- Page 1 and 2: The Role of Distributed Generation
- Page 3 and 4: Table of Contents EXECUTIVE SUMMARY
- Page 5 and 6: EXECUTIVE SUMMARY The nature of bus
- Page 7 and 8: Power Quality Costs Industries and
- Page 9 and 10: Approximately 90% of the PQ equipme
- Page 11 and 12: Table ES2 Mitigation Effectiveness,
- Page 13: New York City, uses its standby die
- Page 17 and 18: 2. INTEGRATON OF DISTRIBUTED GENERA
- Page 19 and 20: dispatching system as part of the c
- Page 21 and 22: Figure 2.7 shows an ultra-high reli
- Page 23 and 24: There are no reverse power or direc
- Page 25 and 26: 3. CUSTOMER PERSPECTIVE ON POWER QU
- Page 27 and 28: egrounding in the machine shop. It
- Page 29 and 30: plant specializing in superalloys f
- Page 31 and 32: 4. ECONOMIC ANALYSIS OF INTEGRATED
- Page 33 and 34: The estimated costs of a hypothetic
- Page 35 and 36: 4.3 Distributed Generation Economic
- Page 37 and 38: The results show a significant incr
- Page 39 and 40: The system has a 90% load factor (w
- Page 41 and 42: 5. CONCLUSIONS The project team spo
- Page 43 and 44: that can integrate the power electr
- Page 45 and 46: APPENDIX A SUMMARY OF POWER QUALITY
- Page 47 and 48: Figure A.2 Normal Operating Region
- Page 49 and 50: Transients are also called spikes,
- Page 51 and 52: Voltage Interruptions Voltage inter
- Page 53 and 54: Flicker Flicker is a modulation of
- Page 55 and 56: While the typical voltage sag or in
- Page 57 and 58: companies, airline reservation syst
- Page 59 and 60: Table A.4 Estimated Total Cost of P
- Page 61 and 62: $900 million per year market in the
- Page 63 and 64: from long-term outages only as it t
- Page 65 and 66:
Figure A.9 Dynamic Voltage Restorer
- Page 67 and 68:
Rectifier/Charger: The rectifier/ch
- Page 69 and 70:
APPENDIX B: REVIEW OF NEW YORK POWE
- Page 71 and 72:
effective, power quality disturbanc
- Page 73 and 74:
The Project team reviewed the 2002
- Page 75 and 76:
NYSEG CAIDI MEASURES 1999 - 2002 WI
- Page 77 and 78:
Power Quality A section of the 2002
- Page 79 and 80:
system were the fourth most frequen
- Page 81 and 82:
The SAIDI (with storm) index showed
- Page 83 and 84:
B.3 Niagara Mohawk Power Quality 20
- Page 85 and 86:
Power Quality Investigation Managem
- Page 87 and 88:
APPENDIX C CASE INFORMATION BASED O
- Page 89 and 90:
Considered Distributed Generation?
- Page 91 and 92:
Measures to Increase Reliability Th
- Page 93 and 94:
Harbec was interested in a renewabl
- Page 95 and 96:
With the old Unifins, when they wer
- Page 97 and 98:
Since the blackout, JHMC has not ye
- Page 99 and 100:
factor quality correction and/or ad
- Page 101 and 102:
generator and 2 -2MW backup generat
- Page 103 and 104:
PQ Related Costs Voltage/current sa
- Page 105 and 106:
e started and stopped causing curre
- Page 107 and 108:
Case Study - Major Network Televisi
- Page 109 and 110:
space constraints, and fuel cost un
- Page 111 and 112:
APPENDIX D POWER QUALITY GLOSSARY 4
- Page 113 and 114:
Forward Transfer Impedance - The am
- Page 115 and 116:
Nominal Voltage - The normal or des
- Page 117 and 118:
Semiconductor - An electronic condu