04.06.2015 Views

proposed solar park development at cave farm, nr pitney, somerset ...

proposed solar park development at cave farm, nr pitney, somerset ...

proposed solar park development at cave farm, nr pitney, somerset ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

____________________________________________________________________________________________<br />

J-3999.7-FM Flood Risk Assessment & SUDS Design, Cave Farm, Nr Pitney, Somerset V2<br />

___________________________________________________________________________________________<br />

7.0 AFFECT ON ADJACENT SITES<br />

As outlined in Section 6.0 the extent of impermeable areas introduced across the site by the<br />

<strong>development</strong> is extremely small. Therefore any additional runoff from the impermeable areas<br />

will be small and more than adequ<strong>at</strong>ely managed by the swale system outlined in Section<br />

6.0. As such there will be no impact on the nearby w<strong>at</strong>ercourses and neighbouring sites as a<br />

result of the <strong>proposed</strong> <strong>development</strong>. In addition, the pragm<strong>at</strong>ic approach to the design of the<br />

swales will provide an improved storage and interception capacity and will reduce any risks to<br />

adjacent sites from runoff, when compared to the pre-<strong>development</strong> situ<strong>at</strong>ion.<br />

P:\Job Files 3900-3999\J-3999-FM AEE Flood Risk Assessments\J-3999.7-FM Cave Farm\Report V2<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!