04.06.2015 Views

proposed solar park development at cave farm, nr pitney, somerset ...

proposed solar park development at cave farm, nr pitney, somerset ...

proposed solar park development at cave farm, nr pitney, somerset ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

____________________________________________________________________________________________<br />

J-3999.7-FM Flood Risk Assessment & SUDS Design, Cave Farm, Nr Pitney, Somerset V2<br />

___________________________________________________________________________________________<br />

• Inspection and cleaning of the swales to ensure th<strong>at</strong> the capacity and infiltr<strong>at</strong>ion r<strong>at</strong>es<br />

are maintained.<br />

The drainage system will remain in priv<strong>at</strong>e ownership; the site oper<strong>at</strong>or would therefore be<br />

responsible for the maintenance of the drainage fe<strong>at</strong>ures within the site. The developer of the<br />

site should make this responsibility clear to the site oper<strong>at</strong>or by providing a maintenance plan<br />

for the <strong>development</strong>.<br />

6.5 Summary<br />

Percol<strong>at</strong>ion testing has not been conducted <strong>at</strong> the <strong>proposed</strong> <strong>development</strong> site, due to the<br />

small area of impermeable surface introduced by the <strong>development</strong>. It is anticip<strong>at</strong>ed th<strong>at</strong> there<br />

will be only a slight increase in runoff from the <strong>development</strong> which can be adequ<strong>at</strong>ely<br />

managed on site by the swales outlined in Section 6.3.<br />

The conceptual design of a surface w<strong>at</strong>er drainage scheme has been carried out based on the<br />

current <strong>proposed</strong> <strong>development</strong> layout. This has demonstr<strong>at</strong>ed th<strong>at</strong> the surface w<strong>at</strong>er runoff<br />

from the <strong>development</strong> can be managed entirely on site so as not to unduly affect the flood<br />

risk to neighbouring areas. Furthermore the <strong>proposed</strong> system serves to reduce runoff r<strong>at</strong>es to<br />

less than the undeveloped r<strong>at</strong>e.<br />

P:\Job Files 3900-3999\J-3999-FM AEE Flood Risk Assessments\J-3999.7-FM Cave Farm\Report V2<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!