J-3999.7-FM Flood Risk Assessment & SUDS Design, Cave Farm, Nr Pitney, Somerset V2<br />

___________________________________________________________________________________________<br />

5.0 DESIGN STANDARDS<br />

Design of the site drainage infrastructure and Sustainable Urban Drainage System (SUDS) is<br />

to be carried out in line with best practice, and to industry standard design procedures. A<br />

number of public<strong>at</strong>ions, including design guidance and best practice guidance will be applied<br />

to different components of the final infrastructure. The sections below provide an overview of<br />

the design standards to be used on this project for various aspects of the infrastructure<br />

design.<br />

5.1 The CIRIA SUDS Manual<br />

This document is a comprehensive public<strong>at</strong>ion covering design, construction, oper<strong>at</strong>ion and<br />

maintenance of SUDS. The advice and best practice outlined in this document has been<br />

utilised in the design of the site SUDS fe<strong>at</strong>ures, which have been detailed in this report.<br />

5.2 Building Regul<strong>at</strong>ions Part H<br />

Building Regul<strong>at</strong>ions Part H ‘Drainage and Waste Disposal’ covers the design and install<strong>at</strong>ion<br />

of surface w<strong>at</strong>er and foul w<strong>at</strong>er systems. All priv<strong>at</strong>e drainage including pipes, manholes, down<br />

pipes, and other drainage infrastructure on the site should be designed and installed in<br />

accordance with this document.<br />

5.3 The Wallingford Procedure<br />

Developed by HR Wallingford this public<strong>at</strong>ion covers the design of urban drainage systems. In<br />

addition, the document includes regional rainfall d<strong>at</strong>a for use in design for varying return<br />

period events.<br />

Basic sizing calcul<strong>at</strong>ions for the swales and the estim<strong>at</strong>ion of the runoff volumes have been<br />

made using this method. Further modific<strong>at</strong>ion of these calcul<strong>at</strong>ions, to enhance the design,<br />

was carried out using WinDes software which is also based in part on the Wallingford<br />

Procedure<br />

P:\Job Files 3900-3999\J-3999-FM AEE Flood Risk Assessments\J-3999.7-FM Cave Farm\Report V2<br />

6