM)<br />
service road from<br />
Aratlakatta SS Tank to<br />
Kovada railway Crossing<br />
for a length of 3.65 Km.<br />
No Impact 7 Acres of<br />
land required<br />
for this road<br />
The land<br />
belongs to<br />
ULB and is<br />
vacant.<br />
No LA<br />
required.<br />
2 Gravity main from Aratla<br />
katta ss tank to victoria<br />
ww.<br />
Package - II<br />
Squatters-2<br />
Encroachers-7<br />
------ ----- Proposed in<br />
the RoW of<br />
existing<br />
road.