Company Highlights<br />
• <strong>GCS</strong> successfully completed the formwork and concrete<br />
placement contract for the new Midland Health Campus and<br />
QEII carpark projects.<br />
• <strong>GCS</strong> awarded total of $19.4m formwork and concrete works<br />
on Brookfield Place Tower 2 in Perth’s CBD.<br />
• <strong>GCS</strong> commenced the principal scaffolding contract for<br />
Woodside’s Northwest Shelf Project (all onshore and<br />
offshore locations) for an initial three years with two further<br />
extension options.<br />
• <strong>GCS</strong> was chosen to undertake the installation of the façade<br />
on the $1.2b Perth Children’s Hospital Project, currently being<br />
constructed by John Holland and due for completion in 2015.<br />
• <strong>GCS</strong> awarded $5m formwork and concrete works for the May<br />
Holman Centre, establishing 15,000m 2 of prime office space<br />
on St. Georges Terrace in the heart of Perth’s CBD.<br />
• <strong>GCS</strong> appointed Kaefer’s exclusive supply chain partner for<br />
the Ichthys Project in Darwin.<br />
• <strong>GCS</strong> completes the supply of final 2,400 tonne of scaffold to<br />
CKJV (CBI Kentz JV) for Chevron’s Gorgon project.<br />
Financial Results<br />
REVENUE ($m)<br />
–<br />
<strong>2014</strong> $160.1m 20%<br />
<strong>2014</strong> $29.1m 39%<br />
2013 $200.3m<br />
EBIT ($m) –<br />
<strong>2014</strong> $17.1m 44%<br />
2013 $30.4m<br />
NET DEBT<br />
TO EQUITY<br />
<strong>2014</strong> 32%<br />
2013 43%<br />
* pp = percentage points<br />
–<br />
11pp *<br />
EBITDA ($m) –<br />
2013 $47.7m<br />
NPAT ($m) –<br />
<strong>2014</strong> $8.2m 47%<br />
2013 $15.3m<br />
EPS (¢) –<br />
<strong>2014</strong> 4.8¢ 51%<br />
2013 9.7¢<br />