Volume of Runoff Cacul<strong>at</strong>ions<br />

Client: AEE<br />

Engineer: H2OK Consultants<br />

Cave Farm, Nr Pitney,<br />

Loc<strong>at</strong>ion:<br />

Somerset<br />

Site:<br />

D<strong>at</strong>e:<br />

Cave Farm<br />

06/12/2012<br />

SITE INFORMATION<br />

Pre-<strong>development</strong> total area<br />

Pre-<strong>development</strong> permeable area<br />

Pre-<strong>development</strong> impermeable area<br />

Post-<strong>development</strong> total area<br />

Post-<strong>development</strong> permeable area<br />

Post-<strong>development</strong> impermeable area<br />

RAINFALL EVENT INFORMATION<br />

Return period<br />

Whole area greenfield runoff r<strong>at</strong>e inclusive of 20% increase due to clim<strong>at</strong>e change (see <strong>at</strong>tached MicroDrainage<br />

calcs (SAAR values multiplied by 1.2))<br />

IoH124 post-<strong>development</strong> runoff r<strong>at</strong>e inclusive of 20% increase due to clim<strong>at</strong>e change (see <strong>at</strong>tached<br />

MicroDrainage calcs (SAAR values multiplied by 1.2))<br />

Dur<strong>at</strong>ion of rainfall event<br />

Depth of Rainfall (calcul<strong>at</strong>ed using Wallingford Procedure including 20% increase for clim<strong>at</strong>e change)<br />

115000 m²<br />

115000 m²<br />

0 m²<br />

115000 m²<br />

114650 m²<br />

350 m²<br />

100 year<br />

151.3 l/s<br />

151.3 l/s<br />

6 hours<br />

80.04 mm<br />

RUNOFF CALCULATION<br />

Pre-<strong>development</strong> permeable area runoff<br />

3268080 litres<br />

Pre-<strong>development</strong> impermeable area runoff<br />

0 litres<br />

Total pre-<strong>development</strong> runoff<br />

3268.1 m³<br />

Post-<strong>development</strong> permeable area runoff<br />

3268080 litres<br />

Post-<strong>development</strong> impermeable area runoff<br />

28014 litres<br />

Total post-<strong>development</strong> runoff (without mitig<strong>at</strong>ion)<br />

3296.1 m³<br />

Difference in runoff 28 m³